6A HP Heater 8B Normal Drain 138.0: Description Test Package No. Test Pressure (Bar)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 24

Test

Package
No.

Description

Test Pressure
(bar)

Feed Water Pump discharge piping up to


FRS

732.0

Feed Water piping from FRS to economizer


inlet

529.5

3
4
5
6A

HP Bypass warm-up piping


Reheater spray piping
Feed water pump recirculation piping
HP Heater 8B normal drain

399.4
322.5
150.0
138.0

6B

HP Heater 8B emergency drain

138.0

7A

HP Heater 8A normal drain

138.0

7B

HP Heater 8A emergency drain

138.0

8
8A
8B
9A
9B
10A
10B

HPT extraction steam supply piping to HP


heater 8A & 8B
H2 supply to pressure reducing station
CO2 Supply to CO2 expansion device
HP Heater 7B normal drain
HP Heater 7B emergency drain
HP Heater 7A normal drain
HP Heater 7A emergency drain

135.0
100.0
100.0
108.0
108.0
108.0
108.0

11

CRH steam supply piping to HP Heater 7A&


7B, ST gland seal, BFPT turbine, deaerator
pegging, Heater 7B drip piping

12

LP Bypass warm-up piping

98.6

13

Main Condensate piping up LP Heater 4

69.0

H2 supply to Generator
Turbine driven boiler feed pump
(LAC50AP001/002) piping

48.0

13A
14

105.2

58.5

15

Turbine driven boiler feed pump


(LAC60AP001/002) piping

58.5

16

Motor driven boiler feed pump


(LAC70AP001/002) piping

58.5

17

Motor driven boiler feed pump


(LAC80AP001/002) piping

58.5

HP Heater 6A normal drain

55.5

18A

Test
Package
No.

Description

Test Pressure
(bar)

18B

HP Heater 6A emergency drain

55.5

19A

HP Heater 6B normal drain

55.5

19B

HP Heater 6B emergency drain

55.5

HP Heater 6A BIS drip Piping


HP Heater 6B BIS drip Piping
Bleed steam piping of HP Heater 6A
BIS to HPH 6A

55.5
55.5

20
21
22

52.5

23

Bleed steam piping of HP Heater 6B


BIS to HPH 6B

52.5

24

IPT extraction steam piping to HP heater 6A


& 6B BIS

52.5

25

Condensate piping from LP heater 4 to


deaerator

34.5

26

Condensate piping for deaerator & boiler


initial fill up

33.0

27

Deaerator fill up piping from boiler fill pump

33.0

28

Feed water tank overflow piping


Auxiliary steam piping for deaerator
pegging

30.0

29

29.4

30

Auxiliary steam piping for BFPT drive


turbine & gland sleal

29.4

31

IPT extraction steam supply piping to


deaerator pegging and TDBFP drive turbine

27.0

32

Emergency make up system piping from


CST

15.0

33
34
34A
35
35A
36A

Normal make up system piping from demin


plant
Closed cooling water piping
Service water Piping
Auxiliary cooling water piping
Lube oil supply & return piping to central
lube oil purification unit
LP Heater 4 normal drain piping

15.0
15.0
15.0
15.0
15.0
12.0

Test
Package
No.

Description

Test Pressure
(bar)

36B

LP Heater 4 emergency drain piping

12.0

37A
37B

12.0
12.0

39A
39B

Instrument Air distribution piping


Service Air distribution piping
IPT extraction steam supply piping to LP
heater 4
LP Heater 3 normal drain piping
LP Heater 3 emergency drain piping

40A

Main cooling water

6.5

40B

Condenser Tube Cleaning Piping

6.5

41

LPT extraction steam supply piping to


LP heater 3

6.0

42

Condensate extraction pump sealing piping

43

Sealing water distribution piping

38

10.5
10.5
10.5

Balance Inch Dia Weld as


on 02 Nov '15

Balance Inch Dia


Weld as on Date

Total Supports

Supports
Completed

220

Err:509

26

25

920

Err:509

94

49

148
296
72
Hydrotest Completed

Err:509
Err:509
Err:509

42
35
36
12

0
0
1
12

121

Err:509

17

13

13

Hydrotest Completed
118

Err:509

18

262

Err:509

14

Err:509
Err:509

Err:509

22
31
10
9
11
9

0
0
10
0
11
0

Err:509

147

Hydrotest Completed
126
Hydrotest Completed
114
1344

Err:509

Err:509
762

54

Err:509

90

46

Err:509

28

Err:509

22

Err:509

22

Err:509

18

Err:509

18

Err:509

15

Balance Inch Dia Weld as


on 02 Nov '15

Balance Inch Dia


Weld as on Date

Total Supports

Supports
Completed

114

Err:509

16

48

Err:509

11

128

Err:509

15

Err:509
Err:509

17
17

0
0

Hydrotest Completed

Hydrotest Completed

Err:509

17

Err:509

30

12

Err:509

28

Err:509

26

Err:509

18

Err:509

13

Err:509

69

Err:509

38

Err:509

38

Err:509

34

Err:509
Err:509
Err:509

434
56
113

42
0
0

488

672

1983
280

Err:509
Line Completed

0
10

10

Balance Inch Dia Weld as


on 02 Nov '15

Balance Inch Dia


Weld as on Date

60

Err:509

Total Supports

N/A
N/A

Supports
Completed

0
0

156

Err:509

12

28
90

Err:509
Err:509

Err:509

28

Err:509

10

Err:509

186

Err:509

440

Line Completed

298

Target Month for


Hydro Test

Nov/15
Dec/15
Dec/15
Dec/15
Dec/15
Nov/15
Dec/15
Nov/15
Dec/15
Jan/16

Nov/15
Dec/15
Nov/15
Dec/15
Feb/16

Nov/15

Nov/15

Target Month for


Hydro Test

Dec/15

Nov/15

Dec/15

Nov/15
Nov/15
Feb/16

Feb/16

Nov/15
Dec/15
Jan/16
Nov/15

Target Month for


Hydro Test

Dec/15
Feb/16
Feb/16
Feb/16
Nov/15
Dec/15
Dec/15

Feb/16

Remarks

04-Nov

Test package has been divided into


2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into
2 (one for normal dr. and other for
emergency dr.)

Working on the balance status


Working on the balance status

Working on the balance status

Test package has been divided into


2 (one for normal dr. and other for
emergency dr.)

05-Nov

06-Nov

07-Nov

Remarks

04-Nov

05-Nov

06-Nov

07-Nov

28

54

58

Test package has been divided into


2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into
2 (one for normal dr. and other for
emergency dr.)
Test package has been divided into
2 (one for normal dr. and other for
emergency dr.)
Working on the balance status
Working on the balance status
Ready for HT, LHS Pending
Ready for HT, LHS Pending

24

84
Working on the balance status

32
Main Lube Oil work completed,
TDBFP balance

Remarks

Test package has been divided into


2 (one for normal dr. and other for
emergency dr.)

Support Erection i/p


Test
package has been divided into 2
Test package has been divided into
2
Beam fouling issue to be
resolved
Working on the balance status
Working on the balance status

04-Nov

05-Nov

06-Nov

07-Nov

08-Nov

09-Nov

10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

08-Nov

09-Nov

10-Nov

88

92

11-Nov

12-Nov

13-Nov

14-Nov

60

104

110

08-Nov

09-Nov

10-Nov

11-Nov

12-Nov

13-Nov

14-Nov

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

135

128

126

125

135

168

15-Nov

16-Nov

17-Nov

18-Nov

19-Nov

20-Nov

21-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

22-Nov

23-Nov

78

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

22-Nov

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

30-Nov

01-Dec

02-Dec

03-Dec

04-Dec

18

60

29-Nov

30-Nov

01-Dec

24

16

02-Dec

03-Dec

04-Dec

29-Nov

30-Nov

01-Dec

02-Dec

03-Dec

04-Dec