10massinissalalamsagemcominterferencemanagement 130408012719 Phpapp02

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 44

BeFEMTO Winter School

6-10 February 2012

Interference Management in CoChannel Femtocell Deployment


Massinissa Lalam
08-02-2012

Outline
Femtocell Deployment Overview
3GPP status on Interference Management
System-Level Simulation Framework
Evaluation of Power Control
Evaluation of Frequency Partitioning Schemes
Conclusions

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

Femtocell Deployment Overview

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

Coexistence Scenario
Femtocells are small base stations usually deployed within the macrocell
network
Mobile operator has no control over the deployment location

MUE1

femtocell
macro base station

FUE

MUE2

Femtocells have 3 access policies


Closed (only femto users can connect)
Open (all users)
Hybrid (all users + priority to femto users)

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

Worst-case
Co-channel deployment
Same carrier
Downlink + Closed access
Non authorised user in the vicinity of the femtocell may experience severe
interference coming from the femtocell
FUE2

femtocell1

MUE3
macro base station
MUE1
MUE2

FUE1

Thus, the need of Interference Management solutions

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

3GPP status on Interference Management

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

S1

Architecture (Rel.10)

S1

S1

X2

S1

X2

3GPP Rel.10

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

Rel.8/9 - Inter-Cell Interference Coordination (ICIC) (1/2)


Frequency domain solution

Data channel protection


Indicators exchange through X2

macro / pico
Uplink interference management

Overload Indicator (OI)


eNB reports the level of interference
received
Low, Medium, High

Reactive process

High Interference Indicator (HII)


eNB sends 1 bit per resource block
(RB)
Indicate Cell-edge user on this resource
Informed neighbours will avoid these RB at cell-edge

Proactive process

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

Rel.8/9 - Inter-Cell Interference Coordination (ICIC) (2/2)


Downlink interference management

Relative Narrowband Transmit Power


(RNTP) Indicator
eNB advertises Tx power per RB
Proactive process

Enables (dynamic) frequency partitioning

Hard Frequency Reuse


BeFEMTO Winter School |

Fractional Frequency Reuse (FFR)

Soft-Frequency Reuse (SFR)

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

Rel.10 - enhanced ICIC (eICIC) (1/4)


Specifically targets Heterogeneous Networks (HetNet)
Small Cells
Time domain solution
Control channel protection
Information exchange through X2
macro/pico
or OAM configuration (TR-069)
macro/pico/femto
Focus only on Non-Carrier Aggregation (CA) scenarios

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

10

Rel.10 - enhanced ICIC (eICIC) (2/4)


Downlink power control
Targets femtocell
Power is adjusted based on surrounding
Measurements performed by the femtocell
DL & UL

Need of one Network Listen Module (NLM)


Not specified
But always required by Operators

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

11

Rel.10 - enhanced ICIC (eICIC) (3/4)


Almost Blank Subframe (ABS)
During defined subframes, the Aggressor cell does not transmit its (control +
data) channels to protect a Victim cell
ABS pattern transmitted via X2 (dynamic) for macro/pico
Macro/Pico Aggressor/Victim

normal

ABS

F e m to

F e m to

M a c ro

M acro

or via OAM (semi-static) for macro/femto


Macro/Femto Victim/Aggressor

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

12

Rel.10 - enhanced ICIC (eICIC) (4/4)


Cell Range Extension (CRE)
Through broadcasted information (handover/camp bias) UEs stay connected
to picocells (hotspot)
Bias leads to low SINR

Requires advanced UE receiver to cope with low SINR


Interference cancellation

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

13

Rel.11 - ICIC still in discussion (1/2)


further enhanced ICIC (feICIC) for non-CA based deployment
Some proposals under discussion:
At the transmitter side in DL
Combination of ABS + power reduction

At the receiver side in DL


Use of advanced UE receiver (cancellation/discard of known signals such as CRS )

ICIC for CA based deployment


In CA deployment, several cells/ component carriers (CCs) are aggregated
Up to 5 CCs (100MHz maximum bandwidth)
Cross scheduling among the CCs is possible

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

14

Rel.11 - ICIC still in discussion (2/2)


ICIC for CA based deployment
For each Rel.10+ UE,
One Primary Cell (PCell) is assigned among the pool of cells
Carrying control/data information

The rest of the cells are seen as Secondary Cells (SCells)


Carrying data

PCell/SCell selection is under discussion


Macro UE A
Control signaling on f 1 and/or f 2
Data on f 1 and/or f 2

Macro UE B
Control signaling on f 1
Data on f 1 and/or f 2

Pico UE
Control signaling on f 2
Data on f 1 and/or f 2

Pico

Macro

BeFEMTO Winter School |

f1

f1

f2

f2

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

15

System-Level Simulation Framework

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

16

System-Level Simulation (SLS)


SLS allows large scale network representation

Several (macrocell) base stations


Up to a hundred of users attached per base station
SLS aims at evaluating the system performance in this large-scale configuration

Radio resource management algorithms


Interference mitigations techniques
Coverage estimation
Various statistics are gathered for this purpose

Throughput
Fairness
Outage
Cell activity
Realistic traffic statistics
Frame/Packet error rates
Frame/Packet acknowledgement time

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

17

Evaluation Methodology (3GPP/3GPP2/IEEE802.16m)


Monte-Carlo Approach
Link

System
Static

Network construction
Mobile deployment
Physical Layer
Abstraction

Computation of long-term parameters


(pathloss, antenna gains, shadowing)
Dynamic

Look-Up Table

SINR

Computation of short-term parameters


(fast-fading)

(BLER vs SINR)
Scheduling, HARQ,

Throughput, Coverage,
BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

18

Macrocell Layout
2D hexagonal layout, each site has 3 sectors (cells)
1 Central site
1st tier: 6 Sites
2nd tier: 12 Sites

Wrap-Around
Copy of the main cluster to
combat the edge effect
BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

19

Long Term Parameters (1/3)

Let P be a point in the 2D plan

Pathloss from a macrocell base station


@ 2GHz, R distance from a site in meters

PL( R ) = 15.3 + 37.6 log10 R + [Wall attenuation ] in dB

, Gf2b in dB
GBS ( ) = G0 min 12
3dB

Point

GUE = G1 = 0dB

15

10

Antenna gain (dB)

Antenna gain
Cell

-5

-10 -150

BeFEMTO Winter School |

-100

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

-50

0
50
Direction (deg)

100

150

20

Long Term Parameters (2/3)


Shadowing
Random variable representing the obstacles between one cell and one point
in the 2D plan
Correlation

SF ~

2
) in dB
N (0, SF

1 between intra-site cells


0.5 between inter-site cells

Power received by the point P from a base station (BS) in dB

PRx ( BS ) = PTx ( BS ) + GBS ( ) +GUE -PL( R )-SF


Signal to Interference-plus-Noise Ratio (Geometrical Factor)

G - factor =

PRx ( BSserv )

PRx ( BSitrf ) + Ptherm


interferers
BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

21

Long Term Parameters (3/3)


G-factor can be evaluated every where in the 2D plan

without shadowing, without wrap-around

BeFEMTO Winter School |

with shadowing, with wrap-around

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

22

Users Drop
Users are uniformly dropped over the 2D plan
Attachment to the best macrocell
Run 0 - Mobile drop: v=indoor, o=outdoor
3000

25

2000
46

1000

28

27

meters

29

49

47
10

48
50

-1000

31

13

12

52

14

43

44

16

33

40
18

20
55

21
23

19

17

22

15

34

42

51
53

-2000

26
7

11

30
32

45

24

39
41

37
54

36
38

56

35

-3000
-3000
BeFEMTO Winter School |

-2000

-1000

0
meters

1000

2000

3000

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

23

Femtocell Urban Model (1/2)


Dual-Stripes [3GPP TR.36.814]
2 stripes of 20 blocks, up to 6 floors
Pathloss (dB, distance d in meter)

Pathloss(dB) = PL (dB) + 0.7 d 2 D ,indoor

+ pAint + qAext

n+2
0.46
n
+
1
+ 18.3n

Within the same stripe

PL (dB) = 38.46 + 20 log10 R


Otherwise

PL (dB) = max{ 38.46 + 20 log10 R , 15.3 + 37.6 log10 R }

Shadowing
4dB of standard deviation
No shadowing if d < 1m

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

24

Femtocell Urban Model (2/2)


5x5 Grid [3GPP TR.36.814]
25 blocks
Pathloss (dB, distance d in meter)
No wall modelling

Pathloss(dB) = 37 + 30 log10 ( d )
Shadowing (dB)
10dB of standard deviation
No shadowing if d < 1m

Aggressive femto-to-femto interference scenario

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

25

Femtocell & Users Drop


Femtocell deployment
Deployment probability inside a block
Random position inside one block

Users are dropped per deployed femtocell


Random position inside the same block
Minimum femto-user distance = 20cm

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

26

Link to System

With fast fading, SINR is computed on each subcarriers


One SINR is derived using compression (MIESM, EESM)
From this SINR
Look-Up Tables (BLER vs SINR)

Enables realistic traffic modelling


HARQ

Truncated Shannon Bound

Gives spectral efficiency

min( max , log 2 (1 + SINR) SINRt > SINRmin

0
SINR

SINR
t
min

t =

max = 4.4

SINR min ( dB ) = 10

BeFEMTO Winter School |

= 0. 6

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

27

Evaluation of Power Control

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

28

System simulation assumptions


Parameter

Value

Parameter

Value

Total bandwidth

10MHz

Number of 5x5 grids

21

Carrier frequency

2GHz

Deployment ratio

15%

Thermal noise density

-174dBm/Hz

Number of UEs per femto

Max FBS power

10dBm

Min FBS power

-10dBm

Inter-site distance

500m

Number of sites

External wall attenuation

20dB

Number of sectors per site

Shadowing std deviation

10dB

Number of UEs per sector

50

Shadowing correlation

Inside 5x5 grid ratio

35%

Shadowing autocorrelation

3m

MBS power

46dBm

Shadowing std deviation

8dB

Shadowing correlation
between sectors

1 if same site

Shadowing autocorrelation

50m

BeFEMTO Winter School |

0.5 otherwise

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

29

Static Evaluation - 5x5 Grid (1/2)


Independent CSG per femtocell
1

Cumulative Distribution Function (cdf)

0.9
0.8

No PC - Macro - Avg=-0.29952, 5-perc=-22.1293


No PC - Femto - Avg=9.0862, 5-perc=-11.4683
PC( =1,Lf=60) - Macro - Avg=2.0814, 5-perc=-9.7065
PC( =1,Lf=60) - Femto - Avg=7.8147, 5-perc=-5.1789

0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
-50

-40

-30

-20

-10

10

20

30

40

50

GFactor (dB)
BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

30

Static Evaluation - 5x5 Grid (2/2)


Outage
One user is in outage if its G-factor is below -6dB
Independent CSG
UE in outage (-6dB)

No PC

PC

MUE

20.66%

8.99%

FUE

10.80%

4.18%

Average Tx power dBm

No PC

PC

FBS

10

-1.1885

UE in outage (-6dB)

No PC

PC

MUE

19.76%

7.57%

FUE

0.001%

0.06%

Average Tx power dBm

No PC

PC

FBS

10

-1.1885

Common CSG

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

31

System simulation assumptions (2)


Parameter

Value

Parameter

Value

Total bandwidth

10MHz

Number of dual-stripes

21

Carrier frequency

2GHz

Deployment ratio

15%

Thermal noise density

-174dBm/Hz

Number of UEs per femto

Max FBS power

10dBm

Min FBS power

-10dBm

External wall attenuation

20dB

Internal wall attenuation

5dB

Shadowing std deviation

4dB

Shadowing correlation

Shadowing autocorrelation

3m

Inter-site distance

500m

Number of sites

Number of sectors per site

Number of UEs per sector

50

Inside dual-stripes ratio

35%

MBS power

46dBm

Shadowing std deviation

8dB

Shadowing correlation
between sectors

1 if same site

Shadowing autocorrelation

50m

BeFEMTO Winter School |

0.5 otherwise

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

32

Static Evaluation - Dual-Stripes


Independent CSG
UE in outage (-6dB)

No PC

PC

MUE

10.72%

3.05%

FUE

1.32%

0.58%

Average Tx power dBm

No PC

PC

FBS

10

-1.3233

UE in outage (-6dB)

No PC

PC

MUE

10.36%

2.12%

FUE

0.002%

0.02%

Average Tx power dBm

No PC

PC

FBS

10

-1.3233

Common CSG

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

33

Evaluation of Frequency Partitioning Schemes

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

34

Fractional Frequency Reuse (FFR)


Cell space is divided in two:

Inner Region
Outer Region (edge users)
Edge users are given orthogonal subbands

SINR significantly increased


Bandwidth not fully used within one cell
Inner
Region

Tx power

Outer
Region

W0

W1

W2

W3

W0
W1
W0
W3

W0

W=
W0+W1+W2+W3

W2

Frequency
BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

35

Soft Frequency Reuse (SFR)


Cell space is divided in two:

Inner Region
Outer Region (edge users)
Edge users are given more power

SINR increased
Bandwidth fully used within one cell
Inner
Region
Outer
Region

Tx power

W0

W1

W2

W1+W2
W0
W0+W1
W2

W2+W0

W=
W0+W1+W2

W1

Frequency
BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

36

Resource Allocation in LTE Rel.8/9

Resource block group (RBG)


1RBG = set of contiguous RBs

Subband (SB)
1SB = set of contiguous RBGs
Usually 1SB = 2 RBGs

Bandwidth part (BP)


1BP = set of contiguous SBs

Example @10MHz in DL

BW = 3BPs = 9SBs = 17RBGs =


50RBs = 600 subcarriers
Allocation Type 0 allows one user to have
any set of RBGs
However, users reporting has a subband
granularity
BeFEMTO Winter School |

Bandwidth part 0

1RB = 12 subcarriers

Bandwidth part 1

Resource block (RB)

Subband

Bandwidth part 2

In LTE, the total bandwidth (BW) is divided


in many parts of increasing size

RBG

RB

#0

#0 #1 #2

#1

#3 #4 #5

#2

#6 #7 #8

#3

#9 #10 #11

#4

#12 #13 #24

#5

#15 #16 #17

#6

#18 #19 #20

#7

#21 #22 #23

#8

#24 #25 #26

#9

#27 #28 #29

#10

#30 #31 #32

#11

#33 #34 #35

#12

#36 #37 #38

#13

#39 #40 #41

#14

#42 #43 #44

#15

#45 #46 #47

#16

#48 #49

Subband #0

Subband #1

Subband #2

Subband #0

Subband #1

Subband #2

Subband #0

Subband #1

Subband #2

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

37

Example of FFR/SFR in LTE Rel.8/9


FFR: 2 subbands per outer region

SFR : 2 subbands per outer region

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

38

Macrocell Only
Comparison between FFR, SFR and Reuse 1 (IFR)

FFR scheme improves significantly the SINR


May be a good candidate for macrocell partitioning
BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

39

System simulation assumptions


Parameter

Value

Parameter

Value

Total bandwidth

10MHz

Number of dual-stripes

Carrier frequency

2GHz

Deployment ratio

10%

Thermal noise density

-174dBm/Hz

Number of UEs per femto

FBS power

20dBm

External wall attenuation

20dB

Internal wall attenuation

5dB

Shadowing std deviation

4dB

Shadowing correlation

Shadowing autocorrelation

3m

Number of subbands used


for data

Inter-site distance

500m

Number of sites

Number of sectors per site

Number of UEs per sector

MBS power

46dBm

Shadowing std deviation

8dB

Shadowing correlation
between sectors

1 if same site

Shadowing autocorrelation

50m

Number of subbands for the


outer region

BeFEMTO Winter School |

0.5 otherwise

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

40

Dynamic Evaluation - MIMO


Cell throughput
1
0.9
Cumulative Distribution Function (cdf)

0.8
0.7
0.6
0.5
0.4
0.3
Macro
Femto
Macro
Femto
Macro
Femto

0.2
0.1
0
0

BeFEMTO Winter School |

10

20

1x1 - Avg=14.2392, 5-perc=9.1579


1x1 - Avg=8.7766, 5-perc=5.3088
2x2 - Avg=22.2534, 5-perc=14.3447
2x2 - Avg=16.2933, 5-perc=8.4446
4x4 - Avg=39.1508, 5-perc=25.4384
4x4 - Avg=30.5246, 5-perc=13.6049

30
40
Cell Throughput (Mbits/s)

50

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

60

70
41

Dynamic Evaluation - MIMO


Mobile throughput
1

Cumulative Distribution Function (cdf)

0.9
0.8
0.7
0.6
0.5
0.4
0.3
Macro
Femto
Macro
Femto
Macro
Femto

0.2
0.1
0
0

BeFEMTO Winter School |

10

1x1 - Avg=2.0342, 5-perc=0


1x1 - Avg=8.7766, 5-perc=5.3088
2x2 - Avg=3.1791, 5-perc=0
2x2 - Avg=16.2933, 5-perc=8.4446
4x4 - Avg=5.593, 5-perc=0
4x4 - Avg=30.5246, 5-perc=13.6049

20
30
40
Mobile Throughput (Mbits/s)

50

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

60
42

Conclusions

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

43

Conclusions
Spectrum being a scarce resource, frequency reuse is of major interest
Under such co-channel deployment, interference management is a crucial factor
for Heterogeneous Network success
For LTE / LTE-A, control and data channels need to be protected
Due to their positioning within one subframe, different schemes have been
developed (time/frequency domain)
Use of system-level simulations allows a large scale performance evaluation of
interference management (for data & control channels)

BeFEMTO Winter School |

SCET/URD1/Femtocell | Interference Management in Co-Channel Femtocell Deployment | Sagemcom

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

44

You might also like