SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST


Vent Piping Connection

SAIC NUMBER

DATE APPROVED

SAIC-S-4041

PROJECT TITLE

WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

18-May-05

QR NUMBER

PLUMB

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM
No.

ACCEPTANCE CRITERIA

REFERENCE

A1

Following is the acceptable materials for vent piping:


a) Sch 40 PVC DWV

SAES-S-060
Para 7.1

A2

All piping (vent piping) within buildings shall be concealed unless


otherwise indicated on the construction drawings.

SAES-S-060
Para 313.9

A3

No galvanized wrought iron or steel pipe shall be used underground and


shall be kept at least six (6) inches above ground (UPC Para 903.1.1)

SAES-S-060
Para 1.2

A4

The diameter of an individual vent shall not be less than one and onefourth (1-1/4) inches nor less than one-half the diameter of the drain to
which it is connected. (UPC Para 904.1). Also see item No. A19 in this
SAIC for extra requirements

SAES-S-060
Para 1.2

A5

Where vents connect to a horizontal drainage pipe, each vent pipe shall
have its invert taken off above the drainage center line of such pipe
downstream of the trap being served. (UPC 905.2)

SAES-S-060
Para 1.2

A6

Unless prohibited by structural conditions, each vent shall rise vertically


to a point not less than six (6) inches above the flood level rim of the
fixture served before offsetting horizontally (UPC Para 905.3)

SAES-S-060
Para 1.2

A7

Whenever two or more vent pipes converge, each such vent pipe shall
rise to a point at least in height above the flood level rim of the plumbing
fixture it serves before being connected to any other vent
(UPC Para 905.3)

SAES-S-060
Para 1.2

A8

Vents less than six (6) inches above the flood level rim of the fixture shall
be installed with approved drainage fittings, material and grade to
drain.(UPC Para 905.3)

SAES-S-060
Para 1.2

A9

Each vent pipe or stack shall extend through its flashing and shall
terminate vertically not less than six (6) inches above the roof nor less
than one (1) foot from any vertical surface (UPC Para 906.1)

SAES-S-060
Para 1.2

Each vent shall terminate not less than ten (10) feet from, or at least
three (3) feet above any openable window, door, opening, air intake, or
A10
vent shaft, nor less than three (3) feet in every direction from any lot line;
alley and street excepted (UPC Para 906.2)

SAES-S-060
Para 1.2

A11

PVC DWV piping installation shall be limited to those structures where


combustible construction is allowed

SAES-S-060
Para 903.1.2

A12

Vent pipes for outdoor installation shall extend at least ten (10) feet
above the surrounding ground. (UPC Para 906.4)

SAES-S-060
Para 1.2

Vents from chemical and acid waste systems, including the


A13 neutralization tank vent, shall not be connected to any waste venting
system except a dedicated system

SAES-S-060
Para 905.7

A14

Vent from indirect waste shall extend separately to the outside air.
(UPC Section 803.0)

SAES-S-060
Section 1.2

A15

No vent from indirect waste piping shall combine with any sewer
connected vent. (UPC Section 803.0)

SAES-S-060
Section 1.2

Page 1 of 2

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-INSP DATE

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)


SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Vent Piping Connection

SAIC-S-4041

PROJECT TITLE

ITEM
No.

DATE APPROVED

WBS / BI / JO NUMBER

ACCEPTANCE CRITERIA

REFERENCE

A16 All wet vented fixtures shall be within the same story (UPC Para 908.1)

SAES-S-060
Para 1.2

Each wet vented section (Vertical piping between any 2 consecutive inlet
levels) shall be a minimum of one pipe size larger than the required
minimum waste pipe size of the upper fixture or shall be one pipe size
A18
larger than the required minimum pipe size for the sum of the fixture
units served by such wet vented section, which ever is larger, but in no
case smaller than 2 inches. (UPC Para 908.2)

SAES-S-060
Para 1.2

Voids around piping passing through concrete floor shall be sealed


(UPC Para 313.1)

SAES-S-060
Para 1.2

A19

A20 No piping shall be embedded in concrete or masonry (UPC Para 313.2)

SAES-S-060
Para 1.2

No vents underground or below a floor slab, basement or cellar shall be


less than 2" in nominal diameter.

SAES-S-060
Para 313.9 c

A21

18-May-05

PLUMB

CONTRACTOR / SUBCONTRACTOR

PASS

FAIL

N/A

RE-INSP DATE

SAES-S-060
Para 1.2

Fixtures with a continuous vent discharging into a wet vent shall be within
the same story as the wet vented fixture.(UPC Para 908.1)

A17

QR NUMBER

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-S-060 -- Saudi Aramco Plumbing Code, January 28, 2004
2-SAES-S-010 -- Sanitary Sewers, 31 December, 2002
3-Uniform Plumbing Code (UPC), 2000

Contractor / Third-Party

Saudi Aramco

Construction Representative*

PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

QC Inspector

PID Representative
Performed Inspection

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

QC Supervisor

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Completion of Quality Work / Test

Y = YES

Page 2 of 2

N = NO F = FAILED