Abstract: As the LNG low temperature properties, before its first entry into the
receiving station technology system, you need to use LNG cryogenic LNG vapor dump line
(BOG) pre-cooled to -120 , and then reintroduced into the LNG pipeline will discharge was
cooled to - 150 . Pre-cooling the discharge line is to ensure that the focus of the work of
LNG terminal successfully put into trial operation. To this end, Zhejiang LNG terminal as an
example, the use of self-programming model for long distance LNG discharge pipe diameter
l000mm pipeline BOG pre-cooling process, the establishment of a one-dimensional flow and
heat transfer model, with the BOG MATLAB simulation tool pre-cooling the entire process
of LNG unloading lines, the results show: the discharge pipe wall temperature does not
exceed the maximum rate dropped 10 / h, calculation time step taken l0 s, calculated 737m
unloading of LNG pipeline was cooled to - the required time is about l20 30.25h. Also
analyzed the influence of different factors on the discharge line of the pre-cooling process,
the results showed: cooling over time increases with the BOG flow at the end of the
cooling phase, BOG flow rate of 40.95kg / s, the cumulative consumption BOG as l4330kg;
pipeline within the BOG flow rate increases with increasing cooling time; pipeline
BOG pressure within the cooling time and with the increase of pipe length decreases.
Suggesting practical operation, the pipeline was cooled to -100 to enter the LNG cooling
stage, the cooling time and save the entire amount of BOG pipeline.
Keywords: Zhejiang LNG terminal dump line BOG MATLAB modeling precooling
A simulation study of boil-off gas (BOG) pre-cooling process in unloading pipelines in all
LNG terminal
in Zhejiang
Abstract:
Before LNG enters into a terminal from cargo tanks, the pre-cooled LNG boil-off gas
(BOG) steam will be utilized first to cool the unloading lines down to -120 , and LNG will
then be introduced to cool the lines down to -150 . This will be essential for a LNG
terminal to be smoothly put into operation. In view of this, a case study was performed in a
LNG terminal in Zhejiang province. First, a self-programming system was adopted to build a
one dimensional flow heat transfer model for the BOG pre cooling process in a long distance
LNG unloading line with the diameter of l000mm. The results were achieved in this
simulation case study assisted by MATLAB. The maximum temperature drop rate on the
pipe wail surface was not more than l0 / h; when the time step was l0s, the cooling time
would be 30.25h for a 737m LNG unloading line cooled down to -120 . Additionally, the
impact of different factors was analyzed on the BOG pre-cooling process in LNG unloading
lines. The BOG flow rate increases gradually over time and reaches up to 40.95kg / s by the
end of cooling stage with the cumulative consumed BOG quantity of l4330kg; its flow speed
in the lines increases with the increasing cooling time; and its pressure decreases with the
increase of cooling time and pipe length. Thus, it is suggested that in practical operation, the
LNG cooling should be got involved as soon as the unloading line is cooled down to -100 ,
which will help save the cooling time and the BOG consumption for the whole line.
Priorities is to ensure that pre-cooling LNG terminal successfully put into trial operation. By
pre-cooling at room temperature so that the LNG pipeline and tank reaches the low
temperature working conditions, to prevent the sudden entry of LNG caused a sharp
contraction of pipes and storage tanks, resulting in damage to the pipes and tanks; In addition,
you can also pre-cooling cryogenic equipment and pipeline inspection facilities pipes cold
shrinking, pipe bracket support change, cryogenic valves sealing, tank low temperature
properties [2]. Zhejiang LNG terminal as an example, the use of self-programming model,
using MATLAB tool to simulate the unloading of LNG BOG cooling line the whole process,
for the LNG terminal actual intake air cooling operation and provide a theoretical basis for
optimization tips.
Establish a model
1.1 Zhejiang LNG Receiving Terminal Process Description
Zhejiang LNG terminal process shown in Figure 1. The LNG from the LNG terminal
LNG carriers (-162 ) through the discharge line on the dock transported to the LNG storage
tank. Pressure pump located inside the tank and then transporting the LNG storage tank to
LNG within the tank and then the condenser, the high pressure pump and then through a
further condenser pressurized LNG delivered to the gasifier, the final LNG gasification in the
gasifier after delivery to the gas pipeline network in Zhejiang Province, the natural gas
pipeline natural gas delivered to the end user [3-4]. Zhejiang LNG terminal discharge pipeline
consists of 40in (1in = 25.4mm) main discharge pipe, 36in feed manifold and the end of the
pipe 4in sprinkler piping components.
through the end of the pipe 36in 1.5in bypass valve and spray line 4in discharged into LNG
storage tanks. When the end of the pipe surface temperature reaches 120 End BOG
cooling phase. Finally, the introduction of the LNG, the depth of the second pre-cooling
stage, until the pipeline is full of LNG. The simulation model is mainly BOG is precooled
discharge pipeline process.
Model dump line is divided into a number of the total 737m infinitesimal segment
within the outer tube and pipe natural convection boundary conditions for convective heat
transfer under BOG conditioning, heat from the outside into the interior. Wall insulation
layer and the initial temperature is room temperature, in the pre-cooling process, the
temperature of the wall and the insulation material is gradually decreased.
1.2.1 tube fluid temperature, pressure, speed and other parameters
According to the energy conservation equation, momentum equation, mass conservation
equation and the equation of state is obtained is calculated BOG outlet temperature, pressure,
velocity and density parameters [5-14].
among them:
At each time step, the initial calculation conditions (inlet temperature, pressure, velocity
and density) infinitesimal segment 1 and the boundary conditions on behalf of the segment
infinitesimal population temperature of the gas into the formula (1) to (4), calculated 2 ,
pressure, velocity and density, and finally the use of the formula (9) to calculate the pipe wall
temperature. Calculation stopped until the temperature reaches the wall -l20 .
2 calculation results
BOG precooler inlet condition input program (BOG inlet gas temperature of -120 deg.]
C, an inlet pressure of 24 kPa, the maximum pipe wall temperature decrease rate of l0 / h),
12h after the calculation, the following calculations.
2.1 discharge end of the pipe is cooled to the target temperature -l20 time required
Dump line in Figure 2 the wall temperature changes. Expected to discharge cooling
As can be seen from Figure 2, with the extension of the passage of time and asked the
length of the pipeline, the discharge line temperature is gradually reduced to the target
temperature. Specific feature point discharge pipeline wall temperature calculation results
are shown in Table l.
the end of the cooling phase, BOG gas flow to 40.95kg / s, the cumulative consumption of
BOG l4330kg. Population BOG dump line mass flow changes shown in Figure 3, the
discharge line BOG inlet mass flow results in Table 2.
Within 2.3 Pipeline BOG flow rate increases with increasing cooling time
BOG flow rate increases due to the mass, and therefore, the flow rate of the BOG
conduit increases. The BOG flow rate changes in the discharge line in Figure 4.
2.4 pipeline BOG pressure increases cooling time and length of the pipe decreases
The dump line BOG pressure variation shown in Figure 5.
3 Conclusion
1) After calculation, the end of the pipeline is expected to discharge cooled to a desired
temperature of -120 when the target time is 30.25h.
2) In order to maintain l0 / h cooling rate, cooling BOG flow rate increases over
time, at the end of the cooling phase, BOG flow rate of 40.95kg / s, the cumulative
consumption of BOG l4330kg.
3) at 26h after cooling, the BOG mass flow rate significantly increased, from 10 to 40
times the initial. Cooling around 28h of mass flow rate of BOG 5.65kg / s, it was cooled to
line can -96 . Late into the cooling needs not only greatly increase the amount of the
cooling gas and the time is extended accordingly. Suggesting practical operation, the
pipeline was cooled to -100 to enter the LNG cooling stage, the cooling time and save the
entire amount of BOG pipeline.
5) pressure pipe BOG asked to increase the length of the pipeline decreases upon
cooling.
Symbol Description
Paper A is the area, m 2; c is the specific heat, J / (kg K) ; C p is the specific heat, J / (kg
K) ; D is the pipe diameter; f of evaporation coefficient; G r is
the
pressure,
kg K); T is the tube fluid temperature, K; T bao the insulation temperature, K; TT is BOG
temperature,