Date Submitted:
TPV-00007
24 Oct 2014
o.
Name of document which TPV comment on : Calculation sheet (Temporary Structural)
The following matters must be considered
The
Design
Consultant
Page 1 of 10
order
(5m).
Therefore,
as
interval
between
as
interval
between
modeled
then
analyzed
by
Page 2 of 10
bearing
capacity
and
stability.
foundation-construction
once
and
shadow-
received.
However,
in
contain
construction
model
for
neighboring
loads
without
foundation
or
pile
impact
to
neighbouring
In
modeling,
construction
foundation
bottom
for
shallow
example,
for
pile-foundation-structure,
evaluated
matter.
by
pile
element
4
- What
settlement
on
construction
structure
as
3PVC
has
understood
that
Design
pile-foundation-construction
criteria
by
the
Design
is
agreement
TCVN
10304:2014.
For
example,
total
on
evaluation,
it
is
provided
is 10cm.
referring
standard
in
5
- The Design Consultant mentioned loads due
Consultant
calculate
has
not
provided
basis
for
load
of
75kN/m2,
is
Otherwise,
requested
that
3PVC
the
is
Design
not
in
accordingly.
ok
7
-
Company
containing
building, 162kN/m2.
information
of
neighbouring
Consultant
has
not
presented
the
evaluation
should
wall
method.
deformation.
construction
be
stage
The
Design
causing
maximum
important
construction stage.
for
Design
settlement
Page 6 of 10
deformation.
selecting
Consultant
of
It
the
is
support
provides
ground
and
11
Opera View Hotel (surface load for section 4-4), located 2m away
Ok
for section 4-4 become smaller than surface load of section 3-3
12
- The section 4-4 (in 3PVs understanding) was subdivided into two
sections, 4-4 and 7-7. Detailed calculation for these two sections
Ok
Pumping
alternative
during
insignificant.
Name of document which TPV comment on : Drawing list
1
- In principle SMJO does not change the design from tender stage
Page 7 of 10
No
objection
to
Clients
example:
- Width of foundation;
- Distance from D-Wall to Kingpost;
- Thickness of floor (BF1);
- Some more details in section 1-1 to 7-7.
2
- Noted.
ok
- It is required to add
ok
Due
to
insufficient
provided
following
example:
sharing.
consideration:
principals
for
DSRSC-ES
(Shield
Tunnel:
will
12/2002);
Page 8 of 10
use
these.
However,
DSRSC-ST
(Steel-Concrete
Hybrid
- For
calculations
whose
Report
and
in
DSRSC-DL
(Urban
Mountain
evaluation.
Tunnel:
05/2002); DSRSC-UT
(Foundation
Retaining
Structures
Structures:
and
06/2000);
addition,
DSRSC-FS
(Steel-Concrete
Composite
Circular
For
Temporary
BXD
Structures
SPECIFICATIONS
foreign
standards in construction in
applying
FOR
No.
40/2009/TT-
-
Prepared by:
Approved by:
Tran Van Tu
Vu Minh Tri
Civil Engineer
Date: 25 /10/2014
Date: 25 /10/2014
Page 10 of 10