Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

INTERVIEW FORM

Name

t k~ .

UA.,,yJ{

Post Applied For:


Date of Interview:

2.12.-

_1-

Previous Job at Super Cinema:

2-D I j

/ 2-0~

Do you have any relative employed


Relation:

Name:

Name

~o-rt?epartl11ent:

16.

Total Fxpcricnrc:

!J ~b""""

Qualification:

Period:

~'Ihe,"

Yes

Position:

Cell

umber:

No

<if?y1-.

~It&

at Super Cinema?

---------

Yes

Position:

Dept:
No

----

Depl:

Expected Salary:

Present Salary:
Trial:

Days

From

To

Initial Interview Comments:

----------------------------------------~~~:=;:~b
HR Manager Comments:

Concerned

Departmental

Trial Rating: or Required)

General Manager

.,

Head Comments:

Excellent ( A )

Comments:

V. Good (8+)

Good ( 8)

Average ( C)

Resume

FAROOQ SHAHBAZ
House 407, Block R3,
M.A Johar Town, Lahore.
E-mail: farooqhahbaz_l@hotmail.com
Cell #: +971 508994530
Cell #: +92 334 4298582
Ph: 042-35955474

CAREER OBJECTIVE
~

To perform at my level best in a challenging and active environment, where r can


prove myself as a dynamic part of that environment. My goal is a long term
association
with a strong and growing organization,
which appreciates
knowledge, dedication and hard work.

QUALIFICATION
B.Tech (Hons) Specialization in Electronics
Preston University of Pakistan
B.Tech (Pass) Specialization in Electronics
Preston University of Pakistan
D.A.E (Electronics)
Ahmad Hassan Polytechnic Institute, Lahore
Matriculation
Board of Intermediate & Secondary Education, Lahore

2010
2008
2005

1999

EXPERIENCE

Worked
from 3rd
Responsibilities

in PROLOGIX
DISTRIBUTIO
April2015 to continue.

DUBAI

as a ISP Technician

Using Fujikura 60r Fusion Arc Splicing Machines


Installing aNT (Optical Network Termination) and ATB in customer end.
Splicing optical fiber of ATB (Access Terminal Box).
Checking the power level through power meter.
Configuration 0[0 T in customer end from POP.
Using EXFO -250 OTDR A IRTUE OTDR
Configure wireless routers.
Patching and dressing of optical fiber in MDF and IDF.
Using visible fault locator VFL.

Worked in super cinema project of royal palm golf and country


cinema operator from July 2013 to continue.
Respol1si bilities
Checking operating and monitoring of DLP
Christie (solaria series) digital cinema projectors.
Adjust the focus of picture through lens.
Checking the digital sound quality on cinema
Equalizer processor.
Install DCP data into projector server.
Making the show in projector display and playing.
Using QSC audio amplifiers QSC surrounds speakers
And QSC speakers sub woofers.

club as a

Resume

Worked

in Satellite & Telecommunication


Management
as a Field
of (OSP outside plant) in Chad (Africa), Fiber Optical Project
from April 2010 to Feb 2011.
Responsibilities
Team Leading in different section of project.
Checking Quality work and right measurements.
Laying HDPE pipe and termination.
Splicing and testing optical fiber cable 24 F.
Fiber Optical Cable blowing.
Installation ODF (Optical Distribution Frame).
Using GPRS Meter in different location during work.
Supervisor

Worked in Coding Technologies as a Service Engineer from May 2009 to


March 2010.
Responsibilities
Service and Maintenance of Inkjet Machines in different clients
(Industries).
Installation and Services of Mattei Detector, DOD (Large Character
Printers), Hot Role Ink Coder.
Troubleshooting and problem in machines, Electrically, Mechanically.
Solve the problem in customer end with minimum down time.

Worked in World Call Telecom Limited as a Technician at HFC Hybrid


Fiber Coaxial Broad Band Network from April 2005 to May 2009.
Responsibilities
Providing Internet Services through Coaxial & Fiber Optical
Infrastructure.
All Services providing by NODES according to CMTS specification
using return path frequencies and signal level.
Installation and configuration of Customer Premises equipment.
Testing and troubleshooting of optical and coaxial cable.
Installation wisi fiber nodes.
Installation of Scientific Atlanta fiber optical transmitter.
Installation and troubleshooting of UPS system and power at NODES.
Splicing of Optical Fiber Cable.
Broadband Powering Techniques.
UPS and Batteries Installation.
Test Equipment Used at HFC Network
Using Acterna MTS 8000 OTDR
Using Optical Power Miter (GN) Nettest
Using Signal Level Miters
SDA 5000
CM 1000
COMPUTER SKILLS
Basic Computer Diploma
Internet Browsing
SKILLS

Good Communication
Fast Learner
Target Achiever

Resume
PERSONAL INFORMATION

Father's ame
Date of Birth
Religion
ationality
CNICNo.
Marital Status

Muhammad Shahbaz
2151 October 1982
Islam
Pakistani
35202-3425385-5
Married

REFERENCE
o

Will be furnished on demand.

You might also like