03 09 Saw Waterproofing Membranes Tunnel
03 09 Saw Waterproofing Membranes Tunnel
09 February 2009
Tunnel Waterproofing
Standards
Combination product
Membrane1 without
geotextile
Raw Material:
1
2
Membrane backed
with geotextile2
PVC-P
PVC-P/ PP
EN 1849-2
(DIN 16726-5.3, DIN 53352)
>= 2 mm
not relevant
>= 200%
>= 60%
>= 12 N/mm2
<= 20 N/mm
>= 50%
>= 80%
EN 495-5
fulfile
fulfile
<= 2 %
<= 3 %
no leakage
not relevant
SIA V 280-14
<= 10%
<= 10%
Micro-organism (6 month/29 C)
Change of weight
Pass
not relevant
according EN 12316-2
not relevant
>= 20 N/ 50 mm
Fire resistance
-Norm 3800-1
B1
B2
or
>= 1500N/50 mm
not relevant
or
>= 50%
>= 80%
or
not relevant
<= 2.0%
<= 10%
not relevant
<= 4 %
<= 10 %
fulfile
no leakage at 7 N/mm2
not relevant
not relevant
>= 750 mm
not relevant
not relevant
not relevant
1968
1983
2006
not relevant
<= 10%
not relevant
<= 6%
Sika Services AG
Corporate Business Unit Contractors
Speckstrasse 22
CH-8330 Pfffikon
Switzerland
Phone +41 58 436 23 64
Fax +41 58 436 23 77
www.sika.com
2006
<= 10%
<= 1%
Describtion
Sika at Work
The Technical Material Characteristics of Sikaplan WP 2160-21 Felt 500 for the Project Perschling:
Sika Products
Fixing discs (roundels) including a Hook & Loop tape are installed to
provide adequate support and a close fit over the entire shotcrete
surface. The waterproofing membrane backed with a 200 g/sqm
PP geotextile is laid inside the tunnel as a contra part to the Hook &
Loop system with sufficient slack to prevent overstressing during
concreting.
Sika Products
Waterproofing
1.8 Mio. sqm of Sikaplan 14.6 Neat Felt 200 (Neat System 216)
Waterproofing
The waterproofing system is installed by mechanised operation scaffolding on a shotcrete surface with a surface evenness of 10:1. To support
the optimal material characteristics (e.g. biaxial-elongation) to span
joints, cracks, fissures and gravel pockets, a loosely laid (spot fixed)
plastic sealing membrane is recommended.
Project Participants
Client: AlpTransit Gotthard AG
Project Management: AlpTransit Gotthard AG
Project Design + Site Management: Ingenieurgemeinschaft GotthardBasistunnel Sd
Contractor: Consortium TAT, Lead Contractor: Zschokke Locher AG
Membrane Applicator: Consortium IGS, Lead Contractor: Sika Bau AG
Zrich; Commercial Management: Tecton AG
Project Participants
Client: BB Infrastruktur Bau AG
Design: ILF (SMH)
Construction Company: Strabag AG
Membrane Applicator: STRABAG AG / Sub-Divison IP, Waterproofing
Department
Construction period: 2005 -2009
Installation period of the waterproofing: March/2007 - December/2008
Tunnel Waterproofing
Standards
Combination product
Membrane1 without
geotextile
Raw Material:
1
2
Membrane backed
with geotextile2
PVC-P
PVC-P/ PP
EN 1849-2
(DIN 16726-5.3, DIN 53352)
>= 2 mm
not relevant
>= 200%
>= 60%
>= 12 N/mm2
<= 20 N/mm
>= 50%
>= 80%
EN 495-5
fulfile
fulfile
<= 2 %
<= 3 %
no leakage
not relevant
SIA V 280-14
<= 10%
<= 10%
Micro-organism (6 month/29 C)
Change of weight
Pass
not relevant
according EN 12316-2
not relevant
>= 20 N/ 50 mm
Fire resistance
-Norm 3800-1
B1
B2
or
>= 1500N/50 mm
not relevant
or
>= 50%
>= 80%
or
not relevant
<= 2.0%
<= 10%
not relevant
<= 4 %
<= 10 %
fulfile
no leakage at 7 N/mm2
not relevant
not relevant
>= 750 mm
not relevant
not relevant
not relevant
1968
1983
2006
not relevant
<= 10%
not relevant
<= 6%
Sika Services AG
Corporate Business Unit Contractors
Speckstrasse 22
CH-8330 Pfffikon
Switzerland
Phone +41 58 436 23 64
Fax +41 58 436 23 77
www.sika.com
2006
<= 10%
<= 1%
Describtion
Sika at Work
The Technical Material Characteristics of Sikaplan WP 2160-21 Felt 500 for the Project Perschling: