Content
Regulatory Aspects
Page 2
Content
Regulatory Aspects
Page 3
3500
MNRE amendment for covering
grid connected rooftops
3063
2632
Euro/Wp
2500
1.5
2000
1686
1.32
1.52
Rooftop PV ~41.3MW
3000
1500
1
941
0.55
0.56
MW
2.17
Target ~ 10000 MW in
3 years
1000
0.54
0.5
0.71
2
10
38
FY09
FY10
FY11
500
0
FY12
Axis Title
FY13
FY14
FY15*
Transmission
Network
Distribution
Network
1 kWh
1 kWh generated at load centre can save generation of 1.5 kWh by fossil fuel based plants
Parameters
Unit
FY 15
Disallowance in Power
Purchase
Unit
FY 09
FY 10
FY 11
Sales
GWh
63183
Units Procured
GWh
2609
3675.38
1601.76
D Loss
23.50%
/kWh
7.05
5.16
7.49
GWh
82952
Ceiling Rate
/kWh
4.92
5.00
5.87
D Loss
GWh
19409
Disallowance
Cr
555.87
60.22
259.86
Page 5
Feed-in tariff
Model/Draft Power Purchase Agreement
Solar Renewable Purchase Obligation
Page 6
Page 7
Content
Regulatory Aspects
Page 8
Off-Grid
Gross
Metering
Sale to Grid
Standalone
Mini-Grid
Rural
Net
Metering
SelfConsumption
Bi-lateral Sale
RESCO
Emerging
Segment
Page 9
600
1.00%
452
0.80%
1.00%
514
1.00%
500
Add. Capacity may implement ~
300 MW
540
400
0.60%
MW
1.00%
300
0.50%
0.40%
200
223
0.25%
0.20%
100
99
0.00%
0
2010-11
2011-12
2012-13
2013-14*
Already Commissioned 17 MW
2014-15*
Solar Purchase Obligation shall compel Obligated Entities to purchase generation from RTPV
Page 10
Solar
Meter
Utility
Meter
Distribution
Transformer
TSO
DSO
High acceptability - well proven model worldwide and has relatively low risk for developer
RTPV project can be quickly rolled out due precedence of this mechanism in large scale
projects less regulatory intervention and capacity building
DISCOMs, Open Access Consumers and Fossil Fuel based Captive Consumers
Page 11
Net
Metering
Gross
Metering
Page 12
Page 13
FY09
Reference
PETITION NO. :
624,625,626,627,628
OF 2009
31 March 2010
FY10
FY11-FY13
FY14
FY15
PETITION NO. :
PETITION NO.: 738/2011 Case No. 02,03,04,05,06
624,625,626,627,628 OF
& 792/2012
of 2013
2009
19 October 2012
31 March 2013
31 March 2010
FY15
New Slab
Domestic (Urban)
0 - 200
3.00/kWh
3.45/kWh
3.45/kWh
4.00/kWh
4.00/kWh
0-150
201 - 500
3.30/kWh
3.80/kWh
3.80/kWh
4.50/kWh
4.50/kWh
151-300
>500
3.30/kWh
3.80/kWh
3.80/kWh
5.00/kWh
5.00/kWh
301-500
5.50/kWh
>501
Non-Domestic
0 - 300
4.30/kWh
4.95/kWh
5.75/kWh
6.00/kWh
6.00/kWh
0-150
>300
4.30/kWh
4.95/kWh
6.00/kWh
6.50/kWh
6.50/kWh
151-300
6.80/kWh
301-1000
7.10/kWh
>1000
6.50/kWh
0-1000
6.80/kWh
>1000
6.80/kWh
0-1000
7.10/kWh
>1000
Public Institutions
All Units
4.00/kWh
4.60/kWh
6.20/kWh
6.50/kWh
Private Institutions
All Units
4.30/kWh
4.95/kWh
6.75/kWh
6.75/kWh
Page 14
Description
(FY 2014-15)
Domestic
8.00
Fixed Charge
0.75
1.00
1.11
1.11
4.55
6.64
6.72
7.02
6.00
Energy Charge
Regulatory
Surcharge
0.13
0.18
0.19
0.19
5.00
Electricity Duty
0.05
0.08
0.08
0.08
Effective Billing
Rate
5.48
7.90
8.09
8.40
/kWh
7.00
4.00
NonPublic
Domestic Institution
Private
Institution
3.00
2.00
Description
1.00
0.00
Domestic
Fixed Charge
Non-Domestic
Energy Charge
Without
Subsidy
With 15%
Subsidy
8.66
7.49
Accelerated Depreciation, if
availed
0.94
0.80
7.72
6.69
Regulatory Surcharge
Electricity Duty
Bi-Directional
Meter
Distribution
Transformer
DSO
TSO
Page 16
Solar
Meter
Step-Down
Transformer
Utility
Meter
DSO
TSO
Consumer Grid
Net Metering Agreement
between Consumer and DISCOM
Page 17
Net
Metering
Gross
Metering
Page 18
Content
Regulatory Aspects
Page 19
Regulatory Aspects
Understanding Connectivity of the Power Plant with the Grid Distribution System
Page 20
Content
Regulatory Aspects
Page 21
Delhi - Surplus Generation to be accounted as if it has occurred during off-peak time block
Orissa - Regulatory Commission has announced Order for implementation of projects under Net
Metering on Government and PSU Buildings only
Karnataka - Solar Rooftop PV systems connected to LT grid of a distribution company, the concept of
net metering shall be adopted and the net energy pumped into the grid shall be billed
Tamil Nadu - Net Metering Mechanism has been extended to LT (as recommended in policy) and HT
Consumers
Punjab - Government has announced Policy on Net Metering project size up to 1 MW;
Kerala - The quantum of electricity banked shall be settled first in the corresponding normal period and
the balance in the peak period and in the off peak period in succession in subsequent billing period.
Excess electricity generated by the solar energy system installed in one premises and to use such
excess electricity in other premises owned by the consumer is permitted within the area of supply
of the licensee
Madhya Pradesh Net Metering Regulations & Policy at public consultation stage
Page 22
Implemented by
Our profile
Page 23
Implemented by
Commissioning
Ministry
Partner Ministry
Focus sectors
Approach
Project team
Page 24
Implemented by
Kolkata Metro
Mumbai Metro
Hyderabad Metro
Bangalore Metro
Chennai Metro
Kochi Metro
Page 25
Implemented by
KSCA
Page 26
Implemented by
Factsheets
Brochure
Website
Page 27
Hemant Bhatnagar
Senior Advisor ComSolar
Indo German Energy Programme GIZ
+91 98711 94344 / +91 11 4949 5353 2173
hemant.bhatnagar@giz.de
www.comsolar.in
www.solarguidelines.in