3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Client's expectations
Project description
New township in Doha in Qatar to
200.000 residents
Marinas
Business center
Entertainment
Beaches
Hotels
5 billion dollar projects
9 marine bridges
Two of the bridges needed to be very
unique
2
3 AEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Client's expectations
Because:
First of its kind in the world
A true landmark for Lusail
Circle could resemble the Q in Qutar
Circle represent the sun as the
source of life
3
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design concept
Like art
Lighting and illustration to become
landmark for Lusail in Qatar
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
3 SEPYEMBER 2014
COWI POWERPOINT PRESENTATION
Design
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Main cable
Mono cable
Cable anchored at ring and at bridge
ends and down to the anchor block
Like a two tower suspension bridge with
double length
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Cable system
Main cable 7 locked coil strands 140,
13900mm^2, min 18,7MN
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Anchored
down due to
uplift
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
10
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Hangers
Hangers pre-fabricated locked coil
strands 70, 3390mm^2 and min.
strength of 4.8MN
Hangers protected by HDPE pipe
11
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Cable clamps
Cable clamps design very compact and
unique visual from the road.
12
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Bridge deck
Composite bridge deck with 250mm
concrete deck for weight and stiffness for
cable system
Max deformation 1/400*span
Single cable plan require torsion stiffness
= closed box girder
Pre-fab + insitu deck
13
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
side span
abutment
Pylon leg
Pylon leg
Bridge deck
Two precast elements used
insitu
pre-fab
insitu
insitu
main span
abutment
14
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Steel girder
Box girder closed
small cross girders per 6m max height 2,74m and width 1.0m
15
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Steel girder
Utilities running in the girders
hence relative large opening
16
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Cross girder
Cross girder per 6m for the hangers
No cross girders between the pylon legs
no cross girders
17
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
18
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Pylon ring
Pylon ring 50m dia.
Pylon in high strength steel
above bridge deck and pre
stressing high strength
concrete below bridge deck
Foundation on bored piles
19
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Pylon ring
Pylon steel strengthened with stiffeners
20
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
21
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
22
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Design
Dehumidification system
All closed steel areas will
corrosion protected by
dehumidification
One system for bridge
girder, pylon and main
cable
23
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Construction sequence
Construction
1. Widen earth
bridge/excavation
2. Piling and pile cap
construction
3. Substructure construction
4. Backfill and gantry crane
installation
5. Bent system-side span
construction
6. Pylon & main span erection
7. CIP deck cast
8. Cable Erection
24
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
25
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
26
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
27
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
28
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
29
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
30
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
31
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
32
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
33
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
34
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
35
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
36
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
37
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
38
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
39
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
40
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
41
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
42
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
43
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
44
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Photos
45
3 SEPTEMBER 2014
COWI POWERPOINT PRESENTATION
Completed bridge