Haridwar
Operating Process and work instruction
Connection: Connect the meter on Three Phase fixed output Phantom source quick connecter
Check if meters on bench are ready for test (current and voltage clamps are correctly
Connected). And avoid the shorting between phase to phase and phase and neutral; ensure that
meter are LT pass, now press the CMR-I Reset button, this operation is successful if protect LED
becomes off other wise check meter terminal connection and repeat it again and switch on MCB and
this all process to be repeat every time when we load the meter
7. Select Meter Parameter: After selection of meter type, Enter meter parameter ie. Meter
constant, Number of pulses, Voltage, current, power factor, Frequency etc
8. Run the power source: First press the start button, this help to check the stability of output power
of power source and after that press test button this stop the output, now press UI button to
provide the power to the meter as per selected parameter, to set the error of meter as per
requirement, adjust the power by little change of parameter
9. Adjust / Calibrate of units sensors
The Adjustment / Calibration of units sensors is required every time when changing meters
and or power source turned off
Calibration Point
Permissible
Limit(%)
Verification
Points
Permissible
Limit(%)
As per test
Plan
As per test
Plan
As per test
Plan
As per test
Plan
as written
instruction by
supervisor
as written
instruction by
supervisor