Professional Documents
Culture Documents
Town Water Supply - Pump, Pumping Main: Delivery Pipe
Town Water Supply - Pump, Pumping Main: Delivery Pipe
DESIGN FLOWS:
Qp,dmax,d
Pmp. Hours:
Qp,dmax,h
Qp,dmax,h
Unit
[m/d]
[h]
[m/h]
[l/s]
WATER PROPERTIES:
Viscosity :
Density :
Gravity Accelaration g:
2033
2043 Comment
[m/s] 1.00E-06 1.00E-06 H2O at T = 20C
[kg/m] 999.88
999.88 H2O at T = 20C
[m/s]
9.81
9.81
SYSTEM PROPERTIES:
Delivery Pipe:
2033
2600
16
163
45
2043
3100
19
163
45
Comment
2033
2043
Comment
[mm]
[m/s]
250
0.92
250
0.92
[m]
52.04
52.36
[m]
[m]
44.97
0.50
44.97
0.50
Roughness k:
Length L:
[mm]
[m]
0.40
1.5
0.40
1.5
Diameter D:
Velocity V:
Reynolds No. Re:
Friction Coefficient :
Linear Headloss H lin, suc.:
Sum of Minor Losses Coef. :
Total Minor Losses H min, suc.:
Total Losses Htot,suc.:
[mm]
[m/s]
[-]
[-]
[m]
[-]
[m]
[m]
250
0.9
229890
0.0221
0.01
4.00
0.17
0.18
Roughness k:
Length L:
[mm]
[m]
0.40
1
0.40
1
Diameter D:
[mm]
250
250
Velocity V:
[m/s]
0.5
0.3
[-]
[-]
[m]
[-]
[m]
[m]
114945
0.0221
0.00
5.00
0.05
0.05
76866
0.0221
0.00
5.00
0.02
0.02
0.23
0.20
[N/m]
[N/m]
[N/m]
[m/s]
0.00
85000
2337
0.92
0.00
85000
2337
0.92
[m]
[m]
0.00
8.24
0.00
8.27
[m]
[m]
45.47
52.22
45.47
52.54
Htot.geo. = f + i
2033
2043
Comment
Diameter D:
Velocity V:
Total Dynamic Losses Htot,del.:
System Properties:
Difference in GL bewteen pump
nozzle and Ground Tank f:
Height of Outlet point above GL i:
Suction Pipe - Part 1:
250
Vmax. = 1,1 m/s; Vmin. = 0,5 m/s;
0.9
230598
0.0221 acc.: Swamme & Jain Eq.
0.01
4.00
accounting for all bends, fittings,etc.
0.17
0.18
[-]
DRY
DRY
Pumping Head H:
Flow Q:
NPSHav
NPSHreq
Pump Efficiency pmp:
Pump Power Input PPMP:
[m]
[l/s]
[m]
[m]
[-]
[kW]
97.69
45.14
8.24
2.50
0.65
66.54
98.01
15.09
8.27
2.50
0.65
22.32
[kW]
73.20
24.55
[-]
[kW]
[Hz]
[1/min]
[-]
0.90
81.33
50
2900
0.90
27.28
50
2900
TRANSMISSION PUMP
Page 1 of 2
Design Report
DESIGN FLOWS:
Qp,dmax,d
Pmp. Hours:
Qp,dmax,h
Qp,dmax,h
Unit
[m/d]
[h]
[m/h]
[l/s]
2033
2600
16
163
45
WATER PROPERTIES:
Viscosity :
Density :
Gravity Accelaration g:
[m/s]
[kg/m]
[m/s]
2033
1.00E-06
999.88
9.81
[mm]
[m]
[mm]
[m/s]
[-]
[-]
[-]
[-]
[m]
[-]
[m]
[m]
2033
0.40
13500
250
0.92
mPVC
16
229890
0.0221
51.39
15.00
0.65
52.04
2043
0.40
13500
250
0.92
mPVC
16
230598
0.0221
51.71
15.00
0.65
52.36
2033
2043
mPVC
2050
3000
999.88
250
10.7
347.63
mPVC
2050
3000
999.88
250
10.7
347.63
0
9.81
13500
ALLIEVI
0
assume: worst case
9.81
13500
ALLIEVI Sudden Closure
2043
3100
19
163
45
Comment
2043 Comment
1.00E-06 H2O at T = 20C
999.88 H2O at T = 20C
9.81
Comment
assumed integral roughness
approximate value
Vmax. = 1,5 m/s; Vmin. = 0,5 m/s;
chosen
acc.: Swamme & Jain Eq.
accounting for all bends, fittings,etc.
Comments:
PSP: Peak Season Production Requirement
WATER HAMMER CALCULATION
Wave Propagation Velocity a:
Pipe material:
[-]
Water modulus of elasticity :
[N / mm]
Material modulus of elasticity E:
[N / mm]
Water density :
[kg/m]
Diameter D:
[mm]
Pipe Thickness e:
[mm]
Wave Propgation Velocity a:
[m/s]
Selection of Formula:
Input:
effective closing time t:
[s]
Gravity Accelaration g:
[m/s]
Length of Pipeline L:
[m]
Selection of Formula:
Formula:
Pressure surges and drops H:
Input:
flow velocity before v1:
[m/s]
flow velocity after v2:
[m/s]
Pressure surges and drops H:
[m]
Resistence Check against water hammer:
Pipe Entities:
Working Pressure (WP)
[bar]
Test Pressure (TP)
[bar]
System Entities:
[m H2O]
Max service Pressure (DP):
[m H2O]
Pressure surges and drops H:
[m H2O]
Max Design Pressure (MDP) :
Inequalities to meet:
Design Pressure (DP) < Working
Pressure (WP)
Test
Max. Design Pressure (MDP) < Test
Pressure (TP)
Test
TRANSMISSION MAIN
0.92
0
32.6
0.92
0
32.7
16
20
16
20
114
32.6
147
114
32.7
147
H2O at T = 20C
1.40
1.36
Page 2 of 2