Professional Documents
Culture Documents
!!!!!!!!!!!!! Co2
!!!!!!!!!!!!! Co2
Complete blue cells on this worksheet and on the Cost Breakdown worksheet.
EXECUTIVE SUMMARY
Project Address
Project Team
Client's Representative
Architectural
Engineering
Quantity Surveying
Other
Cost
Excluding VAT
TOTAL
of which
Liable for VAT @ 23%
Liable for VAT @ 0% or exempt
Liable for VAT @ 13.5%
0
VAT
0
VAT Total
0
0
0
0
0
Summary of Costs
0
0
VAT exclusive
Cost
10.0 General
20.0 Excavation, dredging, reclamation and filling
30.0 Structures and marine systems
40.0 Roads, surfacing and hardstanding areas
50.0 Landscaping and finishing
60.0 External mechanical and electrical works
70.0 Building works
TOTAL excluding VAT
% of total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Cost Breakdown
In each category, enter either a single all-inclusive cost (excl. VAT) or a breakdown of costs (excl. VAT).
VAT exclusive
Cost
10.0 General
10.1 Performance Bond
10.2 Insurances
10.3 Contractual requirements including health & safety, and environmental management plan
10.4 Office accommodation, consumables, services and equipment for the Engineer
10.5 Underwater inspections and attendance on Engineer's diving inspections
10.6 Site project/NDP/EU signs, navigation issues, tide gauges, photos, etc.
10.7 Contractor's general mobilisation and demobilisation
10.8 Contractor's site supervision
10.9 Contractor's site administration
10.10 Contractor's head office administration
10.11 Demolition and site clearance
10.12 Testing required of all materials and all necessary in situ tests
10.13 Other
10.0
Subtotal
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
Subtotal
Subtotal
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
% of total
cost
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
Notes
Subtotal
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Subtotal
0.00
0.00
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Subtotal
0.00
0.00
0.00
General
Total Cost from Cost Breakdown:
Item
0.00
Notes
0.00
Notes
0.00
Notes
0.00
Notes
0.00
Notes
0.00
Notes
Building works
Total Cost from Cost Breakdown:
Item
0.00
Notes