Indonesia Wind Map
Indonesia Wind Map
Indonesia Wind Map
DEVELOPMENT IN INDONESIA
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
Outline:
Introduction
Regulation and Policy
History on Wind Energy R & D
Wind Energy Resource Assessment Status
Wind Turbine Technology Status
Implementation
Conclusion
2
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
Introduction
3
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
4
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
RE POLICY DIRECTION
National Energy Mix 2025
(according to Perpres 5/2006)
Bio fuel 5 %
Coal 33 %
RE 17 %
Gas 30 %
Oil
20 %
Geo thermal 5 %
Biomasa, Nuclear,
hydro, Solar,
Wind 5 %
Liquid coal 2 %
5
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
DARIUS
SAVONIUS
MULTI BLADE
5kW
1979-1990
TAMAN ENERGI
ANGIN DI ITB
1990
1995
2000
2005
SKEA LPN-50 kW
Design LPN 300 kW
2010
SKEA 5 kW Cipularang
SKEA 2,5 kW Pontianak
6
2nd D-8 Working Committee on Renewable Energy, Denpasar - Bali November 16-17, 2011
SKEA
SKEA
SKEA
SKEA
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
(50 meter)
Number
of sites
Provinces
Marginal
3,0 4,0
< 75
84
Maluku,
Papua,
Sumba,
Mentawai, Bengkulu, Jambi,
East and West Nusa Tenggara,
South and North Sulawesi
North Sumatera, Central Java,
Maluku,
DIY,
Lampung,
Kalimantan
Fair
4,0 5,0
75 - 150
34
good
> 5,0
> 150
35
9
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
10
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
11
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
Site
Sidrap
UPT Punaga-Laikang-Takalar
SBSPJLAPAN, Parepare
Desa Bungaiya Kec. Bontomatene Selayar
Appatanah Selayar
Dongin, kec. Bantul Banggai
Tinobu, Lasolo Kendari
Kaimbulawa, Buton
Gerak Makmur, Kec. Sampalawa, Kab. Buton
Sampuabalo, Lasa Limu Buton
Poliwai Mandar
Bulungkobit, Tinangkung, Kab. Banggai
Abason, Tatikum Banggai
Sandana Bolaan Uki Bolaan Mangondow
Desa Libas, Kec. Likupang, Kab Minahasa
Desa Paudean, Kec. Bitung Selatan, Kab.Bitung
Kaluwatu, Manganitu Selatan Sangihe Talaud
Malamenggu Sangihe Talaud
Kalasuge, Tabukan Utara, Kab. Sangihe Talaud
Selayar
Kota Palu
Talaud
Parigi
Province
Sulsel
Sulsel
Sulsel
Sulsel
Sulsel
Sulteng
Sultra
Sultra
Sultra
Sultra
Sulbar
Sulteng
Sulteng
Sulut
Sulut
Sulut
Sulut
Sulut
Sulut
Sulsel
Sulteng
Sulut
Sulteng
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
30m
6.19
4.14
5.97
5.44
7.25
3.10
2.18
4.59
3.10
3.11
3.40
3.56
4.02
2.07
3.33
2.99
2.30
5.17
3.45
6.51
3.00
2.93
3.88
50m
6.47
4.58
6.62
6.02
7.92
3.44
2.42
5.09
3.44
3.45
3.92
3.94
4.45
2.29
3.69
3.31
2.54
5.73
3.82
6.77
3.32
3.41
4.30
12
13
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
WECS Prototipes
50 kW
14
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
15
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
15
Source: Vestas
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
Implementation Status
Technology :
Implementation :
Indonesia ~ 2 MW
17
18
19
WIND TURBINES
IMPLEMENTATION
A number of pilot projects have been developed at several locations, these
are:
Hybrid system Wind - PV and Diesel at Rote Ndao East Nusa Tenggara,
with 4 unit of 10 kW wind turbine and 36 kWp PV.
Note :
Hybrid Wtg+PV at Lombok Island used for battery Charging for house lighting
Hybrid wtg+PV+diesel at Rote Ndao used for isolated utility grid
Hybrid Wtg_diesel at Madura used for battery charging for public lighting and
houses.
21
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
22
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
23
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
24
25
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
26
26
27
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
The Challenge
The contribution of wind energy in Indonesia has to be gained, i.e, by
means of :
a) More assessment and identification of wind potential at various area
in Indonesia supported by accurate and reliable wind data base.This
has to be done nationally with the targets to produce the
representative wind map of Indonesia
b) The comprehensive Indonesia wind mapping is not developed yet,
so this is once of challenge for build that.
c) Local fabrication of certain type of WECS using proper technology
have to performed for reducing the cost and increasing market
achievement
d) Large WECS implementation have to be initiated in order to realize
the contribution of wind energy according to BEPN/Road Map 2025 .
WECS products of the size of 300kW 1 MW and are available for
implementation.
e) Local governments have the important roles for wind applications;
more supports are expected in order to accelerate the achievement
28
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
THE PROSPECT
For the wind potential sites and the remote /small island and small
demand, the configuration with stand alone systems are suitable for,
with using small size wind turbine on many area / islands.
29
CONCLUSION
Several sites have been identified and some of them have prospect to
implemented of wind energy technology especially at good/ excellent
wind potential.
Required pilot project with the correct phases from planning through to
OM and management systems.
30
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012
31
The 2nd Clean Power Asia, Denpasar - Bali May 14-15, 2012