Professional Documents
Culture Documents
Resumen de Kirk Morey
Resumen de Kirk Morey
Actual
Educacin
University of Liverpool
UK Armed Forces
Contactos
500+ contactos
Nota: Distinction
A Masters Degree in Software Engineering, concentrating on Project Management and
Resource Management in the Software industry
UK Armed Forces
TEC, Instrumentation
1985 1988
o
o
o
Chartered Engineer
Institute of Measurement and Control
License M-21033
March 2013
Heading up the Instrument and Controls group for everyday works and for two
upcoming major projects, including a Gas Gathering and Treatment plant and a
complete ICSS refit project for the whole field.
Commissioning Manager
Siemens
Commissioning of a new build cement plant and power generation facility in Ogun
State, Nigeria
Commissioning Manager
Initec Energia
Privately Held; 201-500 employees; Petrleo y energa industry
Overseeing all Turbine and Steam Cycle commissioning activities for a new build
Thermal Solar facility, Manchasol 1+2, near Alcazar de San Juan, Ciudad Real, Spain
Commissioning Manager
Initec Energia
Site Manager
GE Oil and Gas
Public Company; 10,001+ employees; Petrleo y energa industry
My main duties for this project are to manage the day to day commissioning operations
of one of ten natural gas compression stations on the Reliance Energy "East/West"
pipeline, including personnel planning and all materials handling for site. Further duties
include assisting the commissioning team wherever necessary to commission the
various control systems included in the station. These systems consist of a Mark VI
turbine control system for the three "Nuovo Pignone PGT25 Turbine and 803/2
Compressor packages". Further systems are a GE Fanuc Duplex 90-70 PLC for the ESD,
F&G and process systems and a Versamax PLC for the hydraulic starter system. Four
such stations completed over the course of the project.
Site Manager
Honeywell Control Systems Ltd
My initial placement was in Honeywell's Bracknell, UK office to plan and set up the site
portion of the Shell Pearl GTL project, to be installed and commissioned in Ras Laffan
Industrial City, Qatar. Subsequent visits included FAT's and site visits to Qatar and New
House, Scotland and eventual mobilization to the project in Qatar. My positions main
emphasis at site is to manage all aspects of the Honeywell project, including the
installation, pre-commissioning and commissioning of both the Honeywell Experion DCS
and Safety Manager IPS systems, in conjunction with the associated Experion,
Foundation Fieldbus and HART managed networks. Other responsibilities include all
planning works and procedure writing to successfully execute the project and materials
handling/load out/construction.
Commissioning Engineer
GE-PPSD Power Generation
The commissioning of a BOP (balance of plant) ICS Mark VI system for a 340MW
combined cycle power station in Aceca, Spain for Union Fenosa corporation. My duties
for this project were as a technical consultant to Union Fenosa along with the general
commissioning of the control system. The main ICS equipment was the GE Mark VI
running "Control Systems Toolbox version 11" with a Cimplicity 5.5 graphics package.
Peripheral equipment included Siemens PLC's, PI historian
Site Manager
Sirio Sistemi Elettronici
The Commissioning of four Nuovo Pignone steam turbines and four reciprocating
compressors for an ammonia plant in Jilin, Northern China (PetroChina as final client).
All systems utilising GE Fanuc 90-30 PLC's running LM90 programming package and
Cimplicity HMI/MMI. All units interfaced to HEMA ESD system and Yokogawa DCS. My
main emphasis for this project was as site co-coordinator and software engineer,
designing and implementing all PLC and HMI modifications, commissioning of all
controls and associated instrumentation, vendor representative controlling all aspects
of the I/C portion of the project and liaising with the client (Linde Impianti
Commissioning Engineer
GE
Public Company; 10,001+ employees; GE; Manufactura elctrica/electrnica industry
The Commissioning of four GEC Alstom Tornado gas turbines for power generation
(4.15 MW) on the AKAL Bravo complex offshore Mexico (final client PEMEX). All systems
utilising Allen Bradley PLC's running RSLogix with Intouch 7.0 HMI. All units interfaced
to FSI Fire & Gas system, Triconex ESD and TDC3000 DCS. Also utilized Bentely Nevada
Vibration and Speed monitoring system, and Woodward power monitoring and control.
The Commissioning of three LM2500 gas turbines on the Resak platform gas
compression upgrade, offshore Malaysia (final client Petronas). My main duties were
site management of local labour for all electrical and instrumentation systems
associated with the turbines, along with all instrumentation for the associated Elliot
compressors. All systems controlled by Woodward TCP, with Intellution HMI and
Micronet NT based PC running GAP control software. Main platform control by TDC3000
DCS which all units were interfaced to. Auxiliary systems included Bentley Nevada
3500 vibration and speed control.
Site Manager
Silvertech Systems, Europe
Spanish
DCS
2.
PLC
3.
Instrumentation
4.
Electronics
5.
Microsoft Office
6.
Network Engineering
7.
Software Engineering
8.
Commissioning
9.
10.
commissioning management
11.
Project Planning
12.
SCADA
13.
Project Management
14.
Commissioning Management
15.
Petrochemical
16.
Gas Turbines
17.
Power Plants
18.
Turbines
19.
Steam Turbines
20.
Engineering
Ver todas las aptitudes (44)
Automation Engineers
AutomationEngineerSCADA_PLC
Drilling People
Energy Recruitment
Expat Network
Expat Web
Industry Jobs
Petrogate Jobs
Regalgreen
o
o
University of Liverpool
January 1, 2012
Authors: Kirk Morey
A Method of designing control systems in the same manner that we design industrial
software, using predetermined templates in a 'Drag & Drop' scenario, using
inexpensive off the shelf software.
oportunidades profesionales
ofertas de consultora
preguntas de empleo
peticiones de referencias
retomar el contacto