Lokesh Sapre: Uid No

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

LOKESH SAPRE

Mobile: +919527122597, +918696524097


Residence: +91 7612417278
E-Mail: lokesh2511@gmail.com
UID NO: 315156527061
Seeking for a challenging job with growth oriented organisation of repute where in my qualifications and acquired skills are
put to the best use providing me with an opportunity to grow professionally to my full potential
Abridgement

5+ years of professional experience while working as a Mechanical Engineer in coal based thermal power plant.

Successfully completed Bachelors of Engineering degree in Mechanical Engineering from Rajiv Gandhi Technical University,
Bhopal.

Gained hands-on experience in Erection &Maintenance of rotary equipment of high precision in a 2*600 MW thermal power
project.

Providing the feasible solutions & building healthy relationships, thereby achieving high customer satisfaction.

Abilities in handling multiple priorities, with a bias for action & genuine interest in personal and professional development.

Focused and goal oriented budding professional with excellent communication & interpersonal skills.

Professional Profile

Employer
Role
Date of Employment
Current project

: Alstom Bharat Forge Power Ltd.


: Sr. Engineer-Steam Turbine
: May 2014 to present
: 2x660MW Sholapur Super thermal power project, Solapur, Maharashtra
Owned by NTPC Ltd.

Career profile

5.4 Years of diversified experience in 600MW and higher EPC Thermal Power Project.
Knowledge of 600MW and higher turbine generator, Condenser and its pumps & auxiliaries.
Extensive knowledge with hand on experience in the erection of Steam turbine generator with its auxiliarys pumps (both
horizontal and vertical).
Managing and providing support and coordination to the project commissioning team.
Excellent interpersonal skills in communication, client and sub-contractor interfacing.
Strong documentation and reporting skills.
Effectively builds inter and intra company partner alignments and relationships.
Delivering and implementing the project as per the scheduled milestones.

Roles and Responsibilities

Successfully shouldered the responsibility for erection of Alstom steam turbine and auxiliary equipment of the STG area.
To evaluate & monitor over all work progress of erection equipment as per scheduled planning.
Analyzing engineering issues and giving feedback to all superiors about site activities and progress details related to erection
activities as and when required.
Reviewing ITP & making protocol for field inspections.
Co-ordination with client & sub- contractors at site.

Previous Experience

Employer
Role
Date of Employment
Project

: Doosan Power System India.


: Sr. Engineer-Mechanical
: January 2014 to April 2014
: 2x685MW GMR Chhattisgarh Thermal Power Project, Raipur, Chhattisgarh
Owned by GMR Energy Ltd.

Roles and Responsibilities

Responsible for erection of GE steam turbine, generator & its auxiliary pumps of the STG area.

Responsible for project site manpower management.


Material Procurement and management.

Previous Experience

Employer
Role
Date of Employment
Project

: BGR Energy Systems Ltd (PPD DIVISION).


: Engineer-Mechanical
: April 2011 to January 2014
: 2x600MW Kalisindh Super Thermal Power Project, Jhalawar, Rajasthan
Owned by RRVUNL (Rajasthan).

Roles and Responsibilities

Successfully shouldered the responsibility for erection of DEC 600mw steam turbine and auxiliary equipment of the STG area.
To evaluate & monitor over all work progress of erection equipment as per scheduled planning.

Analyzing engineering issues and giving feedback to all superiors about site activities and progress details related to erection
activities as and when required.
Responsible for managing and providing support to commissioning team activities in the STG area. Fully involved in the
ongoing commissioning activities such as lube oil & control oil flushing of turbine, generator and boiler feed pumps unit.
Coordination for start up and normal operation, emergency handling and safe shut down of Units.
Line up of the unit and its auxiliaries, changeover of equipments, routine testing of protection system and annunciation
system.

Milestones Achieved

Successfully synchronized unit#1 with on full load.

Awards

Awarded for best safety performance on 42th national safety day for year 2013.

Previous Experience

Employer
Role
Date of Employment
Project

: PowerMech Projects Ltd.


: Engineer-Mechanical
: October 2009 to March 2011
: 2x600MW Lanco Anpara Super Thermal Power Project, Anpara, UP
Owned by LANPL (UP)

Roles and Responsibilities

Responsible for erection of DEC steam turbine, generator & its auxiliary pumps of the STG area.
Responsible for project site manpower management.
Material Procurement and management.
Measurement of contractors work.

Academic Projects/ Training Undertaken

Two weeks summer training at VEHICLE FACTORY JABALPUR, manufacturing unit to meet Transport Needs of armed
forces. The training was on the study of assembly of vehicles, supplied to Indian armed forces.

Four weeks summer training at NARMADA GELATINES LTD. JABALPUR, manufacturing unit of Ossian and Gelatine.

Minor project on the Power Punching Machine.

Final year project on Design & model of Geometric Figure Drafting Machine.

IT

Forte

Knowledge of Auto CAD (2006), CATIA (V5R16) & Pro-E (wildfire 4.0).

Working command in MS office.

Personal Dossier
Date of Birth
Gender
Nationality
Language Known
Marital Status
Permanent Address
Passport No.

:
:
:
:
:
:
:

25th November, 1985


Male
Indian
Hindi, English & Marathi
Married
1171-A, Dayanagar, Yadav colony, Jabalpur, MP. Pin: 4820002.
L3622510

You might also like