Sheraton Hotel Islamabad - Electrical Works

ITEM
No.
Sec-A

DESCRIPTION

QTY

UNIT

Job.

Job.

Job

Job

Sub-station Equipment & Works


Supply, installation, testing and commissioning of following
equipment / works in sub-station

HT (11 kV) switchboard complying with following principal


requirements

Vaccum technology, withdrawable type, with colour coded


insulated bus bars, symmetricaql short circuit level of 350
MVA, BIL 75 KV, grounding switch on cable side, electronic
over current and earth fault relay voltmeter with selector switch
on incoming side, ammeter with selector switch on all
panels,energy metering to Utility standard, alarm accept ,
reset, lamp test push buttons, alarm for fault trip/ conditions.
a
1-incoming and 2-outgoing 630 Amps vaccum circuit breakers
b
1-incoming and 3-outgoing 630 Amps vaccum circuit breakers
2

1500 KVA, 11/0.44 KV distribution transformers, dry type


Synchronizing panel for parallel operation of 6-1500 kVA DG
sets, including outgoing circuit breakers for supply to panels
and equipment

4
Auto transfer switch with incoming supply from transformer
(Supply 1) and DG sets
(Supply 2)
a

400 Amps for fire pumps

Job

2500 Amps for MSB 1 to 5

Job

Main LV switchboards as under

a
b
c
d
e
f

MSB 1
MSB 2
MSB 3
MSB 4
MSB 5
Capacitor Bank for MSB's

1
1
1
1
1
5

Job
Job
Job
Job
Job
Job

LV Rising main (Bus Tie Duct & Tap off)


8
Following ratings of three phase+neutral+ground bus-tie ducts
comprising of aluminium bus, fully insulated with supports,
joints, floor seals, cable connection and termination box,
complete as per site requirements.
a

800 Amp

500

Mtr.

1500 Amp

350

Mtr.

1 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

2 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
9

a
b
c
d
e
f

DESCRIPTION

QTY

UNIT

65
80
15
10
15
15

No.
No.
No.
No.
No.
No.

1400
2500
35
60

Mtr.
No.
No.
No.

200
200

No.
No.

1000

Mtr.

Job

4500

Mtr.

Copper clad steel rod


Earth pit for wheel load of 5 tons

50

No.

95mm2 earth lead to earth rod including PVC pipe for


underground run

500

Mtr.

Lightning protection bonding bar for termination of down


conductor (LPBB), 300x50x10 mm

35

No.

Following size of tap-off boxes three phase and neutral


40 Amp
63 Amp
125 Amp
175 Amp
200 Amp
250 Amp
Total of Sec-A
Carried Forward to Summary

Sec-B

Lightning Protection System


Providing, installing and testing of lightning protection system
as per NFPA 780

1
a
b
c
d
2
a
b

3
a
b
c
d
e
f

Roof conductor including


accessories
Cable - 70 sq.mm
Surface fixing clip
T-connector
Cross connector

all

installation

Vertical air terminations comprising of


long copper rod including base
Air termination
Base

material

and

16MM dia. 500mm

1-core 16 sq.mm copper conductor for bonding of metal work


and equipment on roof including appropriate type and size of
clamp for bonding.
Conductor - 16 sq. mm
Surface fixing clip
Tap-off clip from 50 sq.mm conductor for 16 sq.mm conductor
Clip for bonding cable trays
Clamps for bonding pipes
Clamps for bonding structural steel

Down conductor 70 sq.mm bare copper in 38 mm dia schedule


40 pipe embedded in column

17.2 mm dia copper clad steel rod as down conductor including


earth pit,ground enhancement material and earth lead from
LPBB to earth pit, protective PVC pipe

a
b
c

3 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

4 of 90

Sheraton Hotel Islamabad - Electrical Works


DESCRIPTION

QTY

UNIT

Earth loop around building with bare 95 sq.mm copper


conductor buried 600mm below ground level.

3500

Mtr.

Exothermic connections as below:

Down conductor to pile cap rebar

b
c

LPBB to rebar of pile cap


External earth loop to earth rod

No.

2800

Mtr.

90

No.

2000

Mtr.

Job.

500

No.

500

Mtr.

2000

Mtr.

Job

ITEM
No.

(Note: All underground connections shall be exothermic


type)
Total of Sec-B
Carried Forward to Summary
Sec-C

Earthing System
Earth system comprising of the following. The earthing system
shall be connected to external earthing loop.

1
95 sq.mm copper conductor for body earthing of generator, 11
kV switchboards, transformer, LV panels. The cable shall be
clipped directly to the surface of wall or run on floor of PVC
pipe. Provide 2-connections from each equipment to EBB in
sub-station. All EBBs shall be inter-connected by 2x95 sq.mm
conductor.
2

Earth bonding bus bar 450x100x10 mm (EBB).

95 sq.mm PVC cable for connection of transformer neutral to


neutral earth bus-bar (NEBB)

4
Exothermic connection between external earth loop with 95
sq.mm copper conductor to NEBB and EBB
Earthing of basement levels
5
6

Earth bonding bus bar 450x100x10 mm (EBB).

95 sq.mm copper conductor for interconnection of EBBs.


1-core 16 sq.mm copper conductor for bonding of metal work
and equipment appropriate type and size of clamp for
bonding.

a
b

Bonding of metal work and equipment appropriate type and


size of clamp for bonding.
Conductor - 16 sq. mm
Surface fixing clip

Tap-off clip from 50 sq.mm conductor for 16 sq.mm conductor

d
e
f

Clip for bonding cable trays


Clamps for bonding pipes
Clamps for bonding structural steel

5 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

6 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

Total of Sec-C
Carried Forward to Summary
Sec-D
1

LV Switchgears
Supply, installation, testing and commissioning of 600/1000V,
3Ph, 4 Wire including breakers, terminations, isolators,
supports, accessories, etc., complete as per drawings,

MDB- B4- LP1


MDB- B4- LP2
MDB- B4- HVAC1
MDB- B4- HVAC2
SMDB-B6-LP
SMDB-B6-HVAC
SMDB-B5-LP
SMDB-B4-LP1
SMDB-B4-LP2
SMDB-B4-HVAC1
SMDB-B3-LP1
SMDB-B3-LP2
SMDB-B3-HVAC1
SMDB-B3-HVAC2
SMDB-B2-LP1
SMDB-B2-LP2
SMDB-B2-HVAC1
SMDB-B2-HVAC2
SMDB-B1-LP1
SMDB-B1-LP2
SMDB-B1-HVAC1
SMDB-B1-HVAC2
SMDB-BR-LP1
SMDB-BR-LP2
SMDB-BR-HVAC1
SMDB-BR-HVAC2
SMDB-PD-LP1
SMDB-PD-LP2
SMDB-PD-HVAC1
SMDB-PD-HVAC2
SMDB-LB-LP1
SMDB-LB-LP2
SMDB-LB-HVAC1
SMDB-LB-HVAC2
SMDB-1F-LP1
SMDB-1F-LP2
SMDB-1F-HVAC1
SMDB-2F-LP1
SMDB-2F-LP2
SMDB-2F-HVAC2
SMDB-3F-LP3
SMDB-3F-LP4

7 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

8 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

SMDB-3F-HVAC1
SMDB-4F-LP1
SMDB-4F-LP2
SMDB-4F-HVAC2
SMDB-5F-LP1
SMDB-5F-LP2
SMDB-5F-HVAC1
SMDB-6F-LP1
SMDB-6F-LP2
SMDB-6F-HVAC2
SMDB-7F-LP1
SMDB-7F-LP2
SMDB-7F-HVAC1
SMDB-8F-LP1
SMDB-8F-LP2
SMDB-8F-HVAC2
SMDB-9F-LP1
SMDB-9F-LP2
SMDB-9F-HVAC1
DB-B8-LP1
DB-B8-LP2
DB-B6-L1
DB-B6-L2
DB-B6-P1
DB-B6-P2
UDB-B6-P3
UMDB-B6
DB-B6-ST
DB-B6-LUD
DB-B6-SS
DB-B5-LP1
DB-B5-LP2
DB-B5-LP3
DB-B5-LP4
DB-B4-LP1
DB-B4-LP2
DB-B4-LP3
DB-B4-LP4
DB-B4-LP5
DB-B4-LP6
DB-B4-LP7
UDB-B4-1
UDB-B4-2
DB-B3-LP1
DB-B3-LP2
DB-B3-LP3

9 of 90

QTY

UNIT

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

10 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

DB-B3-LP4
DB-B3-LP5
DB-B3-LP6
DB-B3-LP7
UDB-B3-1
UDB-B3-2
DB-B2-LP1
DB-B2-LP2
DB-B2-LP3
DB-B2-LP4
DB-B2-LP5
DB-B2-LP6
DB-B2-LP7
UDB-B2-1
UDB-B2-2
DB-B1-LP1
DB-B1-LP2
DB-B1-LP3
DB-B1-LP4
DB-B1-CAF
DB-B1-KIT
UDB-B1-1
UDB-B1-2
DB-BR-L1
DB-BR-L2
DB-BR-L3
DB-BR-L4
DB-BR-L5
DB-BR-P1
DB-BR-P2
DB-BR-P3
DB-BR-P4
DB-BR-P5
DB-BR-STR
DB-BR-KIT
UDB-BR-1
UDB-BR-2
UDB-PD-1
UDB-PD-2
DB-PD-L1
DB-PD-L2
DB-PD-L3
DB-PD-L4
DB-PD-P1
DB-PD-P2
DB-PD-P3

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

11 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

12 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

DB-PD-P4
DB-PD-KIT1
DB-PD-KIT2
DB-PD-SHOP
UDB-LB-1
UDB-LB-2
DB-LB-KIT
DB-LB-L1
DB-LB-P1
DB-LB-P2
DB-LB-L2
UDB-1F-1
UDB-1F-2
DB-1F-COM-LP1
DB-1F-COM-LP2
UDB-2F-1
UDB-2F-2
DB-2F-COM-LP1
DB-2F-COM-LP2
UDB-3F-1
UDB-3F-2
DB-3F-COM-LP1
DB-3F-COM-LP2
UDB-4F-1
UDB-4F-2
DB-4F-COM-LP1
DB-4F-COM-LP2
UDB-5F-1
UDB-5F-2
DB-5F-COM-LP1
DB-5F-COM-LP2
UDB-6F-1
UDB-6F-2
DB-6F-COM-LP1
DB-6F-COM-LP2
UDB-7F-1
UDB-7F-2
DB-7F-COM-LP1
DB-7F-COM-LP2
UDB-8F-1
UDB-8F-2
DB-8F-COM-LP1
DB-8F-COM-LP2
UDB-9F-1
UDB-9F-2
DB-9F-COM-LP1

13 of 90

QTY

UNIT

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

14 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

aar

DESCRIPTION

QTY

UNIT

DB-9F-COM-LP2

No.

Distribution boards for kitchen, restaurants, laundry and


miscellaneous loads

No.

100
15
75
5
5
5

No.
No.
No.
No.
No.
No.

15
50
10
25
100

No.
No.
No.
No.
No.

30

Mtr.

30

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (3RD FLOOR)

30

Mtr.

100NG /4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (4TH FLOOR)

30

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (5TH FLOOR)

30

Mtr.

2
Wall mounted load break switches, metal clad with front drive
handle, protection category IP42 as under
a
b
c
d
e
f
3

a
b
c
d
e

3-pole 15 Amp, 440 volts


3-pole 30 Amp, 440 volts
3-pole 60 Amp, 440 volts
3-pole 100 Amp, 440 volts
3-pole 125 Amp, 440 volts
3-pole 160/200 Amp, 440 volts

Wall mounted load break switches, protection category IP 55


with non-metallic housing and front drive handle integral with
industrial socket outlet (TPN+E)
15 Amp, 230 volts
30 Amp, 230 volts
15 Amp, 440 volts
30 Amp, 440 volts
60 Amp, 440 volts
Total of Sec-D
Carried Forward to Summary

Sec-E

Cables
Supply, installation and connection of 600/1000V rating Power
Cables with cable glands, connections, terminations, fixings,
fittings as per drawings.

FOR - MSB1

a
100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From
Bus Duct 800A-63 ATP to Panel (1ST FLOOR)
b

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel

15 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

16 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
f

DESCRIPTION

QTY

UNIT

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (6th floor)

30

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (7TH FLOOR)

30

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (8TH FLOOR)

30

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (9TH FLOOR)

30

Mtr.

200NG / 4x1C 185mm2 Cu PVC/ XLPE + 2x70mm2 ECC


From Bus Duct 200ATP to 200A Bus (ROOF)

100

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev ((ROOF)

100

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev (ROOF)

100

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev (ROOF)

100

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev (ROOF)

100

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev (ROOF)

100

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 200A Bus to Cooing tower (ROOF)

150

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 200A Bus to Panel (ROOF)

100

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 200A Bus to (ROOF)

10

Mtr.

30NG / 4x1C 10mm2 Cu PVC/XLPE + 10mm2 ECC From Bus


Duct 150 Bus to Panel (LOBBY LEVEL)

150

Mtr.

17 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

18 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel(LOBBY LEVEL)

150

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel 2 MA (LOBBY LEVEL)

150

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel 2 MB (LOBBY LEVEL)

150

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to TVSS (LOBBY LEVEL)

50

Mtr.

50

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct DB 400A Bus to Panel Elev # 2 (LOBBY LEVEL)

40

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 400A Bus to Elev # 3 (LOBBY LEVEL)

150

Mtr.

150

Mtr.

10

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct OUP DA 400A Bus to Panel Elev # 1 (LOBBY
LEVEL)

aa

150G / 3x1C 95mm2 Cu PVC/ XLPE + 70mm2 ECC From


Main switch Board 1 3000 A Bus to 2DPA 150 A Bus (LOBBY
LEVEL)

ab
30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From A
BUS TO TVSS (POOL/DECK LEVEL)
ac

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

150

Mtr.

ad

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

150

Mtr.

ae

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

150

Mtr.

af

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

150

Mtr.

ag

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

150

Mtr.

150

Mtr.

ah
60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From
Bus Duct ODPA 400A Bus to Elev # 2 (POOL/DECK LEVEL)

19 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

20 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
ai

DESCRIPTION

QTY

UNIT

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 4 (POOL/DECK LEVEL)

150

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 12 (POOL/DECK LEVEL)

150

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 13 (POOL/DECK LEVEL)

150

Mtr.

200NG / 8x1C 240mm2 Cu 4x + 2x70mm2 ECC From Main


Switch Board 2 3000A Bus to 200A Bus (BALL ROOM LEVEL)

150

Mtr.

100

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


ODPC 200A Bus to Panel (BALL ROOM LEVEL)

100

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


ODPC 200A Bus to Panel (BALL ROOM LEVEL)

100

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


ODPC 200A Bus to Panel (BALL ROOM LEVEL)

100

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


ODPC 200A Bus to Panel (BALL ROOM LEVEL)

100

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC


(PC45) From ODPC 200A Bus to TVSS (BALL ROOM LEVEL)

100

Mtr.

3000NG / 18x1Core 500 sq.mm Al PVC/ XLPE + 2x120mm2


ECC From ATS 2 to Main Switch Board 1 3000A Bus
(BASEMENT & BOH LEVEL 1)

100

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 1 3000A Bus to 400 A Bus
(BASEMENT & LEVEL 1)

100

Mtr.

100

Mtr.

100

Mtr.

aj

ak

al

am

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC


(PC40) From ODPC 200A Bus to Panel OHE (BALL ROOM
LEVEL)

an

ao

ap

aq

ar

as

at

au

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC (PC45


C) From ODPC 200A Bus to UPS 25 KVA (BASEMENT & BOH
LEVEL 1)

av
60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From
200A Bus to Fire Pump Panel 2 (BASEMENT & BOH LEVEL 1)

21 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

22 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


(PC45 E) From Main Switch Board 1 3000A Bus to ODPA 400
A Bus (BASEMENT & BOH LEVEL 1)

100

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 1 3000A Bus to (BASEMENT & LEVEL 1)

100

Mtr.

100

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


(PC46) From Main Switch Board A 3000A Bus to 400 A Bus
(BASEMENT & LEVEL 1)

150

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


ODPC 200A Bus to Chiller (BALL ROOM LEVEL)

150

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


ODPC 200A Bus to Chiller (BALL ROOM LEVEL)

150

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


(PC49) From Main Switch Board 1 3000A Bus to Capacitor
Bank 2, 400A Bus (BASEMENT & BOH LEVEL 1)

150

Mtr.

150

Mtr.

150

Mtr.

100

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


400A to Panel (BASEMENT LEVEL 3)

100

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC


(PC59) From 400A to Panel (BASEMENT LEVEL 3)

100

Mtr.

100

Mtr.

aw

ax

ay

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC56 B)


From UPS 25KVA to OUPDA 400A Bus (BASEMENT & BOH
LEVEL 1)

az

aaa

aab

aac

aad

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 1 3000A Bus to TVSS (BALL ROOM
LEVEL)

aae
60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From
B2DPB 400A Bus to Panel BIHC (BASEMENT LEVEL 1)
aaf

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 1 3000A Bus to 400A Bus
(BASEMENT LEVEL 3)

aag

aah

aai

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC


(PC60) From BPPA 400A to Panel B3HB (BASEMENT LEVEL
3)

23 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

24 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
aaj

DESCRIPTION

QTY

UNIT

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC


(PC62) From 400A to Panel (BASEMENT LEVEL 5)

150

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


BPPA 400A to Panel 8(BASEMENT LEVEL 8)

150

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (FIRST FLOOR)

98

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (2ND FLOOR)

90

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (3RD FLOOR)

75

Mtr.

100NG /4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC (PC204)


From Bus Duct 800A-63 ATP to Panel 6GC (4TH FLOOR)

75

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (5TH FLOOR)

75

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (6TH FLOOR)

75

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (7TH FLOOR)

75

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35mm2 ECC From


Bus Duct 800A-63 ATP to Panel (8TH FLOOR)

75

Mtr.

100NG / 4x1C 70mm2 Cu-PVC/ XLPE + 35MM2 ECC (PC209)


From Bus Duct 800A-63 ATP to Panel 11GC (9TH FLOOR)

75

Mtr.

200NG / 4x1C 185mm2 Cu PVC/ XLPE + 2x70mm2 ECC


From Bus Duct 200ATP to 200A Bus (ROOF)

150

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev # 7 (ROOF)

150

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev # 8 (ROOF)

150

Mtr.

aak

aal
60NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From
BPPA 400A to (BASEMENT LEVEL 1)
2

FOR - MSB2

25 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

26 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
m

DESCRIPTION

QTY

UNIT

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev # 18 (ROOF)

156

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC (PC214)


From Bus Duct 12DPA 200A Bus to Elev # 19 (ROOF)

170

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 200A Bus to Elev # 20 (Roof)

148

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 200A Bus to Cooing tower (ROOF)

150

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 200A Bus to Panel 12 HB (ROOF)

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC218)


From Bus Duct 12DPA 200A Bus to TVSS (ROOF)

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/XLPE + 10mm2 ECC From Bus


Duct 150 Bus to Panel 2 HC (LOBBY LEVEL)

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel 2 HD (LOBBY LEVEL)

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC221)


From Bus Duct 2DPB 150 Bus to Panel 2 MC (LOBBY LEVEL)

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel 2 MD (LOBBY LEVEL)

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to TVSS (LOBBY LEVEL)

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC224)


From Bus Duct OUP DB 400A Bus to Panel 1UHD

75

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct OUP DB 400A Bus to Panel

150

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct 400A Bus to Elev # 11

150

Mtr.

150G / 3x1Core 95mm2 Cu PVC/ XLPE + 70mm2 ECC From


Bus Duct 400A Bus to Elev # 11 (Lobby Level)

90

Mtr.

150G / 3x1Core 95mm2 Cu PVC/ XLPE + 70mm2 ECC From


Main switch Board 2 3000 A Bus to Elev # 11 (Lobby Level)

75

Mtr.

aa

ab

27 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

28 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC227)


From BUS TO TVSS (POOL/DECK LEVEL)

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel 1HC (POOL/DECK LEVEL)

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel 1HD (POOL/DECK LEVEL)

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel 1KPA (POOL/DECK LEVEL)

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC230)


From 1DPB250A Bus to Panel 1KPB (POOL/DECK LEVEL)

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel 1MB (POOL/DECK LEVEL)

75

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct ODPB 400A Bus to Elev # 9 (POOL/DECK LEVEL)

90

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct ODPB 400A Bus to Elev # 10 (POOL/DECK LEVEL)

95

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct ODPB 400A Bus to Elev # 12 (POOL/DECK LEVEL)

80

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From Bus


Duct ODPB 400A Bus to Elev # 13 (POOL/DECK LEVEL)

80

Mtr.

150

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel OHE (BALL ROOM LEVEL)

90

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel OHF (BALL ROOM LEVEL)

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

ac

ad

ae

af

ag

ah

ai

aj

ak

al

am

200NG / 4x1C 185mm2 Cu PVC/ XLPE + 2x70mm2 ECC


From Main Switch Board 2 3000A Bus to 200A Bus (BALL
ROOM LEVEL)

an

ao

ap

29 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

30 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
aq

DESCRIPTION

QTY

UNIT

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel BP2 (BALL ROOM LEVEL)

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


ODPC 200A Bus to (BALL ROOM LEVEL)

75

Mtr.

3000NG / 18x1Core 500 sq.mm Al PVC/ XLPE + 2x120mm2


ECC From ATS 2 to Main Switch Board 2 3000A Bus
(BASEMENT & LEVEL 1)

75

Mtr.

400NG / 8x1C 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


(PC245 B) From Main Switch Board 2 3000A Bus to 400 A
Bus (BASEMENT & LEVEL 1)

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC (PC245


C) From 200A Bus to Panel (BASEMENT & LEVEL 1)

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Fire Pump Panel 2 (BASEMENT & LEVEL 1)

75

Mtr.

400NG / 8x1C 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400 A Bus
(BASEMENT & LEVEL 1)

75

Mtr.

95

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


UPS 15KVA to 400A Bus (BASEMENT & LEVEL 1)

85

Mtr.

400NG / 8x1C 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to ODPB 400 A Bus
(BASEMENT & BOH LEVEL 1)

85

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


ODPC 200A Bus to Chiller (BALL ROOM LEVEL)

95

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC248)


From ODPC 200A Bus to Chiller (BALL ROOM LEVEL)

95

Mtr.

ar

as

at

au

av

aw

ax

ay

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 2 3000A Bus to (BASEMENT & BOH
LEVEL 1)

az

aaa

aab

aac

31 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

32 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
aad

aae

DESCRIPTION

QTY

UNIT

400NG / 8x1C 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to Capacitor Bank 2,
400A Bus (BASEMENT & BOH LEVEL 1)

120

Mtr.

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


400A Bus to Panel BIHC (BASEMENT LEVEL 1)

75

Mtr.

400NG / 8x1C 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From 400A Bus to B2MB (BASEMENT LEVEL 2)

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


400A Bus to Panel (BASEMENT LEVEL 2)

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


400A Bus Panel B2HA (BASEMENT LEVEL 2)

75

Mtr.

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC (PC260)


From 400A Bus to (BASEMENT LEVEL 2)

75

Mtr.

100

Mtr.

150

Mtr.

30NG / 4x1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 2 3000A Bus to TVSS (BALL ROOM
LEVEL)

aaf

aag

aah

aai

aaj

aak

60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


400A Bus to (BASEMENT LEVEL 4)

aal
60NG / 4x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC From
400A Bus to B6HA (BASEMENT LEVEL 6)
aam

30NG/4x1C 10mm2 Cu PVC/XLPE + 1C 10mm2 ECC from


to TVS (BASEMENT LEVEL 1)

75

Mtr.

aan

30NG/4x1C 10mm2 Cu PVC/XLPE + 1C 10mm2 ECC


(PC260A) from B2DPA 400A to Panel B5H5 (BASEMENT
LEVEL 5)

220

Mtr.

320

Mtr.

300

Mtr.

475

Mtr.

aao
30NG/4x1C 10mm2 Cu PVC/XLPE + 1C 10mm2 ECC from
B2DPA 400A to Panel B8HA (BASEMENT LEVEL 8)
3

FOR - MSB 3

a
4x1C 10mm2 Cu XLPE + 35mm2 ECC (PC302) From 2400A
Bus to Isolator Switch for Cooling Tower 1 (PARTAIL ROOM)
b

18x1C 500 sq.mm Al XLPE + 2x1C 120mm2 ECC (PC301)


From ATS 3 to Main Switch Board 3 3000A Bus (BASEMENT &
BOH LEVEL 1)

33 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

34 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
c

DESCRIPTION

QTY

UNIT

75

Mtr.

4x1C 185mm2 Cu XLPE + 1x25mm2 ECC From Main Switch


Board 3 3000A Bus to 175A Bus MCC 4A Lifts (BASEMENT &
BOH LEVEL 1)

75

Mtr.

4x1C 35mm2 Cu XLPE + 16mm2 ECC From Main Switch


Board 3 3000A Bus to 80A Bus MCC 3A Kitchen (BASEMENT
& BOH LEVEL 1)

75

Mtr.

4x1C 240mm2 Cu XLPE + 2x70mm2 ECC From Main Switch


Board 3 3000A Bus to 250A Bus MCC 2A Plumbing Service
(BASEMENT LEVEL 8)

120

Mtr.

18x1C 500 sq.mm Al XLPE + 2x70mm2 ECC From Main


Switch Board 3 3000A Bus to 2400A Bus MCC 1A Central A/C
Plant Room (BASEMENT LEVEL 8)

120

Mtr.

450

Mtr.

4x1C 10mm2 Cu XLPE + 1C 10mm2 ECC From Isolator


Switch for Cooling Towers 2 & 3 to Cooling Tower 2 (PARTIAL
ROOF)

75

Mtr.

4x1C 10mm2 Cu XLPE + 1C 10mm2 ECC (PC404) From


Isolator Switch for Cooling Towers 2 & 3 to Cooling Tower 3
(PARTIAL ROOF)

75

Mtr.

18x1C 500 sq.mm Al XLPE + 2x1C 120mm2 ECC From ATS 4


to Main Switch Board 4 3000A Bus (BASEMENT & BOH
LEVEL 1)

75

Mtr.

4x1C 10mm2 Cu XLPE + 10mm2 ECC From IMain Switch


Board 4 3000A to 30A Bus MCC 5B External Lights
(BASEMENT & BOH LEVEL 1)

75

Mtr.

4x1C 185mm2 Cu XLPE + 70mm2 ECC From Main Switch


Board 4 3000A to 175A Bus MCC 4B Lifts (BASEMENT &
BOH LEVEL 1)

75

Mtr.

4x1C 35mm2 Cu XLPE + 1x25mm2 ECC (PC407) From Main


Switch Board 4 3000A to 80A Bus MCC 80 Kitchen
(BASEMENT & BOH LEVEL 1)

75

Mtr.

120

Mtr.

4x1C 10mm2 Cu XLPE + 1x10mm2 ECC (PC303) From Main


Switch Board 3 3000A Bus to 30A Bus MCC 5A External Lights
(BASEMENT & BOH LEVEL 1)
d

4
a

FOR - MSB 4
4x1C 95mm2 Cu XLPE + 2x1C 70mm2 ECC From 2400A
MCC - 1B Central Cooling A/C Plant Room to Isolator Switch
for Cooling Tower 2 & 3 (PARTIAL ROOF)

h
18x1C 500 sq.mm Al XLPE + 3x1C 300mm2 ECC From Main
Switch Board 4 3000A to 2400A Bus MCC 2B Central A/C
Plant Room (BASEMENT 8)

35 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

36 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
i

5
a

DESCRIPTION

QTY

UNIT

4x1C 240mm2 Cu XLPE + 2x70mm2 ECC From Main Switch


Board 4 3000A to 250A Bus MCC - 2B PLUMBING Services
(BASEMENT 8)

150

Mtr.

4x1C 10mm2 Cu XLPE + 10mm2 ECC From 1500A Bus Duct


to MCC 11 (For AHU) (BASEMENT 6)

420

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC 6 (For Parking Exhuast) (BASEMENT 5)

400

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC 12 (For AHU's) (BASEMENT 4)

250

Mtr.

4x1C 185mm2 Cu XLPE + 70mm2 ECC From 1500A Bus


Duct to MCC 7 (For Parking Exhuast) (BASEMENT 4)

275

Mtr.

4x1C 6mm2 Cu XLPE + 1x6mm2 ECC From 1500A Bus Duct


to MCC 13 (For AHU's) (BASEMENT 3)

290

Mtr.

4x1C 185mm2 Cu XLPE + 70mm2 ECC From 1500A Bus


Duct to MCC 8 (For Parking Exhuast) (BASEMENT 3)

320

Mtr.

4x1C 6mm2 Cu XLPE + 6mm2 ECC From 1500A Bus Duct to


MCC 14 (For AHU's) (BASEMENT 2)

320

Mtr.

4x1C 185mm2 Cu XLPE + 70mm2 ECC (PC509) From 1500A


Bus Duct to MCC 9 (For Parking Exhuast) (BASEMENT 2)

190

Mtr.

4x1C 70mm2 Cu XLPE + 35mm2 ECC (PC510) From 1500A


Bus Duct to MCC 15 (For AHU's) (BASEMENT & BHO)

75

Mtr.

4x1C 25mm2 Cu XLPE + 15mm2 ECC From 1500A Bus Duct


to MCC 5C (For External Lights) (BASEMENT & BHO)

75

Mtr.

4x1C 70mm2 Cu XLPE + 35mm2 ECC From 1500A Bus Duct


to MCC - 4C (For Lifts) (BASEMENT & BHO)

75

Mtr.

4x1C 95mm2 Cu XLPE + 70mm2 ECC From 1500A Bus Duct


to MCC - 3C (For Kitchen) (BASEMENT

90

Mtr.

4x1C 25mm2 Cu XLPE + 60mm2 ECC From 1500A Bus Duct


to MCC - 10 (For Parking Exhuast) (BASEMENT )

320

Mtr.

FOR - MSB5

37 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

38 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
n

DESCRIPTION

QTY

UNIT

4x1C 95mm2 Cu XLPE + 70mm2 ECC From 1500A Bus Duct


to MCC - 16 (For AHU's) (BALL ROOM)

200

Mtr.

4x1C 240mm2 Cu XLPE + 70mm2 ECC From 1500A Bus


Duct to MCC - 17 A (For AHU's) (POLL / DECK)

320

Mtr.

4x1C 10mm2 Cu XLPE + 10mm2 ECC (PC517) From 1500A


Bus Duct to MCC - 17 B (For MISC) (POLL / DECK)

75

Mtr.

4x1C 10mm2 Cu XLPE + 10mm2 ECC (PC517 A) From 1500A


Bus Duct to MCC - 17 B1 (For MISC)

300

Mtr.

4x1C 70mm2 Cu XLPE + 35mm2 ECC From 1500A Bus Duct


to MCC - 18 A (For AHU's) LOBBY

200

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 19 B (For AHU's) FIRST FLOOR

250

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 19 A (For AHU's) FIRST FLOOR

200

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 20 B (For AHU's) SECOND FLOOR

175

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 20 A (For AHU's) SECOND FLOOR

175

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 21 B (For AHU's) THIRD FLOOR

190

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 21 A (For AHU's) THIRD FLOOR

175

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 22 B (For AHU's) FORTH FLOOR

200

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 22 A (For AHU's) FORTH FLOOR

275

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 23 B(For AHU's) FIFTH FLOOR

250

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 23 A(For AHU's) FIFTH FLOOR

124

Mtr.

aa

ab

39 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

40 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 24 B (For AHU's) SIXTH FLOOR

200

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 24 A (For AHU's) SIXTH FLOOR

200

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 25 B (For AHU's) SEVENTH FLOOR

200

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 25 A (For AHU's) SEVENTH FLOOR

145

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 26 B (For AHU's) EIGHT FLOOR

145

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 26 A (For AHU's) EIGHT FLOOR

250

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 27 B (For AHU's) NINTH FLOOR

250

Mtr.

4x1C 16mm2 Cu XLPE + 16mm2 ECC From 1500A Bus Duct


to MCC - 27 A (For AHU's) NINTH FLOOR

250

Mtr.

75

Mtr.

3x1C-120Sqmm AL-PVC/XLPE nonarmoured + 2x1C-70Sq


mm ECC from OU/-1 to Trans Room / Trans # 2

75

Mtr.

Panel
Room.
3x1C-120Sq
mm
AL-PVC/XLPE
nonarmoured+2x1C-70Sq mm ECC from Meter H.T PANEL
ROOM11 K V O/U-2 TRANS ROOM TRANS#1 C/T

75

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm ECC TRANS ROOM TRANS#1 ELCETRICAL ROOM
ATS-1 MSB-1

75

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm ECCTRANS ROOM TRANS#2 ELECTRICAL ROOM ATS2 MSB-2

75

Mtr.

75

Mtr.

ac

ad

ae

af

ag

ah

ai

aj

FOR - FEEDER # 1

3x1C-AL-120Sqmm / PVCXLPE nonarmoured + ECC2x1C70Sq mm ECC from Meter Room to H.T. 11 KV Panel Room
Panel

f
22x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq
mm
ECC
GENERATOR ROOM GENERATOR# 1
GEN.CONTROL ROOM SYNCHRONIZATION PANEL

41 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

42 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR ROOM GENERATOR# 2
GEN.CONTROL ROOM SYNCHRONIZATION PANEL

75

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
ROOM
GENERATOR#6
GEN.CONTROL ROOM SYNCHRONIZATION PANEL

90

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
GEN.ROOM/GENERATOR#5

90

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
GEN.ROOM/GENERATOR#4

90

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured + 2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
GEN.ROOM/GENERATOR#3

90

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
MSB-5/ATS-5
E.ROOM

200

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
MSB-4/ATS-4
E.ROOM

200

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
MSB-3/ATS-3
E.ROOM

200

Mtr.

3C-10 sq.mm PVC/PVC +1C-10 sq.mm ECC GEN.CONTROL


ROOM SYNCHRONIZATION PANEL E.ROOM FIRE PUMP
ROOM/FIRE PUMP#1

200

Mtr.

3C-10 sq.mm PVC/PVC +1C-10 sq.mm ECC GEN.CONTROL


ROOM SYNCHRONIZATION PANEL E.ROOM FIRE PUMP
ROOM/FIRE PUMP#2

320

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
MSB-1/ATS-1
E.ROOM

75

Mtr.

18x1C-500Sqmm AL-PVC/PVC nonarmoured +2x1C-70 Sq


mm
ECC
GENERATOR
CONTROL
ROOM
SYNCHRONIZATION
PANEL
E.ROOM
MSB-2/ATS-2
E.ROOM

75

Mtr.

FEEDER#2

43 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

44 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
a

DESCRIPTION

QTY

UNIT

3X1C-120 sq.mm AL-XLPE NONARMOURED+2 X1C-70


sq.mm ECC METER ROOM "M" H.T 11 K.V PANEL ROOM
1C/-2

75

Mtr.

3X1C-120 sq.mm AL-XLPE NONARMOURED+2 X1C-70


sq.mm ECC H.T 11 K.V PANEL ROOM O/U-3
TRANS.ROOM/TRANS#3

75

Mtr.

3X1C-120 sq.mm AL-XLPE NONARMOURED+2 X1C-70


sq.mm ECC H.T 11 K.V PANEL ROOM O/U-4
TRANS.ROOM/TRANS#4

75

Mtr.

3X1C-120 sq.mm AL-XLPE NONARMOURED+2 X1C-70


sq.mm ECC H.T 11 K.V PANEL ROOM O/U-5
TRANS.ROOM/TRANS#5

75

Mtr.

18X1C-500 sq.mm AL-PVC/PVC NONARMOURED+2X1C-70


sq.mm ECC TRANS ROOM TRANS#5 TRANS ROOM MSB5/ATS-5 E.ROOM

75

Mtr.

18X1C-500 sq.mm AL-PVC/PVC NONARMOURED+2X1C-70


sq.mm ECC TRANS ROOM TRANS#4 TRANS ROOM MSB4/ATS-4 E.ROOM

75

Mtr.

18X1C-500 sq.mm AL-PVC/PVC NONARMOURED+2X1C-70


sq.mm ECC TRANS ROOM TRANS#3 TRANS ROOM MSB3/ATS-3 E.ROOM

75

Mtr.

18X1C-500 sq.mm AL-PVC/PVC NONARMOURED + 2X1C-70


sq.mm
ECC
GEN.ROOM,
GEN#3,
GEN.ROOM
GEN.CONTROL ROOM ,SYNCHRONIZATION PANEL

250

Mtr.

18X1C-500 sq.mm AL-PVC/PVC NONARMOURED + 2X1C-70


sq.mm
ECC
GEN.ROOM,
GEN#4,
GEN.ROOM
GEN.CONTROL ROOM, SYNCHRONIZTION PANEL

90

Mtr.

18X1C-500 sq.mm AL-PVC/PVC NONARMOURED + 2X1C-70


sq.mm
ECC
GEN.ROOM,
GEN#5,
GEN.ROOM
GEN.CONTROL ROOM, SYNCHRONIZTION PANEL

95

Mtr.

3C-10 sq.mm AL-PVC/PVC NONARWOURED+1C-10 sq.mm


FIRE PUMP ROOM,FIRE PUMP#2 MSB-4 E.ROOM

95

Mtr.

3C-10 sq.mm AL-PVC/PVC NONARWOURED+1C-10 sq.mm


FIRE PUMP ROOM,FIRE PUMP#1 MSB-3 E.ROOM

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

75

Mtr.

45 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

46 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
o

DESCRIPTION

QTY

UNIT

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

75

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 9 (POOL/DECK LEVEL)

75

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 10 (POOL/DECK LEVEL)

90

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 12 (POOL/DECK LEVEL)

90

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 13 (POOL/DECK LEVEL)

90

Mtr.

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC


(PC242) From 200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

75

Mtr.

75

Mtr.

200NG / 4x1Core 185mm2 Cu PVC/ XLPE + 2x70mm2 ECC


From Main Switch Board 2 3000A Bus to 200A Bus (BALL
ROOM LEVEL)

aa

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC


(PC245) From ODPC 200A Bus to TVSS (BALL ROOM
LEVEL)

ab
3000NG / 18x1Core 500 sq.mm Al PVC/ XLPE + 2x120mm2
ECC From ATS 2 to Main Switch Board 2 3000A Bus
(BASEMENT & BOH LEVEL 1)

47 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

48 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
ac

DESCRIPTION

QTY

UNIT

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400 A Bus
(BASEMENT & BOH LEVEL 1)

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BASEMENT & BOH LEVEL 1)

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Fire Pump Panel 2 (BASEMENT & BOH LEVEL 1)

75

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400 A Bus
(BASEMENT & BOH LEVEL 1)

75

Mtr.

75

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


UPS 15KVA to 400A Bus (BASEMENT & LEVEL 1)

75

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


(PC245 B) From Main Switch Board 2 3000A Bus to ODPB
400 A Bus (BASEMENT & BOH LEVEL 1)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


200A Bus to Chiller (BALL ROOM LEVEL)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


200A Bus to Chiller (BALL ROOM LEVEL)

90

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to Capacitor Bank 2,
400A Bus (BASEMENT & LEVEL 1)

90

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 2 3000A Bus to (BALL ROOM LEVEL)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


400A Bus to Panel BIHC (BASEMENT LEVEL 1)

90

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400A Bus
(BASEMENT LEVEL 2)

90

Mtr.

ad

ae

af

ag

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 2 3000A Bus to TVSS (BASEMENT &
BOH LEVEL 1)

ah

ai

aj

ak

al

am

an

ao

49 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

50 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
ap

aq

ar

as

at

8
a

DESCRIPTION

QTY

UNIT

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
2)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
2)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
2)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
4)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
8)

90

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (1st floor)

75

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


(PC2) From Bus Duct 800A-63 ATP to Panel (2nd floor)

75

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (3rd floor)

75

Mtr.

100NG /4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (4th floor)

75

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (5th floor)

75

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (6th floor)

75

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (7th floor)

90

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (8th floor)

90

Mtr.

100NG / 4x1Core 70mm2 Cu-PVC/ XLPE + 10mm2 ECC


From Bus Duct 800A-63 ATP to Panel (9th floor)

90

Mtr.

FOR - MSB1

51 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

52 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
j

DESCRIPTION

QTY

UNIT

200NG / 4x1Core 185mm2 Cu PVC/ XLPE + 2x70mm2 ECC


From Bus Duct 200ATP to 200A Bus (Roof)

90

Mtr.

60G / 3x1C 25mm2 Cu PVC/ XLPE + 16mm2 ECC (PC11)


From Bus Duct 200A Bus to Elev # 21 (Roof)

90

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 12DPA 200A Bus to Elev # 3 (Roof)

90

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 200A Bus to Elev # 15 (Roof)

90

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC (PC14)


From Bus Duct 200A Bus to Elev # 16 (Roof)

90

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC (PC15)


From Bus Duct 200A Bus to Elev # 17 (Roof)

90

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC


(PC16) From Bus Duct 200A Bus to Cooing tower (Roof)

250

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 200A Bus to Panel (Roof)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 200A Bus to (Roof)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel (Lobby Level)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel (Lobby Level)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel (Lobby Level)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to Panel (Lobby Level)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 150 Bus to TVSS (Lobby Level)

75

Mtr.

53 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

54 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 400A Bus to Panel Elev # 1 (Lobby Level)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus Duct 400A Bus to Panel Elev # 2 (Lobby Level)

75

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct ODPB 400A Bus to Elev # 3 (Lobby Level)

200

Mtr.

150G / 3x1Core 95mm2 Cu PVC/ XLPE + 70mm2 ECC From


Main switch Board 1 3000 A Bus to 2DPA 150 A Bus (Lobby
Level)

120

Mtr.

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From A


BUS TO (POOL/DECK LEVEL)

75

Mtr.

90

Mtr.

aa

ab

ac
30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC (PC28)
From Bus to Panel (POOL/DECK LEVEL)
ad

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

90

Mtr.

ae

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

90

Mtr.

af

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

90

Mtr.

ag

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Bus to Panel (POOL/DECK LEVEL)

90

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 2 (POOL/DECK LEVEL)

110

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 4 (POOL/DECK LEVEL)

110

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 12 (POOL/DECK LEVEL)

110

Mtr.

60G / 3x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Bus Duct 400A Bus to Elev # 13 (POOL/DECK LEVEL)

110

Mtr.

75

Mtr.

ah

ai

aj

ak

al

200NG / 4x1Core 185mm2 Cu PVC/ XLPE + 2x70mm2 ECC


From Main Switch Board 2 3000A Bus to 200A Bus (BALL
ROOM LEVEL)

55 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

56 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
am

DESCRIPTION

QTY

UNIT

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


ODPC 200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel BP2 (BALL ROOM LEVEL)

75

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BALL ROOM LEVEL)

75

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


200A Bus to (BALL ROOM LEVEL)

90

Mtr.

3000NG / 18x1Core 500 sq.mm Al PVC/ XLPE + 2x120mm2


ECC From ATS 2 to Main Switch Board 2 3000A Bus
(BASEMENT & BOH LEVEL 1)

90

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400 A Bus
(BASEMENT & LEVEL 1)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Panel (BASEMENT & BOH LEVEL 1)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


200A Bus to Fire Pump Panel 2 (BASEMENT & BOH LEVEL 1)

90

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400 A Bus
(BASEMENT & BOH LEVEL 1)

90

Mtr.

90

Mtr.

90

Mtr.

an

ao

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC


(PC242) From ODPC 200A Bus to Panel (BALL ROOM
LEVEL)

ap

aq

ar

as

at

au

av

aw

ax

30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 2 3000A Bus to (BASEMENT & BOH
LEVEL 1)

ay
30NG / 4X1C 10mm2 Cu PVC/ XLPE + 10mm2 ECC ) From
UPS 15KVA to 400A Bus (BASEMENT & BOH LEVEL 1)

57 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

58 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
az

DESCRIPTION

QTY

UNIT

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400 A Bus
(BASEMENT & LEVEL 1)

90

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


200A Bus to Chiller (BALL ROOM LEVEL)

90

Mtr.

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


200A Bus to Chiller (BALL ROOM LEVEL)

90

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to Capacitor Bank 2,
400A Bus (BASEMENT & BOH LEVEL 1)

90

Mtr.

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


400A Bus to Panel (BASEMENT LEVEL 1)

90

Mtr.

400NG / 8x1Core 120mm2 Cu PVC/ XLPE + 1x120mm2 ECC


From Main Switch Board 2 3000A Bus to 400A Bus
(BASEMENT LEVEL 2)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
2)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
2)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
2)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
4)

90

Mtr.

60NG / 4x1Core 25mm2 Cu PVC/ XLPE + 16mm2 ECC From


Main Switch Board 2 3000A Bus to Panel (BASEMENT LEVEL
8)

90

Mtr.

aaa

aab

aac

aad

30NG / 4x1Core 10mm2 Cu PVC/ XLPE + 10mm2 ECC From


Main Switch Board 2 3000A Bus to TVSS (BALL ROOM
LEVEL)

aae

aaf

aag

aah

aai

aaj

aak

Total of Sec-E
Carried Forward to Summary
Sec-F

Cable Trays & Trunking

59 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

60 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
1

DESCRIPTION

QTY

UNIT

Supply and installation including supports, earthing, brackets,


joints, connections, fixings, fittings and the like; complete as
shown on drawings and as per specifications (Cable
trays/ladders in areas without suspended ceiling shall be woth
covers.
a

900x100mm wide cable Ladder

1,500

Mtr.

600x100mm wide cable Tray

1,000

Mtr.

450x75mm wide cable Tray

800

Mtr.

300x75mm wide cable Tray

1,500

Mtr.

250x75mm wide cable Tray

450

Mtr.

200x75mm wide cable Tray

500

Mtr.

150x75mm wide cable Tray

1,500

Mtr.

100x75mm wide cable Tray

400

Mtr.

2,250

Mtr.

500

Mtr.

1,000

Mtr.

12

No.

i
100x50mm wide cable trunking single compartment
j

75x50mm wide cable trunking single compartment

200x100mm wide cable trunking with two compartment for low


currrent system
Manholes / Handholes

2
Construction of Manhole including Excavation upto the
required depth, including all civil masonry work, cover and the
like; complete as shown on drawings and as per specifications
to the entire satisfaction of the Engineer.
a

Manhole (900mm x 900mm x 1000mm deep) with RCC cover

Manhole (900mm x 900mm x 1000mm deep) with heavy duty


C.I. cover

12

No.

Manhole (1200mm x 1200mm x 1200mm deep) with heavy


duty C.I. cover

12

No.

Handhole (450mm x 450mm x 600mm deep) with medium duty


C.I. cover

12

No.

M.S / G.I Conduits

a
b
c

25mm dia M.S. conduit


32mm dia M.S. conduit
38mm dia M.S. conduit

14,000
10,000
6,000

Mtr.
Mtr.
Mtr.

61 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

62 of 90

Sheraton Hotel Islamabad - Electrical Works


DESCRIPTION

QTY

UNIT

50mm dia M.S. conduit

1,000

Mtr.

a
b
c
d

25mm dia G.I. Conduit


32mm dia G.I. Conduit
38mm dia G.I. Conduit
50mm dia G.I. Conduit

400
400
300
400

Mtr.
Mtr.
Mtr.
Mtr.

uPVC Pipes

a
b
c
d
e

25mm dia.
38mm dia.
50mm dia.
75mm dia.
100mm dia.

15,000
15,000
5,000
1,000
1,000

Mtr.
Mtr.
Mtr.
Mtr.
Mtr.

RCC Pipes

a
b

200mm dia.
300mm dia.

2,000
1,000

Mtr.
Mtr.

820
2700
650

No.
No.
No.

ITEM
No.
d

Total of Sec-F
Carried Forward to Summary
Sec-G
1

a
b
c
2

Light, Power Circuit & Point Wiring


Wiring of light circuits from DB to switch / first point with 2.5
sq.mm, 1 core wire (having insulation with maximum
temperature of 95 deg C) including ECC in embedded PVC
conduit. (In mechanical and technical rooms wiring will be in
surface mounted steel conduits)
Basement levels
Lobby levels
Guest room levels

Wiring from switch to light point and point to point with 2.5
sq.mm, 1 core wire (having insulation with maximum
temperature of 95 deg C) including ECC in embedded PVC
conduit. ( In mechanical and technical rooms wiring will be in
surface mounted steel conduits)

a
b
c

Basement levels
Lobby levels
Guest room levels

3000
11000
900

No.
No.
No.

Wiring of light points in Guest Rooms with 2.5 sq.mm MC


cables installed in partitions/ceiling voids including earth
conductor

12900

No.

75
220
1200

No.
No.
No.

a
b
c

Wiring of socket outlets from DB to first point with 4 sq.mm, 1


core wire (having insulation with maximum temperature of 95
deg C) including ECC in embedded PVC conduit. ( In
mechanical and technical rooms wiring will be in surface
mounted steel conduits)
Basement levels
Lobby levels
Guest room levels

63 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

64 of 90

Sheraton Hotel Islamabad - Electrical Works


DESCRIPTION

QTY

UNIT

Wiring of socket outlets from point and point to point with 4


sq.mm, 1 core wire (having insulation with maximum
temperature of 95 deg C) including ECC in embedded PVC
conduit.( In mechanical and technical rooms wiring will be in
surface mounted steel conduits)
Basement levels
Lobby levels
Guest room levels
External Area

500
1100
250
250

No.
No.
No.
No.

9200

No.

1,350

No.

300
2,200
6,200

No.
No.
No.

230 VAC Dimmer Switch


Basement Levels
Lobby Levels
Guest Room Levels (Floors)

73
0

No.
No.
No.

230 VAC Thermal Overload Switch


Basement Levels
Lobby Levels
Guest Room Levels (Floors)

700
0
0

No.
No.
No.

560

No.

e
f
g

INNCOM Inntouch Guest notification device


switch
S217NLwith occupancy sensor E
INNCOM s-series
e4 smartnight
digital
thermostat
528
Wiring for INNCOM devices

Master switch

560

No.

Sockets

230 VAC Duplex Receptacle


Basement Levels

189

No.

ITEM
No.
5

a
b
c
d
8

Wiring of socket outlets in Guest Rooms with 4sq.mm. MC


cables installed in partitions/ceiling voids including earth
conductor

9
Wiring of emergency light / Exit light in Lobby Levels, Deck and
basment levels with with 2.5sq.mm. MC cables installed in
partitions/ceiling voids including earth conductor
Total of Sec-G
Carried Forward to Summary
Sec-H
1

Switches, Sockets & outlets


Supply and installation following switches, sockets outlets fixed
on wall inlcuding back box, complete as shown on drawings
and as per specifications.
220V single pole 20 amp switch (Rocker type)
Basement Levels
Lobby Levels
Guest Room Levels (Floors)

INNCOM energy management devices for guest rooms as


below (Items d to g)
d

65 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

66 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

Lobby Levels
Guest Room Levels (Floors)

1350
8,000

No.
No.

230 VAC Duplex Receptacle, ground fault interrupter.


Basement Levels
Lobby Levels
Guest Room Levels (Floors)

0
450
1,680

No.
No.
No.

Duplex Receptacle Ground Fault Weather Proof


Basement Levels
Lobby Levels
Guest Room Levels (Floors)
External Area

500
0
0
250

No.
No.
No.
No.

Duplex Receptacle
Basement Levels
Lobby Levels
Guest Room Levels (Floors)

200
300
550

No.
No.
No.

Total of Sec-H
Carried Forward to Summary
Sec-J

Light Fixtures

Supply, installation, testing and commissioning of the following


type light fittings including tubes, lamps, brackets, ballasts,
accessories, etc., complete as per drawings and specifications.

Type AB

1,500

No.

Type AC

772

No.

Type AD

794

No.

Type AE

129

No.

Type AF

232

No.

Type AG

813

No.

Type BA

80

No.

Type BC

2,534

No.

Type BD

778

No.

Type BE

1,180

No.

Type BF

214

No.

Type CF

211

No.

Type CN

225

No.

Type CO

240

No.

67 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

68 of 90

Sheraton Hotel Islamabad - Electrical Works


DESCRIPTION

QTY

UNIT

Type CP

225

No.

Type CQ

4,614

No.

Type GA

5,154

No.

Type GB

2,754

No.

Type GC

1,262

No.

Type GD

1,513

No.

Type GE

1,851

No

Type SA

100

No

Type SB

100

No

Pool Lights

No

Emergency Lights

EXIT light, ceiling/wall mounted with LEDs, selectable option


for maintained/non-maintained, with nickle cadmium batteries
for 3-hours stand-by operation.

100

No.

Emergency conversion kit Menvier QBX or equivalent for 3hours back up as additional to light fixtures specified above, to
be provided integral with light fixtures

1,200

No

No.

18

No.

PHOTOELECTRIC TYPE SMOKE SENSOR S-QUAD SERIES


700 MODEL: 15, MAKE: GENT BY HONEYWELL

900

No.

FIXED/ROR TYPE HEAT SENSOR S-QUAD SERIES 700


MODEL: 20, MAKE: GENT BY HONEYWELL

1050

No.

ITEM
No.

Total of Sec-J
Carried Forward to Summary
Sec-K
1

Fire Alarm & Voice Evacuation System


Supply, installation, testing and commissioning including wiring,
conduits, trays, connections, terminations, fixings, fittings and
the like; complete as shown on drawings and as per
specifications.

a
06 LOOP ADDRESSABLE VIGILON FIRE ALARM CONTROL
PANEL MODEL: 72, MAKE: GENT BY HONEYWELL
b

VIGILON FIRE ALARM ANNUNCIATOR PANEL MODEL: RPT,


MAKE: GENT BY HONEYWELL

69 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

70 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
e

DESCRIPTION

QTY

UNIT

30

No.

DUAL OPTICAL / HEAT MULTISENSOR S-QUAD SERIES


700 MODEL:11, MAKE: GENT BY HONEYWELL

15

No.

DUAL OPTICAL / HEAT MULTISENSOR / SOUNDER S-QUAD


SERIES 700 MODEL: 71, MAKE: GENT BY HONEYWELL

560

No.

SUPPLY & INSTALLATION OF DUAL OPTICAL / HEAT / CO


MULTISENSOR S-QUAD SERIES 900 MODEL: 11, MAKE:
GENT BY HONEYWELL

125

No.

ADDRESSABLE MANUAL CALL POINT WITH BREAK


GLASS TYPE MODEL: 34 SERIES, MAKE: GENT BY
HONEYWELL

100

No.

ADDRESSABLE ELECTRONIC STROBE WEATHER PROOF


S-CUBED DEVICES MODEL: S2IP, MAKE: GENT BY
HONEYWELL

50

No.

ADDRESSABLE ELECTRONIC SOUNDER WITH FLASHER


S-CUBED DEVICES MODEL: S3, MAKE: GENT BY
HONEYWELL

700

No.

30

No.

INPUT MODULE SERIES 34 MODEL: 10, MAKE: GENT BY


HONEYWELL

30

No.

PROVISION FOR INTERCONNECTION OF FIRE ALARM


SYSTEM WITH THE BUILDING MANAGEMENT SYSTEM
(BMS)
INCLUDING
DEVICES,
SOFTWARE
IN
ACCORDANCE WITH THE REQUIREMENTS OF BMS
SUPPLIER

Job.

2 x 1.5mm FIRE RESISTANT CABLE MODEL: AFR, MAKE:


FIRECEL

35000

Mtr.

BEAM SENSOR WITH ACCESSORIES MODEL: 34 SERIES,


MAKE: GENT BY HONEYWELL

l
INPUT/OUTPUT MODULE FOR INTERFACING DEVICES
SERIES 34 MODEL: 20, MAKE: GENT BY HONEYWELL
m

2
Supply, installation, testing and commissioning of Voice
Evacuation System including wiring, conduits, trays,
connections, terminations, fixings, fittings and the like;
complete as shown on drawings and as per specifications.
a

6W Voice Evacuation Speaker ceiling mounted.

600

No.

400W distribution panel.

24

No.

Microphone.

No.

Music Source.

No.

71 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

72 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
e

DESCRIPTION

QTY

UNIT

Emergency Microphone.

No.

Master panel for voice evacuation system including provisions


to interface with fire alarm system, programming zone-wise for
activation of messages as per evacuation plan.

No.

Wiring for voice evacuation system in appropriate size of pvc


conduit with all connecting accessories,complete in all respect.

Job

1,500

Mtr.

No.

No.

200,000

Mtr.

Total of Sec-K
Carried forward to Summary
Sec-L

Telephone/Data System

1
Supply, installation, testing and commissioning
including
wiring, conduits, connections, terminations, fixings, fittings and
the like, complete as shown on drawings and as per
specifications and to make the system completely operational.
a

Main PTCL Incoming Cable 300 pair in 100mm dia PVC


conduit.

Main distribution
accessories.

PTCL termination panel

4pair cat-6 UTP cable

Telephone outlet

2,375

No.

LAN outlet

2,375

No.

2 x 50 pair cat-6 cable from telephone exchange to each guest


room floors.

1,000

Mtr.

1 x 50 pair cat-6 cable from telephone exchange to pool deck,


lobby and ball room levels.

300

Mtr.

1 x 50 pair cat-6 cable cable from telephone exchange to


basement levels (all outlets in basement to be connected with
this cable).

300

Mtr.

Copper Patch Panels (48 Ports)

30

No.

Copper Patch Panels (48 Ports)

30

No.

Fiber Patch Panels (12 Ports)

15

No.

Telephone Junction Box

10

Item

frame

complete

with

terminals

73 of 90

and

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

74 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
n

DESCRIPTION

QTY

UNIT

1 x 8 stand multimode Fiber Optic Cable from Data Centre,


terminated through each guest room floors.

300

Mtr.

1 x 8 stand multimode Fiber Optic Cable from Data Centre, at


lobby level, pool deck and ball room levels.

300

Mtr.

For Guest Room floors with 3x24 port patch panels for
telephone, 3x24 port patch panel for data through termination
for fiber cable and for incoming telephone cable.

15

Set.

For lobby level, pool deck and ball room with 3x24port patch
panels for data, through termination of fiber cable and for
incoming telephone cable.

Set.

Voice & data cabinets comprising of:

p
a)

b)

a
b

PABX System
Base system with cabinet and allied accessories

CPU duplication in hot standby mode for mission ciritical sites.


Power supply duplication in hot standby mode for mission
ciritical sites.

600 guest room user license to connect digital terminals.

450 guest room bathroom user license to connect analog


terminals.

10 service user licenses to connect IP touch screen phones for


better guest service.

50 administrative user license to connect executive digital


phones.

h
100 administrative user license to connect analogue phones
and/or fax, modems,etc, with built-in CLI feature.
i

4 Public PRI lines.

16 public analogue trunks.

25 public SIP trunks (IP based).

10 MY IC touch screen phones.

600 digital 4019 telephone sets for guest rooms.

50 digital 4029 telephone sets for executives.

75 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

76 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

450 bathroom sets for guests.

100 analogue phones for Administrative users.

q
Hpspitality package, it includes:
-VIP costumer tragging.
-Guest credit limit.
-Multi-language
-Voice Mail.
-Mini Bar.
-Room Status.
-DND.
-Wake-up
r

Hotel console option.

Hotel printer option.

04 IP based operator console PC based.

Voice mail system.

Set of Voice guides in Multi-languages (02).

Internal music on hold.

6-user conference access using internal and/or external


extensions.

Centralized phonebook for 6000 Entries (internal & external


numbers).

Battery Backup for 2 hours autonomy.

aa

MDF with system side and building side tag block (as per
requirement).

ab

System to MDF cable 5 meters.

ac

01 year warranty with parts and for other OEM items it will be
as per manufacturer's policy.

ad

Installation & commissioning of the above supplied equipment.


It does not include any electrical, telephone or Data networking
or cabling etc.
Total of Sec-L
Carried Forward to Summary

Sec-M

SMATV System

1
Supply, installation, testing and commissioning including wiring,
conduits, connections, terminations, fixing, fittings and the like
complete as shown on drawings and as per specifications,

77 of 90

QTY

UNIT

Job

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

78 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

SMATV Outlet

2,000

No.

MATV Junction Box

25

No.

Various sizes of Splitters

Lot.

RG-11 coaxial cable run in 25mm dia PVC conduit from head
end to guest room floors etc, complete in all respect.

125,000

Mtr.

TV cable head end equipment and cable and conduit from


cable supplier to ensure complete operation if the system.

Job.

1/3" format. Day/night with DNR, 600TVL resolution, 2.8-12mm


varifocal auto-iris lens, 0.1/0.04lux, 12VDC/24VAC PAL WITH
12VDC POWER SUPPLY AND COMPLETE MOUNTING
ACCESSORIES

42

No.

Wide Dynamic Range camera, 1/3" format, day/night with


DNR, 650TVL resolution, 12VDC/24VAC, PAL WITH
COMPLETE MOUNTING ACCESSORIES

80

No.

1/3 inch, auto-iris 2.8-12.0mm, f1.3, IR pass optics, CS mount,


direct drive

80

No.

10

No.

25

No.

10

No.

12

No.

Total of Sec-M
Carried forward to Summary
Sec-N
1

CCTV System
Supply, installation, testing and commissioning
including
wiring, conduits, connections, terminations, fixings, fittings and
the like; complete as shown on drawings and as per
specifications.

Compact housing with spring-hinged cover, IP65, weight 1.4Kg

e
5 compact dome system includes variable speed drive,
housing, integral day/night camera/lens module with wide
dynamic range and image stabilisation and 35x optical zoom,
lower dome and 24VAC power supply, PENDANT MOUNT
OUTDOOR DOME CAMERA. Automatic or manual switching
of day/night colour/mono on camera for low light conditions
f

Outdoor bullet camera, 1/3" format Day/Night camera, 560TVL


resolution, 2.8-12mm varifocal autoiris lens, 12VDC/24VAC,
PAL. WITH POWER SUPPLY

g
H.264 Digital Recorder, 16 channel, DVD drive and 1TB hard
drive with VGA output. Supplied with network viewing software.
Includes remote controller. PAL/NTSC

79 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

80 of 90

Sheraton Hotel Islamabad - Electrical Works


QTY

UNIT

No.

Desk-top intelligent keypad with built-in joystick. Provides


complete switching and control functions for variable and fixed
speed camera stations WITH TWIST LENS ZOOM FEATURE

No.

42" LCD MONITOR

No.

19" LCD MONITOR WITH VGA INPUT

12

No.

RACK FOR CCTV SYSTEM

No.

WOODEN CONSOLE FOR THE CCTV ROOM

No.

Network switch, 16-channel LAN connections, 10/100/1000


auto-sensing ports

No.

signal cable RG-6coaxial cable from Head End to each


camerarun in 1" dia UPVC conduit

45,000

Mtr.

PROVISION FOR INTERCONNECTION OF CCTV SYSTEM


WITH THE BUILDING MANAGEMENT SYSTEM (BMS)
INCLUDING DEVICES, SOFTWARE IN ACCORDANCE WITH
THE REQUIREMENTS OF BMS SUPPLIER

Job

signal cable 1.5sqmm POWER cable from Head End to each


camerarun in 1" dia UPVC conduit

45,000

Mtr.

600

No.

ITEM
No.
h

DESCRIPTION

Advanced digital control and matrix switching system with


internal CPU for systems with minimum 64 inputs and 8
outputs to maximum 128 inputs and 8 outputs. With extensive
tour-sequence support and comprehensive titling. Control data
transmission via either coaxial cable or twisted pair or a
combination of both. GUI interface for system configuration
i

Total of Sec-N
Carried Forward to Summary
Sec-O

Hotel Locking System

1
Supply, installation, testing and commissioning VingCard
make hotel guest room door locks with following features:
-Radio frequency card
-Neumerical Keypad
-Door Key
-Backup battery system
Total of Sec-O
Carried forward to Summary
Sec-P

Public Address / Back-Ground Music System

81 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

82 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.
1

DESCRIPTION

QTY

UNIT

No.

850

No.

Supply, installation, testing and commissioning including


wiring, conduits, connections, terminations, fixings, fittings and
the like; complete as shown on drawings and as per
specifications and to make the system completely operational.
a

240W SYSTEM MANAGEMENT AMPLIFIER WITH 5 ZONE


SELECTION OPTION WITH VOICE ANNOUNCEMENT
BOARD

6W CEILING SPEAKER
TRANSFORMER

30W WALL MOUNTED BOX SPEAKER BUILTIN MATCHING


TRANSFORMER

28

No.

6W VOLUME CONTROLLER

15

No.

60W VOLUME CONTROLLER

15

No.

100W VOLUME CONTROLLER

15

No.

30W WALL MOUNTED BOX SPEAKER BUILTIN MATCHING


TRANSFORMER WITH IP65 RATING

20

No.

No.

WITH

BUILTIN

MATCHING

REMOTE MICROPHONE WITH ZONE SELECTION OPTION

DESKTOP PAGING MICROPHONE

No.

240W POWER AMPLIFIER

30

No.

No.

Lot.

Supply & Installation of signal cable NETWORK CABLES from


Head End to each REMOTE MICROPHONE in 1" dia UPVC
conduit as per drawing &specification complete in all respect

455

Mtr.

Supply & Installation of signal cable 1.5sqmm SPEAKER cable


from Head End to each camerarun in 1" dia UPVC conduit as
per drawing &specification complete in all respect

30000

Mtr.

425

Mtr.

RACK FOR THE SUPPLIED PUBLIC ADDRESS SYSTEM


INTERCONNECT CABLES CONNECTORS ETC

Supply & Installation of signal cable 3 CORE SHIELDED


MICROPHONE cable from Head End to each MICROPHONE
in 1" dia UPVC conduit as per drawing &specification complete
in all respect
Total of Sec-P
Carried forward to Summary

Sec-Q

Uninterrruptable Power Supply (UPS)

83 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

84 of 90

Sheraton Hotel Islamabad - Electrical Works


ITEM
No.

DESCRIPTION

QTY

UNIT

Supply and installation including wiring, conduits, connections,


terminations, fixings, fittings and the like: complete in all
respect.

15 kVA 30 min back-up time


(3 Phase+n IN , 3 Phase+N OUT)

Item

25 kVA 30 min back-up time


(3 Phase+N IN , 3 Phase+N OUT)

Item

Providing, installation, testing and commissioning of 1500 kVA


Diesel Generators with all connecting accessories, complete in
all respect.

No.

Providing and installation of DG Set Canopy suitable for


1500kVA set with all fixing arrangements.

No.

Providing and installation of Diesel fuel day tank suitable for


10000 liter diesel capacity installed on surface with all fixing
arrangements.

No.

Providing and installation of following sizes of schedule 40 MS


piping for fuel transfer system with all accessories.

Lot

Providing and installation of various types of valves with all


other necessary accessories, complete in all respects.

Lot.

Job.

No.

Total of Sec-Q
Carried forward to Summary
Sec-R
1

Diesel Generator System

Providing, installation and connection of Auto Fuel tranfer


system with all accessories, necessary control wiring etc.
complete in all respect.

Providing and installation of Pumps for fuel tranfer system.


Total of Sec-R
Carried forward to Summary

Sec-S
1

Miscellaneous Works
Providing, installation,connection, testing and commissioning
of following items with all accessories.

1.1

Carpet/Tile type underfloor outlet box suitable for 04 outlets.

350

No.

1.2

Galvanized MS octagonal lighting poles for external lighting


approx. 30 feet height

250

No.

1.3

Hand Dryers.

600

No.

85 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

86 of 90

Sheraton Hotel Islamabad - Electrical Works


DESCRIPTION

QTY

UNIT

1.4

Screeded underfloor trunking with 3 partitions.

2,500

Mtr.

1.5

Testing and Commissioning (T&C) of the overall Electrical


Works in addition to the T&C of various individual components
as covered in BOQ items hereinabove.

Item

Identification labels, special tools & spares.

Item

Protective and decorative painting.

Item

1.8

Co-ordination and liaison with all other building services and


Local Authorities.

Item

1.9

Builders work in connection with Electrical Works complete as


per specifications and drawings.

Item

Job

Job

Item

ITEM
No.

1.6
1.7

1.10
Under vehicle survellience system including cameras, lighting
for day/night operation, wiring, recoding. Monitoring LCD.
Connection to CCTV system and data network.
1.11

1.10

Obstruction lighting as per ICAO and CAA requirements


The Contractor shall list here and price any items shown on the
drawings, mentioned in the specifications, or required for the
satisfactory completion and to make the system/ works fully
operational conforming to the design intent, but not mentioned
herein. Any such items not mentioned below shall be deemed
to be included.
Total of Sec-S
Carried Forward to Summary

87 of 90

UNIT RATE
(RS)

Sheraton Hotel Islamabad - Electrical Works


AMOUNT
(RS)

88 of 90

SHERATON HOTEL ISLAMABAD

SUMMARY OF COST

SEC NO.

DESCRIPTION

SECTION-A

SUBSTATION EQUIPMENT

SECTION-B

LIGHTNING PROTECTION SYSTEM

SECTION-C

EARTHING SYSTEM

SECTION-D

L.V. SWITCHGEARS

SECTION-E

MAIN/SUB-MAIN L.V. CABLES

SECTION-F

G.I. CABLE TRAY/TRUNKING/M.S CONDUIT/G.I. CONDUIT/UPVC PIPE

SECTION-G

LIGHT/POWER CIRCUIT & POINT WIRING

SECTION-H

SWITCHES, SOCKETS & OUTLETS

SECTION-J

LIGHT FIXTURES

SECTION-K

FIRE ALARM & VOICE EVACUATION SYSTEM

SECTION-L

TELEPHONE & DATA SYSTEM

SECTION-M

SMATV SYSTEM

SECTION-N

CCTV SYSTEM

SECTION-O

HOTEL LOCKING SYSTEM

SECTION-P

P.A/BACKGROUND MUSIC SYSTEM

SECTION-Q

UNINTERRUPTABLE POWER SUPPLY (UPS)

SECTION-R

DIESEL GENERATING SYSTEM

SECTION-S

MISCELLANEOUS WORKS
Total Amount
Carried to Grand Summary

Page 89 of 1

ELECTRICAL WORKS

SUMMARY OF COST

AMOUNT
RS.

Y/TRUNKING/M.S CONDUIT/G.I. CONDUIT/UPVC PIPE

Page 90 of 1