Simptww PSV C208
Simptww PSV C208
Scheduling Info:
Updated (Rev#):
Job Walkthrough
Scaffolding -
External
Work Order #:
System Owner
(s):
_______________
Resource(s)
NOTES
hrs
(Date Comp. )
hrs
(Date Comp. )
hrs
N/A
Internal
(Remove / Install)
N/A
Steam Tracer
(Remove / Install)
N/A
LO/TO
(Install / Remove)
hrs
hrs
/
hrs
Blower /
Vacuum Truck /
Lighting /
Empty Vessel
Wash
Forklift /
Drums /
Skylift
Gen. Set
Method :
FORM-PM-SIMPTWW
Frequency Months
Insulation
Crane /
Julaini
Date
(# )
JSA / Risk
Prediction
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
hrs
Develop: 15/10/2010
UBF (in-house)
Atmajaya
, Mech
Operation
CSE Crew -
FPG
Mech
Cont.
Operation
Operation
Rev. # 01
SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C208
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
Major Turnaround
Updated (Rev#):
_______________
Julaini
Frequency Months
Additional Information Required - Pls. add drawings, sketches, photo etc. to show the location and scope of work.
Comments :
Shutdown Procedure (by System Owner) : Use Sd Procedure Template and MUST be attached to this document
Work Procedure / Sequence (by Job Owner) :
1. Remove
2. Inspect
3. calibrate
4. reinstall
Controlled Doc./ SOP # (if any):
PSV C208
E-309
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01
SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C208
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
_______________
Major Turnaround
Updated (Rev#):
Julaini
Frequency Months
If additional tasks are required, add them on the back of this form. Identify where the additional tasks belong in the sequence and provide details to the Maintenance Planner to update the Schedule.
Material Master #
(Parts)
Bin #
Part #
Qty
Qty
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01
SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C208
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
Major Turnaround
Updated (Rev#):
_______________
Julaini
Frequency Months
Notes:
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01