Professional Documents
Culture Documents
Toc
Toc
Chapter
Description
Page
EXECUTIVE SUMMARY
a-b
1.1
1.2
1.3
1.4
1.5
1
1
2
3
5
PROJECT DESCRIPTION
2.1
2.2
2.3
2.4
2.5
7
7
8
10
13
Introduction
Justification of the Project
Location and Layout
Project Description
Types of Vessels Expected
14
3.1
3.2
14
16
16
16
17
17
18
18
18
19
20
20
21
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
4
General
Objectives
National Environmental Policy
EIA Methodology
Organisation of The EIA Report
Introduction
The Harbour
3.2.1 Maneuvering Facilities
3.2.2 Bathymetry
3.2.3 Vessel Characteristics
Fort George CEB Thermal Plant
The Mauritius Chemical & Fertilisers Industry Ltd
Bulk Cement Terminal
Les Moulins De La Concorde (LMC LTD)
The Caudan Waterfront Development
The Bulk Sugar Terminal (BST)
Coal Terminal
Historical, Cultural and Recreational Sites
21
4.1
4.2
4.3
22
22
22
22
25
25
27
34
34
43
44
45
4.4
4.5
Introduction
Site and Surroundings
Land Environment
4.3.1 Topography
4.3.2 Geology
4.3.3 Soil
4.3.4 Land Use
Air Environment
4.4.1 Climate
4.4.2 Waves and Tides
4.4.3 Air Quality
Noise Environment
4.6
Water Environment
4.6.1 Drainage
4.6.2 Marine Water Quality
4.6.3 Terrestrial Water Quality
4.6.4 Sewage Discharges
4.6.5 Industrial Effluents
4.6.6 Refuse and Litter
4.6.7 Wastes
45
45
46
48
48
48
49
49
4.7
50
ENVIRONMENTAL IMPACTS
51
5.1
5.2
5.3
5.4
51
51
51
51
52
52
53
54
54
5.5
Introduction
Impacts at Project Conceptual Level
Impacts during Construction Phase
Other Considerations
5.4.1 Noise Nuisance
5.4.2 Water Pollution from Equipment and Site Staff
5.4.3 Solid Wastes
Impacts during Operation Phase
5.5.1 Oil Spills
55
6.1
6.2
55
56
LIST OF FIGURES
Figure 2.1
Figure 2.2
Figure 3.1
Figure 4.1
Figure 4.2
Figure 4.3
Figure 4.4
Figure 4.5
Figure 4.6
Figure 4.7
Figure 4.8
Figure 4.9
:
:
:
:
:
:
:
:
:
:
:
:
ii
9
12
15
23
24
26
29
30
32
36
38
41
LIST OF TABLES
Table 3.1:
21
Table 4.1:
33
Table 4.2:
37
Table 4.3:
37
Table 4.4:
42
Table 4.5:
42
Table 4.6:
43
Table 4.7:
45
Table 4.8
47
ANNEXES
Annex 1:
Annex 2:
Annex 3:
Annex 4:
iii