Pre Qualification Submittal Leminar

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

NEW PORT PROJECT

Construction Development Co. LLC


Boom Construction Co. LLC (JV)
NPP/0047: Centralised Customs
Inspection Area

Contract:
PQ Ref:
Activity
No.:

Pre-Qualification
Submittal
(PQ Form)

NPP/0047 Centralised Customs Inspection Area


NPP0047-CDC-ACM-PQ New
0000x_rev
Submittal
ReSubmittal

Manufacturer /
Supplier name:
Address:
Trade License No.:
Commercial
License No.:

Mueller Industries Inc (Wedensbury &


Pegler Yorkshire) / Leminar Air
Conditioning Co .W.L.L
Al Emadi Business Center Building, 3rd
Floor, office No 47, C ring road.
43941
25933

Date on
ePM:

Country
of
office:
Phone
No.:
Fax No.:
PO Box:

Qatar
+974 44673755
+974 44663076
3841

Description Supply of Copper Pipes and Fittings


of
services:
Specialisat Plumbing System / Mechanical
ion /
Discipline:
Location of NPP/0047 CCIA Project All Areas
use on
project:
Estimated start
Estimated completion
date:
date:
Attachments to support the Pre-Qualification submittal:
1
Company Profile
Remar Please refer
ks:
2
List of Proposed Products
Remar Please refer
ks:
3
Commercial Registrations
Remar Please refer
ks:
4
Confirmation Letter
Remar Please refer
ks:
5
List of company owned & hired
Remar Please refer
machinery and equipment
ks:
6
Company Organizational Chart
Remar Please refer
ks:
7
List of Manpower
Remar Please refer
ks:
8
ISO certificates
Remar Please refer
ks:
9
List of Performed Projects
Remar Please refer
ks:
10 Prime Contact Information
Remar Please refer
ks:
11 Sample Country of Origin
Remar Please refer
ks:
12 Letter from manufacturer
Remar Please refer
ks:
13 Previous material submittal approvals
Remar Please refer
ks:

to pages 01 19
to pages 20 77
to pages 78 82
to pages 83 84
to pages 85 86
to pages 87 88
to pages 89 90
to pages 91 96
to pages 97 99
to pages 100 101
to pages 102 104
to pages 105 108
to pages 109 114

Disclaimer
We understand that approval of the company submitted herein is only intended to determine
general conformance with the intent of the project contract documents. By submitting this
company for approval, we confirm we have performed all necessary pre-reviews to ensure that the
presented company is compliant with local regulatory and statutory requirements to operate
NPP00100-AMC-PRO-1201-PQ
Revision 0 24 March 2014

Page 1 of 2

NEW PORT PROJECT


Construction Development Co. LLC
Boom Construction Co. LLC (JV)
NPP/0047: Centralised Customs
Inspection Area

Pre-Qualification
Submittal
(PQ Form)

within the State of Qatar. The approval of this company will not relieve the Contractor from the
responsibility for conformity to specification, standards and contractual obligations.
Prepare
d by:

Marvin
Arinuel
o
Sr.
QA/QC
Engine
er

Signatu
re:
Date:

Checke
d by:

Amjad
Rawashd
eh
MEP
Project
Manager

Signatu
re:
17-022016

Date:

Review
ed by:

Glisson
George
QA/QC
Manage
r

Signatu
re:
17-022016

Date:

Approve
d by:

Shadi
Khashab
Project
Director

Signatu
re:
17-022016

Date:

17-022016

PMC review comments


Review
Status A
Status B
Status C
(reviewed)
(reviewed as noted)
(revise and resubmit)
status:
(insert CSRC reference that refers to the details of the review outcome)

Reviewed
by:

(insert full name)

Date
returned
to
Contractor
:

NPP00100-AMC-PRO-1201-PQ
Revision 0 24 March 2014

Signat
ure:

Compan
y stamp

Status D
(cancelled)

Dat
e:

Copies
distributed to:

Page 2 of 2

You might also like