Professional Documents
Culture Documents
Boiler Note 1
Boiler Note 1
Chapter 8
During a bottom
blowdown, the boiler
should be under
light load and the
water level should
be at the NOWL.
A broken or discolored
gauge glass is replaced
using standard
procedures for maximum
safety.
Feedwater pumps
should be checked
periodically to ensure
proper bearing
temperatures and
checked for any
unusual vibration.
When inspecting a
boiler, inspect tube
sheets, tubes, and
other internal parts for
corrosion, overheating,
and/or other damage.
Troubleshooting steps
from the manufacturer
provide a guide to
correcting a boiler
operation problem.