Professional Documents
Culture Documents
Build 138 24 Build Right Concrete Slabs and Control Joints
Build 138 24 Build Right Concrete Slabs and Control Joints
BUILD
RIGHT
BY ALIDE ELKINK,
FREELANCE TECHNICAL
WRITER, WELLINGTON
Figure 1
mesh.
polypropylene fibres.
Due to the poor performance of concrete slabs in
Reinforcing mesh
5 mm
25 mm
30 mm
min.
100 mm
EPS polystyrene
hardfill
sand blinding
Figure 2
of the joint.
visibility.
Figure 3).
9m
3m
3m
7m
4m
5m
5m
12 m
4.5 m
Figure 3
4.5 m
3m
engineering design.
that 6 6 m.
Referenced standards
control joints.
still applies.