Routing - Create
Use this process when a new routing for material is needed.
A routing is a description of which operations (process steps) and the order in which they have to be
carried out to produce a material (item). In addition to the information about the operations and their order,
a routing also contains details about the work centers where the work is to be performed as well as any
required production specifications and tooling (ie text and fixturing). Standard values for the execution of
individual operations are also saved in routings.
Activity
1. Follow the SAP menu as shown, or type the transaction code CA01 in the command field.
Page 1 of 23
Business Process
End User
Procedures
Description
R/O/C
Material
Material Number
Plant
Sales Document
Sales Document
Item
WBS Element
R
O
Group
Automatically Created
by System. This is the
unique Routing Number
Section Heading
Number used to
uniquely identify a
change master record
Identifies the validity
Date of the Routing
Leave Blank
Identifies Revision of
this Routing
Section Heading
Key to group of default
Validity
Change Number
Key Date
Revision Level
Additional Data
Profile
Created on: July 29, 2014
Changed on: March 15, 2016
Comments
Required for Material
Routing
Required for Material
Routing
Required for KMAT
Materials only
Required for KMAT
Materials only
Not Used for Material
Routing
Page 2 of 23
Business Process
Field Name
Description
R/O/C
settings
End User
Procedures
Comments
3. Click Enter.
Results: The Create Routing: Header Details screen Display.
Field Name
Task list
Group
Created on: July 29, 2014
Changed on: March 15, 2016
Description
Section Heading
Unique Identifier of the
R/O/C
R
Comments
Assigned by System
Page 3 of 23
Business Process
Field Name
Group Counter
Plant
Production Line
Line hierarchy
General data
Description
Routing
Identifies the
Occurrence of the
Routing
Identifies the Plant
Where the Routing is
Used
Section Heading
The uppermost level of
the hierarchy, if
hierarchies are being
used.
Section Heading
R/O/C
Comments
None Automatically
Assigned by the system
None
Enter 1 (Production) or
select from Pull Down
Menu
Enter 4 (Release general) or select from
Pull Down Menu
Enter Responsible group
or select from pull down
menu.
Leave Blank
Leave Blank
Usage
Status
Planner Group
Sample drawing
procedure
Dynamic mod. Level
Modification Rule
Further QM data
Ext. numbering
End User
Procedures
O
O
O
Select if desired
Display only
Page 4 of 23
Business Process
Field Name
Description
Administrative Data
Section Heading
Change number
Valid from
Valid to
Created on
Created by
Changed on
Changed by
Archive Date
Last call
No. of calls
4. Click
R/O/C
End User
Procedures
Comments
Select Green arrow
check to display this
section
Display only
Display only
Display only
Display only
Display only
Display only
Display only
Display only
Display only
Display only
Page 5 of 23
Business Process
End User
Procedures
NOTE:
It is common to enter only those fields that are required on this screen, and then add
additional detail information in the next step.
Field Name
Description
R/O/C
Operation
Sequence Number of
the Activity or Operation
Sop
Sub Operation
Sequence Number
Work Center
Plnt
Description
Control Key
Long Text
Classification
Indicates classification
exists
Object Deps
Period-dependent
operation parameters
Comments
Page 6 of 23
Business Process
Field Name
Cumulation type
Sub-oper.
Base quantity
Unit of Measure
Runtime value
Unit
Activity Type
Setup value
Unit
Activity Type
Fixed Overhead
Unit
Activity Type
Variable Overhead
Standard Value
Activity Type
Scrap
Description
operation.
Indicates whether the
standard values of the
sub operations are
cumulated onto the
operation and whether
this only occurs in the
order or also in the
routing
Indicates that suboperations are not
transferred
Quantity of the material
to be produced to which
the standard values of
the operation refer
Unit of measure used in
the operation for the
material to be produced
Total time required for
the process operation.
Unit of time measure for
the runtime value
Describes the activity
produced by a cost
center and is measured
in units of time
Total time required for
the setup operation.
Unit of time measure for
the setup value
Describes the activity
produced by a cost
center and is measured
in units of time
Accounting value for the
operation time
Unit of time measure for
the fixed overhead
Describes the activity
produced by a cost
center and is measured
in units of time
Accounting value for the
operation time
Unit of time measure for
the variable overhead
Describes the activity
produced by a cost
center and is measured
in units of time
Material scrap factor is
the amount of scrap (in
percent) for the
operation
Key that determines the
key words (field names)
for key words (field
names) for user defined
fields.
End User
Procedures
R/O/C
Default Qty. 1
Default Unit EA
R
O
O
O
O
O
O
O
O
O
O
O
Comments
No entry required
No entry required
No entry required
Not used
Not used
Page 7 of 23
Business Process
Field Name
Non-value added
indicator
Change number
Valid from
Valid to
Created on
Created by
Changed on
Changed by
Ref. Task list
Ref. Task list
Std value
Calc. type
Std. Value Calc. date
Std. Value Calc. basis
Std. Value Code
Description
Indicates an operation
that is not part of the
value-added chain.
Number that uniquely
identifies a change
master record
Start date for the validity
period of an object
End date of validity
period of an object
Date on which the
record was created
User name of user who
created the record
Date on which the
record was changed
User name of user who
changed the record
Group counter of the
operation set referred to
Group counter of the
operation set referred to
Key which controls how
the std values are
calculated.
Year in which std.value
was calculated
Number which refers to
the basis used for
calculating std. values
Number of the std. value
code used in calculating
std values.
R/O/C
End User
Procedures
Comments
Not used
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
Not used
Not used
Not used
Not used
Not used
Not used
6. From the Create Routing: Operation Overview select an operation by double-clicking on the
operation number. For example, select operation 0010 a screen with additional detailed
information will appear.
Page 8 of 23
Business Process
End User
Procedures
Page 9 of 23
Business Process
End User
Procedures
Note: Entering data into the fields described below will override any Interoperation times
for work center from std. queue time enter in the work center.
Field Name
Reduction strategy
Teardown/wait simul.
Description
Key which specifies the
strategy for reducing the
lead time of an operation
or activity
Indicator you use to
specify that teardown
and wait times are
carried out in parallel.
Longest time that may
pass before the material
is processed in the next
operation or order.
Shortest time that must
pass before the material
can be processed in the
next operation or order.
Time an order normally
waits at the work center
before it is processed.
R/O/C
Comments
Enter only if you wish to
use reduction strategy
Page 10 of 23
Business Process
End User
Procedures
Page 11 of 23
Business Process
End User
Procedures
Page 12 of 23
Business Process
Field Name
Description
Operation
Section Heading
R/O/C
End User
Procedures
Comments
Page 13 of 23
Business Process
Field Name
Description
R/O/C
Operation
Activity or Operation
Sequence Number
Sub-Operation
Sub-operation sequence
Number
Comments
No entry required
No entry required
No entry required
Not used
Control Key
Standard Values
Base Quantity
Act./Operation UoM
Break
UOM
Runtime value
Runtime: Un
Runtime: Activ type
Runtime: Efficiency
Setup value
Setup: Un
Setup: Activ type
Setup: Efficiency
Fixer Overhead: Std
value
Fixer Overhead: Un
Fixer Overhead: Activ
type
Fixer Overhead:
Efficiency
Variable Overhead: Std
value
Variable Overhead: Un
Section Heading
Quantity upon which all
standard values are
based
Unit of Measure for
operation
Break Time available
during operation
Break Time Unit of
Measure
Total time required for
the process operation.
Unit of time measure for
the runtime value
Describes the type of
activity produced by a
work center
Key for performance
efficiency rate
Total time required for
the setup operation.
Unit of time measure for
the setup value
Describes the type of
activity produced by a
work center
Key for performance
efficiency rate
End User
Procedures
R
R
C
O
O
O
Not used
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
Not used
No entry required
No entry required
No entry required
Not used
No entry required
Defaulted from
configuration
No entry required
O
O
No entry required
No entry required
No entry required
Not used
Page 14 of 23
Business Process
Field Name
Variable Overhead:
Activ type
Variable Overhead:
Efficiency
Business Process
Unit of measure
conversion
Header
Un
Op.
Un
Transfer to orders
Cumul. Type
Suboper do not apply
Standard Value
Calculation
Calculation Type
Calculation Date
Calculation Basis
Standard Value Code
CAPP
CAPP Prod. Order
CAPP Text Created
Interoperation Times
Reduction Strategy
Tear down/Wait Simul
Max Wait Time
Unit of Measure
Min Wait Time
Unit of Measure
Std Queue Time
Unit of Measure
Min Queue Time
Unit of Measure
Std Move Time
Description
value
Describes the type of
activity produced by a
work center
Key for performance
efficiency rate
Key identifying a
business process
Section Heading
Number for converting
header to operation
UOM
Header Unit of measure
Denominator for
converting to Operation
Uom
Operation UOM
Section Heading
Cumulation type for
standard values
If box is checked, then
sub-operations are not
transferred to the order
Section Heading
Key for Standard value
calculation parameters
Year in which the
standard value was
determined
Pointer to base formula
Key point to reference
value table
Section Heading
Key pointing to how
standard values will be
calculated via CAPP
Flag indicating CAPP
text has been created
Section Heading
Key identifying the
reduction strategy to be
used
Flag identifying tear
down and waiting occur
simultaneously
Longest time that can
pass before the next
processing step
Minimum time that must
pass before next
operation
Normal Waiting period
Minimum waiting period
Normal time required for
moving material to next
operation
R/O/C
O
End User
Procedures
Comments
No entry required
Not used
Not used
No entry required
R
R
No entry required
No entry required
Defaulted
No entry required
Not used
C
C
Not used
C
C
Not used
Not used
Not used
Not used
Not used
Not used
Click on if desired
Not used
Not used
C
O
Not used
Not used
C
O
C
O
C
O
Not used
Not used
Not used
Not used
Not used
Not used
Not used
Page 15 of 23
Business Process
Field Name
Description
R/O/C
Comments
Not used
Enter if applicable
Not used
Not used
R
C
O
C
No entry required
No entry required
Not used
Not used
Not used
Not used
Not used
No entry required
Not used
Enter if applicable
Not used
Not used
Unit of Measure
Min Move Time
Unit of Measure
Interoperation times
for work center
Std queue time
Unit of Measure
Min Queue Time
Unit of Measure
Splitting
Required Splitting
No. of Splits
Min Processing Time
UOM
Overlapping
O
Section Heading
Required overlapping
Used to indicate
mandatory overlapping
Optional Overlapping
Continuous flow
production
No Overlapping
Blank box
Min send-ahead qty
General Data
Scrap in %
Section Heading
Expected scrap during
operation
Number of time tickets
to be printed
O
O
Number of confirmation
slips to be printed
Wage Group
End User
Procedures
Not used
Not used
Not used
Not used
Not used
Not used
Not used
Page 16 of 23
Business Process
Field Name
Description
Wage Type
Suitability
Key pointing to
qualifications
requirements
Number needed to carry
out operation
Key identifying setup
parameters
Classification of
categories of setup
groups
Key grouping operations
with same or similar
conditions
Key determining where
and how a BOM item is
relevant to costing
Indicates an operation
that is not part of the
value-added chain.
Number of Employees
Setup Key Type
Setup Group Category
Setup Group Key
Costing Relevancy
Non-value added
Required Qualification
Qualification regarding
capacity cat.
Qualifications
Section Heading
Capacity category
requiring qualification
Section Heading
Requirements profile
(LO), Job, position
Qualification
External Processing
Subcontracting
Purchasing Info Rec
R/O/C
End User
Procedures
Comments
Not used
Not used
Not used
Default setting X
Enter if desired
Not used
Select requirements
profile, job, or position.
Enter search criterion for
qualifications
requirements.
Enter appropriate value
Not used
O
O
Not used
Not used
Not used
Not used
Not used
Check box if
subcontracting operation
will be used.
Default Info Record will
be 5500000000. Enter
in field.
Page 17 of 23
Business Process
Search Screen
Search Screen
Material Group
Search Screen
Short Term
Search Screen
End User
Procedures
Page 18 of 23
Business Process
Purchasing Org
Outline Agreement
Item, outline agreement
Sort String
Material Group
Purchasing Group
Vendor
Plnd Delivery Time
Price Unit
Cost Element
Net Price
Currency
Inspection type
End User
Procedures
Enter if desired
No entry Required
Note: In it does not
default enter 3000
Not used
Enter if desired
Not used
No entry Required
No entry Required
No entry Required
No entry Required
No entry Required
No entry Required
No entry Required
No entry Required
Page 19 of 23
Business Process
7.
End User
Procedures
The Material Number must be entered in the Standard Text Key Description
field as shown above when an External Process Info Record is created.
Quality Management:
Recording View
Valid from
Valid to
Created on
Created by
Changed on
Changed by
Admin data for
Allocation/
Operation/
Task list
Change number
Valid from
System defaults to a
standard recording
screen
Not used
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
Page 20 of 23
Business Process
Created on
Created by
Changed on
Changed by
End User
Procedures
No entry required
No entry required
No entry required
No entry required
1. On screen Create Routing: Material Component Overview, display information in the fields as
specified in the below table (accessed via CompAlloc Overview button):
This procedure is not required to complete the routing. The material will be
allocated automatically to the first operation when the routing is saved
Ph
L
Path
Item
Component
Quantity
Un
Item cat
Material description
Comp.BOM
Phantom item
indicator
Level in multi-level
BOM explosion
Path in multi-level
BOM explosion
Item number in BOM
BOM part number
Quantity of
component needed to
make the base
quantity
Unit of measure from
BOM master
Item category
Description of
material
Number used in
combination with the
BOM categoryto
uniquely identify a
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
No entry required
Page 21 of 23
Business Process
End User
Procedures
Alternative BOM
BOM item for the
uppermost level
No entry required
No entry required
2. On screen Create Routing: Material Component Overview, select the desired BOM components.
3. Click on the New Assignment button to link BOM components to the desired operation. In most
cases, it is preferable to select all of the components and allocate them to the first operation.
Page 22 of 23
Business Process
End User
Procedures
4. Enter the operation number the components are to be assigned to and click the green check to
complete the assignment.
5. Click
Page 23 of 23