Professional Documents
Culture Documents
Sui Northern Gas Pipelines Limited: Ha Claim Form (Executives)
Sui Northern Gas Pipelines Limited: Ha Claim Form (Executives)
EMPNO:
523897
NAME:
DEPARTURE
DESIGNATION:
ARRIVAL
DURATION OF TOUR
S.No
STATION
DATE
Faisalabad(T)
05-10-15
Multan A7
06-10-15
TIME
HOURS MINUTES
PASSAGE ARRANGED BY
SELF
AIR*
FARE
ACCOMMODATION ARRANGED BY
COMPANY
TRAIN FARE FARE** BY
ROAD
STATION
DATE
TIME
0700
Multan A7
05-10-15
1200
520 (DAEWOO)
1900
Faisalabad(T)
06-10-15
2130
520 (DAEWOO)
P l e a s e
Rs
08-10-2015
DEPARTMENT:
SELF
SELF
t i c k
1040 Rs.
MESS
a p p r o p r i a t
780
DATE
SIGNATURE
CLAIMANT
VERIFIED BY
HEAD OF DEPTT
CHECKED BY
LOG, SPT / ADMIN DEPTT
12-18 Hrs
(60%)
TO BE USED BY ACCOUN
S . No.
18-24 Hrs
(100%)
M FORM (EXECUTIVES)
Telecom
ACCOMMODATION ARRANGED BY
COMPANY
FSD-T
LOCATION:
INCIDENTAL /
JOB NO:
PURPOSE OF
CONVEYANCE
HA DAYS / AMOUNT
CHARGES (IF
HOTEL
ANY)
JOURNEY
Rs.
Permanent
Rs.
TOUR
780
HA Days
Rs.
P l e a s e
t i c k
Rs.
a p p r o p r i a t e
780
Rs.
b o x e s
Rs.
Rs.
SANCTIONED BY
for MANAGING DIRECTOR
TO BE USED BY ACCOUNTS DEPARTMENT ONLY
ACCOUNTANT
INCIDENTAL EXPENSES
S.No
DETAIL
PURPOSE OF JOURNEY
AMOUNT
FSD(T)--------------- DAEWOOFSD
60
180
480
60
780
ENTITLEMENT / HA RATES:
Grades
Hotel
entitlement
upper limit
Halting
Halting Allowance if
Allowance if
staying at own
staying in hotel
arrangement
Mode of Travel
Grade I-VII: Sleeper ACC by Rail / Economy
I-VI
Rs. 800/-
lodging &
meals etc
Grades
1.
2.
Class by Air
Grade VIII-IX: Sleeper ACC by Rail / Club
Boarding
VII-IX
I-III
Rs. 650/-
IV-VI
Rs. 900/-
Rs. 1200/-
PURPOSE OF JOURNEY
g verifications
INSTRUCTIONS
1.
2.
A claim must be submitted with in two weeks of the completion of the tour.
Time should be expressed in hours and minutes i.e. 9 am. = 0900 hours and 1 pm = 1300 hours.
**