3.0
Primary Clarifier
i.
ii.
iii.
iv.
v.
vi.
vii.
4.0
Aeration Tank
Assumption: Inlet BOD 140 mg/l
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
5.0
i.
ii.
iii.
iv.
v.
6.0
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
Overall volume - 18 m3
Hydraulic residence time - 0.3days (Or, 7.4 hrs.)
Size of the Aeration Tank 3 (L) X 2 m (B) X 3 m (SWD) [Free board = 0.5 m]
Oxygen requirement & diffuser calculation will be provided latter.
Secondary Clarifier
Design flow rate- 1.5 m3/ hr.
Surface Area 1.02 m2
Diameter 1.15 m
Effective Volume - 2.25 m3
Sludge Loading Rate 52.91 kg/m2/day
Overall volume - 2.75 m3
Hydraulic residence time 1.5 hrs.
SWD - 2.7 m
Free board - 0.5 m
pH 7.5
TSS less than 30 mg/l
BOD - less than 20 mg/l
COD - less than 70 mg/l
O&G less than 1 mg/l