TowingSailaway Transportation and Installation Plan
TowingSailaway Transportation and Installation Plan
Limited (993414-U)
Document No
Rev
THELFPSO00GNPEP-00006
AB
TOWING/SAILAWAY,
TRANSPORTATION AND
INSTALLATION PLAN
AB
8 Apr 2015
Final Doc
SP
LZ
JRM
24 Feb 2015
SP
LZ
JRM
B2
12 Sept 2014
MAB
LZ
KSM
B1
18 July 2014
MAB
LZ
KSM
11 Jun 2014
MAB
LZ
KSM
17 April 2014
PMT
LZ
KSM
Rev
Date
Status
Prepared
by
Checked
by
Approved
by
NIPPON
THE-LFPSO-00-GN-PEP-00006
Rev. AB
TABLE OF CONTENTS
1
Page 2 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
REVISION SUMMARY
Rev.
A
B
B1
B2
B3
C
AB
Section
Page 3 of 27
Description
IDC
Issued for Review
Re-issued for Review
Re-issued for Review
Re-issued for Review
Issued for Approval
Final Doc
THE-LFPSO-00-GN-PEP-00006
Rev. AB
ABBREVIATIONS
AFR
BOD
CBE
CIDB
CIF
CLASS
COW
CPFF
CPN
CSU
CV
DCR
DCS
DDE
DOSH
EPCIC
ESD
FEED
FPSO
HAZID
HAZOP
HIP
HIT
HP
HSE
HVAC
ITB
ITP
ITR
JPJ
JSA
KPI
LLI
LOA
LOI
Page 4 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
LQ
LSR
LV
LWP
MC
MDR
MOM
MPR
MV
NCR
NIOSH
NOCH
OIC
P&I
PCS
PCSB
PDMS
PEQP
PLC
PO
PPE
PQMP
PSP
QA
QC
QRA
RAM
RFSU
RLEC
SOLAS
TBE
THHE
TQ
WBS
WPR
WPS
WQT
WRR
Living Quarters
Life-Saving Rules
Low Voltage
Layang Wellhead Platform
Mechanical Completion
Master Deliverables Register
Minutes of Meeting
Monthly Progress Report
Medium Voltage
Non Conformance Report
National Institute of Occupational Safety and Health
Notification of Change
Offshore Installation Contractor
Protection & Indemnity
Project Completion System
Petronas Carigali Sdn Bhd
Plant Design Management System
Project Execution and Quality Plan
Programmable Logic Controller
Purchase Order
Personal Protective Equipment
Project Quality Management Plan
Project Specific Procedure
Quality Assurance
Quality Control
Quantitative Risk Assessment
Reliability, Availability and Maintainability
Ready for Start Up
Repair, Life Extension and Conversion
Safety of Life at Sea
Technical Bid Evaluation
TH Heavy Engineering Berhad
Technical Query
Work Breakdown Structure
Weekly Progress Report
Welding Procedure Specification
Welder Qualification Test
Work Readiness Review
Page 5 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
DEFINITIONS
CONTRACT
FACILITY
FPSO Layang
FPSO SITE
NIPPON
OWNER
SUBCONTRACTOR
SERVICES
VENDOR
WORKSITE(S)
WORK
means SERVICES
Page 6 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
General
1.1.1
1.2
The FPSO will be towed to Layang offshore field with a manned tow,
who will be operating and fine tuning the vessel systems, and
monitoring all systems and areas of the FPSO for problems and
failures. The towing/sailaway plan will be as per below:
i.
ii.
1.1.2
Owner will separately fabricate, transport, install, Hook-Up, pretension, inspect, test, the Mooring System ready at Layang offshore
field for connection with the FPSO to the coordinates specified in
Section 5.1 of Basis of Design document in APPENDIX I-2
NIPPON
LISTOF
TECHNICAL
DOCUMENTS
AND
DRAWINGS. Owner will ensure that this activity is coordinated
and completed prior to arrival of FPSO in Layang field.
1.1.3
1.1.4
Owner will ensure that all activities related to their scope of work on
Sailaway, Tow, and installation of FPSO and mooring systems are
carried out under intimation and approval of Classification and
approved Marine Warranty Surveyors appointed for the operation.
Scope
1.2.1
1.2.2
Page 7 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.3
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
Safety
1.3.1
1.3.2
OWNER will have full and complete responsibility for all OWNER
activities being performed on the FPSO and for the safety and
security of all personnel on-board the FPSO.
1.3.3
Page 8 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.4
1.3.4
1.3.5
1.3.6
1.3.7
1.4.2
1.4.3
iv.
v.
vi.
vii.
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.4.4
1.5
Page 10 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
ix.
x.
xi.
xii.
Safety procedures;
xiii.
Page 11 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.6
xiv.
xv.
xvi.
xvii.
xviii.
xix.
Transport supervision,
procedures;
authorities,
and
communication
xx.
xxi.
xxii.
xxiii.
xxiv.
Fendering;
xxv.
xxvi.
xxvii.
xxviii.
1.5.2
1.5.3
OWNER will verify that all acceleration forces, bending moments and
shearing forces in the FPSO during Transportation are within
acceptable limits, and will submit transport calculations to NIPPON
and Marine Warranty Surveyor.
1.5.4
Navigation
Page 12 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.7
1.6.1
1.6.2
1.7.2
Ship-loose Items
xxx.
xxxi.
1.7.3
1.7.4
Piece number;
b.
c.
Sea-Fastening
xxxii.
xxxiii.
The transport Vessel being utilized shall be cleared of all nonessential materials and debris prior to towing. All loose
materials and equipment left on the transport Vessel shall be
secured for the tow by either welding or lashing to the deck. All
Sea-fastenings between modules, decks or internal
components to transport Vessels shall be designed considering
the most severe condition that may be encountered during
transportation.
Page 13 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
xxxiv.
xxxv.
b.
c.
Where
required
by
SUBCONTRACT,
such
SUBCONTRACTOR certifying in writing that they have
observed, inspected and/or supervised the Installation of
their equipment or subsystems and were present during
whatever performance testing and Commissioning that
was conducted and they are satisfied that their equipment
and/or subsystem shall meet the requirements of NIPPON
Supplied Documentation;
d.
e.
f.
g.
h.
Page 14 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.7.5
i.
j.
k.
xxxvii.
b.
c.
d.
Page 15 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.7.6
e.
f.
g.
h.
xxxviii.
xxxix.
NIPPON formally signs off all Punch List items except those
mutually agreed by NIPPON to be implemented later;
xl.
xli.
xlii.
1.7.7
Pre-mobilization Meeting
xliii.
Ten (10) days prior to the Sailaway Date of the FPSO, OWNER
will coordinate, chair, minute and participate in a PreMobilization meeting. The meeting shall be attended by the
relevant Key Personnel of OWNER, NIPPON and NIPPONs
Other Contractors. The aims of the meeting include, but are not
limited to:
a.
b.
c.
Page 16 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
d.
xliv.
1.7.8
1.7.9
xlvi.
Damage
xlvii.
1.8
General
xlviii.
xlix.
Page 17 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
l.
li.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
Page 18 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
lii.
1.8.2
liv.
b.
c.
d.
e.
f.
g.
Page 19 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.8.3
i.
1.8.4
h.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
Transportation Barges
Page 20 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.8.5
lvi.
lvii.
lviii.
lix.
Construction Barge
lx.
lxi.
b.
c.
Page 21 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.8.6
lxii.
lxiii.
Prior to lifting any anchors form the seabed, the location shall
be surveyed to confirm that the anchor has not slipped.
lxiv.
lxv.
b.
c.
d.
lxvii.
lxviii.
OWNER will assume all risk for any time lost due to waiting on
weather during Transportation and Installation of the Mooring
System
Page 22 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.8.7
Pre-Installation survey;
b.
c.
d.
e.
Lay-up of the mooring lines until arrival of the FPSO onsite; and
f.
lxx.
lxxi.
lxxii.
lxxiii.
lxxiv.
lxxv.
THE-LFPSO-00-GN-PEP-00006
Rev. AB
1.8.8
lxxvi.
lxxvii.
1.8.9
a.
b.
c.
d.
1.9
OWNER will assume all risk for any time lost due to waiting on
weather during Installation of FPSO.
Logistics Support
1.9.1
OWNER will provide all logistical support required to support all its
offshore activities. The SERVICES shall be provided for the duration
of the WORK at the location involved. This support shall include, but
not be limited to the following:
lxxx.
lxxxi.
THE-LFPSO-00-GN-PEP-00006
Rev. AB
lxxxii.
Offshore Communications
a.
lxxxiii.
Security Services
a.
lxxxiv.
lxxxviii.
lxxxvii.
lxxxvi.
lxxxv.
Page 25 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
a.
1.10
2.
General
lxxxix.
b.
c.
d.
e.
f.
g.
Page 26 of 27
THE-LFPSO-00-GN-PEP-00006
Rev. AB
h.
i.
j.
Page 27 of 27