NVF Annual Bridge Conference 2014

Unique bridges in Qatar


Agenda:
Client's Expectations
COWI's design
Contractors
construction sequence
Photos from the
construction

Jesber Rasmussen, Chief Project Manager, COWI A/S


1

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Client's expectations

Project description
New township in Doha in Qatar to
200.000 residents

Marinas
Business center
Entertainment
Beaches
Hotels
5 billion dollar projects
9 marine bridges
Two of the bridges needed to be very
unique
2

3 AEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Client's expectations

Concepts developed together with


Dissing+Weitling
Cable Stayed landmark
Arch bridge landmark
Suspension bridge landmark
Client chose the suspension bridge

Because:
First of its kind in the world
A true landmark for Lusail
Circle could resemble the Q in Qutar
Circle represent the sun as the
source of life
3

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design concept

Form and functionality unique


Fantasy concept

Like art
Lighting and illustration to become
landmark for Lusail in Qatar

= The challenge was set

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Self anchored suspension bridges


Suspension bridge concept with app.
200m bridge lengths

Self anchored suspension bridges with


one cable plan
Cross girders and hangers per 6m
Ring diameter of 50m produced in high
strength steel over the deck and high
strength concrete under the deck

3 SEPYEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Self anchored suspension bridges


Composite bridge deck with closed steel box
Steel box and main cable corrosion
protected by dehumidification system

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Main cable
Mono cable
Cable anchored at ring and at bridge
ends and down to the anchor block
Like a two tower suspension bridge with
double length

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Cable system
Main cable 7 locked coil strands 140,
13900mm^2, min 18,7MN

Main cable 424 dehumidification system

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Anchor of Main cable at bridge ends


Bridge self anchored partly
Main span fully anchored for main span

Side span anchored at bridge deck and


at the anchor block

Anchored
down due to
uplift

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Anchor of Main cable at pylon


Cables are anchored at pylon ring.
Anchor saddle would be long is not
anchored individual

10

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Hangers
Hangers pre-fabricated locked coil
strands 70, 3390mm^2 and min.
strength of 4.8MN
Hangers protected by HDPE pipe

11

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Cable clamps
Cable clamps design very compact and
unique visual from the road.

12

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Bridge deck
Composite bridge deck with 250mm
concrete deck for weight and stiffness for
cable system
Max deformation 1/400*span
Single cable plan require torsion stiffness
= closed box girder
Pre-fab + insitu deck

13

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

side span
abutment

Pylon leg

Pylon leg

Bridge deck
Two precast elements used

insitu

pre-fab

insitu

Between the pylon legs insitu


concrete steel plate under for
strengthening
At bridge end in situ concrete
because of joints and steel plate
under the deck for strengthening
pre-fab

insitu

main span
abutment

14

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Steel girder
Box girder closed
small cross girders per 6m max height 2,74m and width 1.0m

15

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Steel girder
Utilities running in the girders
hence relative large opening

16

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Cross girder
Cross girder per 6m for the hangers
No cross girders between the pylon legs
no cross girders

17

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Connection bridge deck and pylon


Hammerhead in concrete
Connecting bridge deck with pylon legs
and with the pylon ring

18

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Pylon ring
Pylon ring 50m dia.
Pylon in high strength steel
above bridge deck and pre
stressing high strength
concrete below bridge deck
Foundation on bored piles

19

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Pylon ring
Pylon steel strengthened with stiffeners

20

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Concrete part of pylon ring


6+8 cables between the pylon steel ring
and pylon pier

21

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Anchor block and abutment


Post-tensioned anchor block

5 strands from main anchored in anchor block 2 strands anchored in the


superstructure girder
7 strands anchored in the superstructure at the abutment

22

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Design

Dehumidification system
All closed steel areas will
corrosion protected by
dehumidification
One system for bridge
girder, pylon and main
cable

23

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Construction sequence

Construction
1. Widen earth
bridge/excavation
2. Piling and pile cap
construction

3. Substructure construction
4. Backfill and gantry crane
installation
5. Bent system-side span
construction
6. Pylon & main span erection
7. CIP deck cast
8. Cable Erection
24

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

25

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

26

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

27

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

28

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

29

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

30

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

31

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

32

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

33

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

34

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

35

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

36

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

37

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

38

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

39

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

40

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

41

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

42

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

43

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

44

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Photos

45

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION

Completed bridge

46

30 AUGUST 2014
COWI POWERPOINT PRESENTATION

Thank you
47

3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION