B14 NV BOOM
MAINTENANCE MANUAL
Page 2
B14 NV BOOM
B-05-07-2005 SR-MC-FL
PRELIMINARY REMARKS
1/1
SAFETY
1/2
DESCRIPTION
2/1
EXPLANATION
2/2
FEATURES
2/3
MAIN COMPONENTS
MAINTENANCE OPERATIONS
10
3/1
10
3/2
10
3/3
10
3/4
200-HOURS OPERATIONS
11
3/5
11
3/6
11
TIGHTENING TORQUES
12
LUBRICATION
13
GREASE POINTS
13
OPERATING METHODS
14
6/1
14
6/2
15
6/3
16
6/4
16
6/5
17
17
7/1
17
7/2
17
7/3
7/4
19
LIFTING - HANDLING
20
21
5/1
B14 NV BOOM
B-05-07-2005 SR-MC-FL
Page 3
1 PRELIMINARY REMARKS
1/1 SAFETY
The informations contained in this manual must be studied and thoroughly assimilated before
undertaking any maintenance work on the equipment
WARNING
WARNING
WARNING: Before any operation stabilize and fix steadily all the elements on suitable
pedestals. Stop the power packs, switch the general power breaker. Place a tag or a
board to warn other members of the personnel that maintenance work on the machine
is in progress.
WARNING: Pressurized oil jets could cause severe injuries. Before any operation on
hydraulic circuit, STOP the power packs and release remaining pressure in
components by operating hydraulic control levers several times. Always release the
static pressure in cylinders before disassemble them.
NEVER WORK ON AN OPERATING CIRCUIT.
WARNING: While tests are in progress, do not allow any other member of the
personnel to stand in the area surrounding the machine. Stay at the control station to
be able to stop the movement and switch off the power pack.
WARNING
CAUTION: Always use suitable tools and work in a clean place when dismantling and
assembling hydraulic components. After removing cylinders the hydraulic inlet/outlet
ports must be plugged to prevent dirt and air intrusion during operation.
WARNING: The operator must always wear required personal protection, such as safety
helmet, protective overall, safety boots, hearing protectors, safety goggles etc.
WARNING
Page 4
B14 NV BOOM
B-05-07-2005 SR-MC-FL
SAFETY
Always wear protective clothing, eye protection, earmuffs, safety footwear, and
other safety equipment required by the work.
B-05-07-2005 SR-MC-FL
B14 NV BOOM
Page 5
Page 6
B14 NV BOOM
2) DESCRIPTION
2/1 EXPLANATION
The
B14
NV
BOOM
are
multidirectional
and
telescopic
booms used in small galleries and
medium sections.
They can be used for face, wall, roof
or floor drilling and for initiating crosscuts, by swinging the drill feed
through a combination of 7
movements.
2/2 FEATURES
Boom weight without hoses: 1050 kg
Hydraulic pressure in cylinders: 210 bar
Movements amplitude.
B-05-07-2005 SR-MC-FL
B-05-07-2005 SR-MC-FL
B14 NV BOOM
Page 7
8
5
10
3
Page 8
B14 NV BOOM
B-05-07-2005 SR-MC-FL
3 MAINTENANCE OPERATIONS
CAUTION: The safety of users and the reliability of the boom depend on the maintenance operations
and imply the use of genuine SANDVICK TAMROCK SECOMA spare parts.
All defective parts must be immediately replaced.
WARNING: Maintenance, adjustment and repairs are restricted to qualified personnel
with special training for the particular equipment. Always read the instructions
carefully before starting any maintenance work.
WARNING
WARNING: While tests are in progress, do not allow any other member of the personnel
to stand in the area surrounding the machine. Stay at the control station to be able to
stop the movement and switch off the power pack.
WARNING
B-05-07-2005 SR-MC-FL
B14 NV BOOM
Page 9
Check clearance between the boom extension tube and armature. Check the condition of the plastic
skids.
3/5 1200-HOURS OR ANNUAL OPERATIONS
Check the overall condition of the equipment.
CAUTION: Check welding condition using crack detector products.
Search for leaks.
Check the condition of the hydraulic equipments (cylinders, hoses, hydraulic unions,...).
Check the extension tube. Lubricate it.
Lubricate all the grease points.It is important to check that the rotary actuator grease discharge
valves are working properly.
Check the tightening torque of the cylinders and articulations expendable pin.
3/6 3600-HOURS OPERATIONS OVERALL INSPECTION AND RECONDITIONING
Remove the boom assembly.
Remove, dismantle and check the different parts. Remove all worn or defective parts.
Change the seals, (bronze washers),washers and extension tube guide skids.
Reassemble the boom.
Test for correct operation.
NB: You can recover all these operations in the periodic maintenance table (last page of this
manual) we invite you to use this document.
Page 10
B14 NV BOOM
B-05-07-2005 SR-MC-FL
4) TIGHTENING TORQUES
For basic genuine SANDVIK TAMROCK SECOMA screws and nut use the following tightening
torque:
metric dimension
M6
M8
M10
M12
M14
M16
M18
M20
M22
M24
M27
M33
M36
M39
M42
torque in Nm
torque in Nm
HEX BOLTS
GRADE 8.8
10
25
50
85
130
200
280
400
530
670
1000
1780
2300
3000
3700
16
40
80
140
210
330
460
650
880
1130
1650
2200
3850
5050
6250
B-05-07-2005 SR-MC-FL
B14 NV BOOM
Page 11
5) LUBRICATION
Use Mobilith SHC 220, Mobilgrease HP 222 or equivalent.
5/1 GREASE POINTS
There is a grease nipple on any pins. There is two grease nipples at each end of any rotary actuator.
CAUTION: Check that the rotary actuator grease discharge valves are working properly. They are
situated at the opposite side of each grease nipple. Those valves must release excess grease to avoid
over-pressure and over-stress on actuators seals and flanges.
Remove faulty valves.
Page 12
B14 NV BOOM
B-05-07-2005 SR-MC-FL
6 OPERATING METHODS
WARNING: Before starting any maintenance operation ensure that the machine is in a
safe location with good safety, ventilation and lighting conditions. Ensure that lifting
equipments and pedestals are compatible with elements weight. Follow all the safety
instructions and ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.
WARNING: Maintenance, adjustment and repairs are restricted to qualified personnel
with special training for the particular equipment. Always read the instructions
carefully before starting any maintenance work.
WARNING
Before removal:
Lift or stand parts with adapted devices.
Release static pressure in hydraulic circuit and
cylinders
(See
bleeding/breezing
and
decompression).
4
5
3
5
Figure A
Refitting:
Grease all parts.
Centre the expendable pin in its housing
Position spacers, expendable blocking cone and caps
(See figure B).
Torque tighten the screw according to the diameter
(See page 9).
Operate several movement cycles and retighten the
screw.
Check an retighten at weekly operation maintenance
session.
Figure B
B14 NV BOOM
B-05-07-2005 SR-MC-FL
Page 13
BALL
JOINT
BRACKET
BRACKET
D 40
D 45
200 Nm
190 Nm
D 50
D 57
300 Nm
290 Nm
D 60
D 68
500 Nm
490 Nm
When a cylinder is removed, make sure that no part of the boom is left
unsupported
6/3 REMOVING AND REFITTING A CYLINDER
Removal:
Lift or stand the boom with adapted devices to prevent a sudden fall of moving parts when operating
decompression.
WARNING: Stop power packs and proceed an hydraulic circuit decompression.
Disconnect hydraulic hoses and plug the inlet/outlet ports of the cylinder.
Fasten the cylinder to prevent its fall.
Remove expendable pin sets.
Refitting:
Place the cylinders rear knuckle in the yoke, insert the expendable pin set and screw. Do not fully
tighten.
Adjust rod extension to place the front knuckle on the other yoke. Insert axis set. Tighten both of them
(See "tightening torques" page 10).
Reconnect hoses.
Pressurize the circuit, bleed and test.
SANDVIK TAMROCK SECOMA S.A.S
19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80
Page 14
B14 NV BOOM
B-05-07-2005 SR-MC-FL
WARNING: While tests are in progress, do not allow any other member of the personnel
to stand in the area surrounding the machine. Stay at the control station to be able to
stop the movement and switch off the power pack.
WARNING
B14 NV BOOM
B-05-07-2005 SR-MC-FL
Page 15
For more informations about the cylinders mounting, see the cylinder
maintenance manual in SECTION 1.
WARNING
WARNING: Pressurized oil jets could cause severe injuries. Before any operation on
hydraulic circuit, STOP the power packs and release remaining pressure in
components by operating hydraulic control levers several times. Always release the
static pressure in cylinders before disassemble them.
NEVER WORK ON AN OPERATING CIRCUIT.
7/2 CHECK WELDING CONDITION USING CRACK DETECTOR PRODUCTS
Stress, vibrations, impacts, corrosive agents could cause invisible cracks in weldings.Then it is
extremely important to checks them in order to prevent breakdowns, accidents and injuries risks.
1,5mn
1,5mn
Page 16
B14 NV BOOM
B-05-07-2005 SR-MC-FL
LEFT2
LEFT1
2
1
RIGHT2
RIGHT1
Figure 1
LOWER1
LOWER2
Gap check
Line up the boom horizontally and align it with jumbos axis.
remove plate 1 and dust seal 2.
Fully extend the tube and clean it.
Gauge the gap A between tube and armature.
Sling the end of the tube and raise it.
Gauge the gap B between tube and armature.
The clearance between the tube and the armature is
estimated as following:
Jeu A
Skidss clearance: J= A - B
CAUTION:
MAXIMUM CLEARANCE J= 2mm
Jeu B
Clearance adjustment
Untie and let the boom rest by its own weight then
remove plate, shims and skids LOWER2 and UPPER1.
Measure the skids thickness, it must be above 24 mm.
Measure the shims + skid stack, it must be above 32
mm
Minimum thickness of all the skids = 24mm
Minimum thickness of shims + skid stack = 32mm
Figure 2
B-05-07-2005 SR-MC-FL
B14 NV BOOM
Page 17
Reassemble LOWER2 & UPPER1 shims and skids and affix plates.
Sling the end of the tube and raise it. Remove LOWER1 & UPPER2 skids.
Check skids condition and replace if they are beyond limits.
Adjust shim stack in order to have the same thickness for LOWER1 & LOWER2. Then Adjust shim stack in
order to have the same thickness for UPPER1 & UPPER2.
This levelling ensure a good parallelism between tube and armature axis.
Refit all parts and check J clearance, if it stays beyond limit value put shims on UPPER1 & UPPER2
stacks. (there are two type of shims: 0.5mm and 1mm).
NOTE: Tighten plates screws at 150Nm torque.
Lubricate tube and proceed following tests:
Extend and retract tube in horizontal position. Gauge hydraulic operating pressure needed in cylinder
while operating backward and forward movements.
Max. pressure for forward translation: 120bar
Max. pressure for backward translation: 180bar
In overpressure situation, free the tube translation by removing a 0.5mm shim in UPPER1 & UPPER2
stacks.
Proceed similar operations for lateral clearance adjustment.
Page 18
B14 NV BOOM
B-05-07-2005 SR-MC-FL
8 LIFTING - HANDLING
LIFTING POINT
WARNING: Before starting any maintenance operation ensure that the machine is in a
safe location with good safety, ventilation and lighting conditions. Ensure that lifting
equipments and pedestals are compatible with elements weight. Follow all the safety
instructions and ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.
WARNING: Check the cables you use, they must be in good condition and fit the weight of the
assembly you are going to lift.
Fasten correctly the elements before starting operations .
OUI
OUI
NON
NON
B14 NV BOOM
B-05-07-2005 SR-MC-FL
Page 19
Serial number:
Name:
Date:
Firm:
R
P
V
O
Check Adjust
Clean
Replace
Lubricate
PERIODS
600
PH
DONE
Shift
50 PH 200
PH
Leakage detection
RO RO RO
RO
extension tube
Dust seal
R
P
V
O
Remove boom.
Inspect all elements.
remove worn out parts.
Tests
YES
NO
Page 20
B14 NV BOOM
B-05-07-2005 SR-MC-FL