Professional Documents
Culture Documents
MEEC 619 Quality Control and Reliability Engineering May Jun 2007
MEEC 619 Quality Control and Reliability Engineering May Jun 2007
B.E./8.Tech.DEGREEEXAMINATION,MAY/ruNE 2007.
Sixth Semester
(Regulation2A04)
Production Engineering
ME 1006- QUALITY CONTROL AND RELIABILITY ENGINEERING
(Commonto B.E. (Part-Time) Fifth SemesterRegulation 2005)
Time : Three hours
co
m
N.
va
2.
3.
;.
5.
6.
7.
Differentiate between mean time to failure and mean time between failures
based on their applicability.
8.
9.
10.
ww
w.
aa
na
1.
PARTB-(5x16=80marks)
11. (a)
(6)
(i)
(ii)
( 10)
values.
Or
N.
co
m
(b)
Sample Number
11 L2 13 L4 15 16 L7 18 19 20
345678910
va
L2
aa
na
5 . 1 5 . 0 5.1 4.8 4.9 5.0 5.0 4.7 4.9 5.0 4.9 5.0 5.0 5.1 4.9 4.5 5.0 5.2 5 . 0 5 . 2
5.0 4,8 4.9 5.2 4.9 5.0 5.1 4.9 4.8 5.2 5.0 5.1 4.9 4.8 4.9 4.8 5.1 5.1 5.1 5.1
5 . 0 4 . 9 5.1 5.0 5.0 5.1 4.4 5.2 5.2 5.0 5.3 5.0 4.8 4.8 4.9 5.0 5.1 5.0 5.0 4 . 6
w.
L2.
(a)
ww
5 . 3 5 . 0 5.1 4.9 5.0 5.1 5.2 4.8 4.8 5.0 5.1 5.3 4.8 4,9 5.0 4.9 4.8 5.3 4 , 9 5 . 1
The Stosh Motor Company, manufactures bolts for its model X-350
high-perfonnance racing engine. If defective, the bolts typically have
damaged threads or improper diameters. A defect can be easily
discoveredby threading the bolt into a block of steel with a hole of correct
threading and diameter. If a defective bolt is passed to the assembly line
there is a chance that the threads in the engine block hole will be
damaged or that bolt may work itself loose during operation of the
engine.The historical proportion defective average has been 0.015. Setup
a suitable control chart for this process.Assume that management wants
99.? percent of the normal variation to fall lrithin the control limits. The
sample size is 16. The numbers of defects found in the last five samples
(16)
were 1, L,2,2, and 3 respectively.Is there a need for concern?
Or
c 3291
(b)
(i)
(ii)
(a)
(i)
(ii)
co
m
13.
(8)
N.
(b)
aa
na
Or
va
w.
LTPD is 0.05. What are the producer's and consumer's risks for this
plan? Specify a plan that will decrease the producer's risk and the
ww
(i)
The reliability
following:R(t)=(1 -tlh)z
0<r<fo
wherefo isthemaximum
(ii)
maximum life.
(8)
(8)
Or
c 3291
(a)
Define maintainability
measure.
(ii)
(i)
(ii)
and mention
va
Or
paranneters to
(4)
(8)
(ii)
aa
na
(i)
tl
i
I
-4
ww
rl
w.
(b)
various
co
m
15.
(i)
N.
(b)
''tl,I t'' t
f ruLn|
lr)
\__---
C 329L