2 Fjmock

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 122

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ.

MOCK TAHUN 1991


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

288.00
13.00
31.00
4.41
136.72

226.00
12.00
28.00
3.88
108.54

272.00
12.00
31.00
3.97
123.15

251.00
12.00
30.00
3.76
112.91

271.00
11.00
31.00
4.20
130.34

148.00
6.00
30.00
4.49
134.61

47.00
5.00
31.00
3.45
106.82

20.00
13.00
5.00
6.84
136.72

20.00
12.00
6.00
6.51
108.54

20.00
12.00
6.00
7.39
115.76

20.00
12.00
6.00
6.77
106.13

20.00
11.00
7.00
9.12
121.22

20.00
6.00
12.00
16.15
118.45

20.00
5.00
13.00
13.89
92.93

151.28
351.28
200.00
0.00
151.28

117.46
317.46
200.00
0.00
117.46

156.24
356.24
200.00
0.00
156.24

144.87
344.87
200.00
0.00
144.87

149.78
349.78
200.00
0.00
149.78

29.55
229.55
200.00
0.00
29.55

-45.93
154.07
154.07
45.93
0.00

0.30
45.38
0.92
0.10
43.57
183.08
226.65
27.65
17.74
105.90
0.00
123.63

0.15
17.62
0.80
0.10
15.86
181.32
197.18
-29.47
47.09
99.84
0.00
146.93

0.30
46.87
0.90
0.10
44.53
177.46
221.99
24.81
22.06
109.37
0.00
131.43

0.30
43.46
0.85
0.10
40.20
188.69
228.89
6.90
36.56
101.41
0.00
137.97

0.30
44.93
0.85
0.10
41.56
194.56
236.12
7.23
37.70
104.85
0.00
142.55

0.30
8.86
0.85
0.10
8.20
200.70
208.90
-27.22
36.08
20.68
14.80
71.57

0.30
0.00
0.80
0.10
0.00
167.12
167.12
-41.78
41.78
0.00
4.70
46.48

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
11.445

247.95
15.059

247.95
12.167

247.95
13.198

247.95
13.196

247.95
6.846

247.95
4.303

Aug

Sep

Oct

Nov

Dec

54.00
2.00
31.00
4.15
128.73

140.00
5.00
30.00
3.85
115.54

343.00
10.00
31.00
3.99
123.76

357.00
7.00
30.00
4.04
121.05

601.00
13.00
31.00
4.08
126.42

20.00
2.00
16.00
20.60
108.13

20.00
5.00
13.00
15.02
100.52

20.00
10.00
8.00
9.90
113.86

20.00
7.00
11.00
13.32
121.05

20.00
13.00
5.00
6.32
126.42

-54.13
99.93
99.93
54.13
0.00

39.48
139.42
200.00
0.00
39.48

229.14
429.14
200.00
0.00
229.14

235.95
435.95
200.00
0.00
235.95

474.58
674.58
200.00
0.00
474.58

0.30
0.00
0.80
0.10
0.00
133.70
133.70
-33.42
33.42
0.00
5.40
38.82

0.30
11.84
0.80
0.10
10.66
106.96
117.62
-16.08
27.92
27.64
14.00
69.56

0.10
22.91
0.80
0.10
20.62
94.09
114.72
-2.90
25.82
206.23
0.00
232.04

0.15
35.39
0.95
0.10
34.51
108.98
143.49
28.77
6.62
200.56
0.00
207.18

0.15
71.19
0.90
0.10
67.63
129.14
196.77
53.28
17.91
403.39
0.00
421.30

247.95
3.594

247.95
6.654

247.95
21.480

247.95
19.818

247.95
39.001

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1992


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

643.00
14.00
31.00
4.41
136.72

208.00
8.00
28.00
3.88
108.54

303.00
11.00
31.00
3.97
123.15

177.00
8.00
30.00
3.76
112.91

400.00
15.00
31.00
4.20
130.34

351.00
12.00
30.00
4.49
134.61

316.00
9.00
31.00
3.45
106.82

20.00
14.00
4.00
5.47
136.72

20.00
8.00
10.00
10.85
108.54

20.00
11.00
7.00
8.62
114.53

20.00
8.00
10.00
11.29
101.61

20.00
15.00
3.00
3.91
126.43

20.00
12.00
6.00
8.08
126.53

20.00
9.00
9.00
9.61
97.21

506.28
706.28
200.00
0.00
506.28

99.46
299.46
200.00
0.00
99.46

188.47
388.47
200.00
0.00
188.47

75.39
275.39
200.00
0.00
75.39

273.57
473.57
200.00
0.00
273.57

224.47
424.47
200.00
0.00
224.47

218.79
418.79
200.00
0.00
218.79

0.30
151.88
0.92
0.10
145.81
183.08
328.89
129.89
22.00
354.40
0.00
376.39

0.15
14.92
0.80
0.10
13.43
263.11
276.54
-52.35
67.27
84.54
0.00
151.81

0.30
56.54
0.90
0.10
53.72
248.88
302.60
26.06
30.48
131.93
0.00
162.41

0.30
22.62
0.85
0.10
20.92
257.21
278.13
-24.47
47.09
52.77
17.70
117.56

0.30
82.07
0.85
0.10
75.92
236.41
312.32
34.20
47.87
191.50
0.00
239.37

0.30
67.34
0.85
0.10
62.29
265.48
327.77
15.44
51.90
157.13
0.00
209.03

0.30
65.64
0.80
0.10
59.07
262.21
321.29
-6.48
72.12
153.16
0.00
225.27

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
34.843

247.95
15.559

247.95
15.035

247.95
11.245

247.95
22.159

247.95
19.995

247.95
20.854

Aug

Sep

Oct

Nov

Dec

237.00
12.00
31.00
4.15
128.73

307.00
9.00
30.00
3.85
115.54

387.00
13.00
31.00
3.99
123.76

0.00
0.00
30.00
4.04
121.05

402.00
16.00
31.00
4.08
126.42

20.00
12.00
6.00
7.72
121.01

20.00
9.00
9.00
10.40
105.14

20.00
13.00
5.00
6.19
117.57

20.00
0.00
18.00
21.79
121.05

20.00
16.00
2.00
2.53
126.42

115.99
315.99
200.00
0.00
115.99

201.86
401.86
200.00
0.00
201.86

269.43
469.43
200.00
0.00
269.43

-121.05
78.95
78.95
121.05
0.00

275.58
354.53
200.00
0.00
275.58

0.30
34.80
0.80
0.10
31.32
257.03
288.35
-32.94
67.74
81.20
0.00
148.93

0.30
60.56
0.80
0.10
54.50
230.68
285.18
-3.17
63.73
141.30
0.00
205.03

0.10
26.94
0.80
0.10
24.25
228.15
252.39
-32.79
59.73
242.48
0.00
302.21

0.15
0.00
0.95
0.10
0.00
239.77
239.77
-12.62
12.62
0.00
0.00
12.62

0.15
41.34
0.90
0.10
39.27
215.80
255.07
15.29
26.04
234.24
0.00
260.29

247.95
13.787

247.95
19.613

247.95
27.977

247.95
1.207

247.95
24.095

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1993


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

379.00
9.00
31.00
4.41
136.72

91.00
5.00
28.00
3.88
108.54

632.00
14.00
31.00
3.97
123.15

207.00
8.00
30.00
3.76
112.91

207.00
7.00
31.00
4.20
130.34

158.00
3.00
30.00
4.49
134.61

208.00
8.00
31.00
3.45
106.82

20.00
9.00
9.00
12.30
136.72

20.00
5.00
13.00
14.11
108.54

20.00
14.00
4.00
4.93
118.22

20.00
8.00
10.00
11.29
101.61

20.00
7.00
11.00
14.34
116.00

20.00
3.00
15.00
20.19
114.42

20.00
8.00
10.00
10.68
96.14

242.28
442.28
200.00
0.00
242.28

-17.54
182.46
182.46
17.54
0.00

513.78
696.24
200.00
0.00
513.78

105.39
305.39
200.00
0.00
105.39

91.00
291.00
200.00
0.00
91.00

43.58
243.58
200.00
0.00
43.58

111.86
311.86
200.00
0.00
111.86

0.30
72.68
0.92
0.10
69.78
183.08
252.86
53.86
18.83
169.60
0.00
188.42

0.15
0.00
0.80
0.10
0.00
202.29
202.29
-50.57
50.57
0.00
9.10
59.67

0.30
154.13
0.90
0.10
146.43
182.06
328.48
126.20
27.94
359.65
0.00
387.58

0.30
31.62
0.85
0.10
29.24
279.21
308.46
-20.03
51.64
73.77
0.00
125.41

0.30
27.30
0.85
0.10
25.25
262.19
287.44
-21.02
48.32
63.70
0.00
112.01

0.30
13.08
0.85
0.10
12.09
244.32
256.42
-31.02
44.10
30.51
15.80
90.41

0.30
33.56
0.80
0.10
30.20
205.13
235.34
-21.08
54.64
78.30
0.00
132.94

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
17.443

247.95
6.116

247.95
35.879

247.95
11.997

247.95
10.369

247.95
8.648

247.95
12.307

Aug

Sep

Oct

Nov

Dec

118.00
8.00
31.00
4.15
128.73

288.00
10.00
30.00
3.85
115.54

332.00
11.00
31.00
3.99
123.76

372.00
14.00
30.00
4.04
121.05

346.00
13.00
31.00
4.08
126.42

20.00
8.00
10.00
12.87
115.86

20.00
10.00
8.00
9.24
106.29

20.00
11.00
7.00
8.66
115.10

20.00
14.00
4.00
4.84
121.05

20.00
13.00
5.00
6.32
126.42

2.14
202.14
200.00
0.00
2.14

181.71
381.71
200.00
0.00
181.71

216.90
416.90
200.00
0.00
216.90

250.95
450.95
200.00
0.00
250.95

219.58
419.58
200.00
0.00
219.58

0.30
0.64
0.80
0.10
0.58
188.27
188.85
-46.49
47.13
1.50
11.80
60.43

0.30
54.51
0.80
0.10
49.06
151.08
200.14
11.29
43.22
127.19
0.00
170.41

0.10
21.69
0.80
0.10
19.52
160.11
179.63
-20.51
42.20
195.21
0.00
237.41

0.15
37.64
0.95
0.10
36.70
170.65
207.35
27.72
9.92
213.31
0.00
223.23

0.15
32.94
0.90
0.10
31.29
186.62
217.91
10.55
22.38
186.64
0.00
209.03

247.95
5.594

247.95
16.301

247.95
21.977

247.95
21.354

247.95
19.350

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1994


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

263.00
9.00
31.00
4.41
136.72

404.00
10.00
28.00
3.88
108.54

667.00
18.00
31.00
3.97
123.15

327.00
9.00
30.00
3.76
112.91

385.00
10.00
31.00
4.20
130.34

191.00
8.00
30.00
4.49
134.61

26.00
3.00
31.00
3.45
106.82

20.00
9.00
9.00
12.30
136.72

20.00
10.00
8.00
8.68
108.54

20.00
18.00
0.00
0.00
123.15

20.00
9.00
9.00
10.16
102.74

20.00
10.00
8.00
10.43
119.91

20.00
8.00
10.00
13.46
121.15

20.00
3.00
15.00
16.02
90.80

126.28
326.28
200.00
0.00
126.28

295.46
495.46
200.00
0.00
295.46

543.85
743.85
200.00
0.00
543.85

224.26
424.26
200.00
0.00
224.26

265.09
465.09
200.00
0.00
265.09

69.85
269.85
200.00
0.00
69.85

-64.80
135.20
135.20
64.80
0.00

0.30
37.88
0.92
0.10
36.37
183.08
219.45
20.45
17.44
88.40
0.00
105.83

0.15
44.32
0.80
0.10
39.89
175.56
215.45
-4.00
48.32
251.14
0.00
299.46

0.30
163.16
0.90
0.10
155.00
193.90
348.90
133.45
29.70
380.70
0.00
410.40

0.30
67.28
0.85
0.10
62.23
296.56
358.80
9.90
57.38
156.98
0.00
214.36

0.30
79.53
0.85
0.10
73.56
304.98
378.54
19.74
59.78
185.56
0.00
245.34

0.30
20.96
0.85
0.10
19.38
321.76
341.14
-37.40
58.35
48.90
19.10
126.35

0.30
0.00
0.80
0.10
0.00
272.91
272.91
-68.23
68.23
0.00
2.60
70.83

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
9.797

247.95
30.692

247.95
37.992

247.95
20.505

247.95
22.712

247.95
12.086

247.95
6.557

Aug

Sep

Oct

Nov

Dec

154.00
7.00
31.00
4.15
128.73

33.00
2.00
30.00
3.85
115.54

211.00
7.00
31.00
3.99
123.76

346.00
13.00
30.00
4.04
121.05

338.00
14.00
31.00
4.08
126.42

20.00
7.00
11.00
14.16
114.57

20.00
2.00
16.00
18.49
97.05

20.00
7.00
11.00
13.61
110.15

20.00
13.00
5.00
6.05
121.05

20.00
14.00
4.00
5.06
126.42

39.43
174.63
200.00
0.00
39.43

-64.05
135.95
135.95
64.05
0.00

100.85
236.80
200.00
0.00
100.85

224.95
424.95
200.00
0.00
224.95

211.58
411.58
200.00
0.00
211.58

0.30
11.83
0.80
0.10
10.65
218.33
228.98
-43.94
55.77
27.60
15.40
98.77

0.30
0.00
0.80
0.10
0.00
183.18
183.18
-45.80
45.80
0.00
3.30
49.10

0.10
10.09
0.80
0.10
9.08
146.55
155.62
-27.56
37.64
90.77
0.00
128.41

0.15
33.74
0.95
0.10
32.90
147.84
180.74
25.12
8.62
191.21
0.00
199.83

0.15
31.74
0.90
0.10
30.15
162.67
192.82
12.08
19.66
179.84
0.00
199.50

247.95
9.143

247.95
4.696

247.95
11.887

247.95
19.116

247.95
18.468

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1995


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

722.00
22.00
31.00
4.41
136.72

808.00
17.00
28.00
3.88
108.54

596.00
15.00
31.00
3.97
123.15

495.00
12.00
30.00
3.76
112.91

302.00
8.00
31.00
4.20
130.34

174.00
11.00
30.00
4.49
134.61

258.00
11.00
31.00
3.45
106.82

20.00
22.00
-4.00
-5.47
136.72

20.00
17.00
1.00
1.09
108.54

20.00
15.00
3.00
3.69
119.45

20.00
12.00
6.00
6.77
106.13

20.00
8.00
10.00
13.03
117.31

20.00
11.00
7.00
9.42
125.18

20.00
11.00
7.00
7.48
99.34

585.28
785.28
200.00
0.00
585.28

699.46
899.46
200.00
0.00
699.46

476.55
676.55
200.00
0.00
476.55

388.87
588.87
200.00
0.00
388.87

184.69
384.69
200.00
0.00
184.69

48.82
248.82
200.00
0.00
48.82

158.66
358.66
200.00
0.00
158.66

0.30
175.58
0.92
0.10
168.56
183.08
351.64
152.64
22.94
409.70
0.00
432.64

0.15
104.92
0.80
0.10
94.43
281.31
375.74
24.10
80.82
594.54
0.00
675.36

0.30
142.96
0.90
0.10
135.82
338.17
473.98
98.24
44.72
333.58
0.00
378.31

0.30
116.66
0.85
0.10
107.91
402.88
510.80
36.81
79.85
272.21
0.00
352.06

0.30
55.41
0.85
0.10
51.25
434.18
485.43
-25.37
80.77
129.29
0.00
210.06

0.30
14.64
0.85
0.10
13.55
412.61
426.16
-59.27
73.91
34.17
17.40
125.48

0.30
47.60
0.80
0.10
42.84
340.93
383.77
-42.39
89.99
111.06
0.00
201.05

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
40.050

247.95
69.218

247.95
35.021

247.95
33.677

247.95
19.446

247.95
12.004

247.95
18.612

Aug

Sep

Oct

Nov

Dec

483.00
21.00
31.00
4.15
128.73

278.00
9.00
30.00
3.85
115.54

483.00
15.00
31.00
3.99
123.76

525.00
18.00
30.00
4.04
121.05

308.00
19.00
31.00
4.08
126.42

20.00
21.00
-3.00
-3.86
132.59

20.00
9.00
9.00
10.40
105.14

20.00
15.00
3.00
3.71
120.05

20.00
18.00
0.00
0.00
121.05

20.00
19.00
-1.00
-1.26
126.42

350.41
550.41
200.00
0.00
350.41

172.86
372.86
200.00
0.00
172.86

362.95
562.95
200.00
0.00
362.95

403.95
603.95
200.00
0.00
403.95

181.58
381.58
200.00
0.00
181.58

0.30
105.12
0.80
0.10
94.61
307.01
401.62
17.86
87.27
245.29
0.00
332.55

0.30
51.86
0.80
0.10
46.67
321.30
367.97
-33.65
85.51
121.00
0.00
206.51

0.10
36.30
0.80
0.10
32.67
294.38
327.04
-40.93
77.22
326.66
0.00
403.88

0.15
60.59
0.95
0.10
59.08
310.69
369.77
42.73
17.87
343.36
0.00
361.22

0.15
27.24
0.90
0.10
25.88
332.79
358.67
-11.10
38.34
154.34
0.00
192.68

247.95
30.785

247.95
19.755

247.95
37.388

247.95
34.554

247.95
17.837

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1996


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

451.00
17.00
31.00
4.41
136.72

266.00
14.00
28.00
3.88
108.54

372.00
11.00
31.00
3.97
123.15

381.00
14.00
30.00
3.76
112.91

147.00
9.00
31.00
4.20
130.34

377.00
13.00
30.00
4.49
134.61

402.00
12.00
31.00
3.45
106.82

20.00
17.00
1.00
1.37
136.72

20.00
14.00
4.00
4.34
108.54

20.00
11.00
7.00
8.62
114.53

20.00
14.00
4.00
4.52
108.39

20.00
9.00
9.00
11.73
118.61

20.00
13.00
5.00
6.73
127.88

20.00
12.00
6.00
6.41
100.41

314.28
514.28
200.00
0.00
314.28

157.46
357.46
200.00
0.00
157.46

257.47
457.47
200.00
0.00
257.47

272.61
472.61
200.00
0.00
272.61

28.39
228.39
200.00
0.00
28.39

249.12
449.12
200.00
0.00
249.12

301.59
501.59
200.00
0.00
301.59

0.30
94.28
0.92
0.10
90.51
183.08
273.59
74.59
19.69
220.00
0.00
239.69

0.15
23.62
0.80
0.10
21.26
218.87
240.13
-33.46
57.08
133.84
0.00
190.92

0.30
77.24
0.90
0.10
73.38
216.12
289.50
49.37
27.88
180.23
0.00
208.11

0.30
81.78
0.85
0.10
75.65
246.07
321.72
32.22
49.56
190.83
0.00
240.39

0.30
8.52
0.85
0.10
7.88
273.46
281.34
-40.38
48.90
19.87
14.70
83.47

0.30
74.74
0.85
0.10
69.13
239.14
308.27
26.93
47.81
174.39
0.00
222.19

0.30
90.48
0.80
0.10
81.43
246.62
328.05
19.77
70.70
211.11
0.00
281.82

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
22.188

247.95
19.568

247.95
19.265

247.95
22.995

247.95
7.727

247.95
21.255

247.95
26.088

Aug

Sep

Oct

Nov

Dec

489.00
13.00
31.00
4.15
128.73

316.00
12.00
30.00
3.85
115.54

518.00
16.00
31.00
3.99
123.76

447.00
14.00
30.00
4.04
121.05

566.00
16.00
31.00
4.08
126.42

20.00
13.00
5.00
6.44
122.29

20.00
12.00
6.00
6.93
108.61

20.00
16.00
2.00
2.48
121.29

20.00
14.00
4.00
4.84
121.05

20.00
16.00
2.00
2.53
126.42

366.71
566.71
200.00
0.00
366.71

207.39
407.39
200.00
0.00
207.39

396.71
596.71
200.00
0.00
396.71

325.95
525.95
200.00
0.00
325.95

439.58
639.58
200.00
0.00
439.58

0.30
110.01
0.80
0.10
99.01
262.44
361.45
33.40
76.61
256.69
0.00
333.31

0.30
62.22
0.80
0.10
56.00
289.16
345.16
-16.29
78.51
145.18
0.00
223.69

0.10
39.67
0.80
0.10
35.70
276.12
311.83
-33.33
73.00
357.04
0.00
430.04

0.15
48.89
0.95
0.10
47.67
296.24
343.91
32.08
16.81
277.06
0.00
293.87

0.15
65.94
0.90
0.10
62.64
309.52
372.16
28.25
37.69
373.64
0.00
411.33

247.95
30.855

247.95
21.398

247.95
39.810

247.95
28.111

247.95
38.078

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1997


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

306.00
7.00
31.00
4.41
136.72

400.00
14.00
28.00
3.88
108.54

178.00
8.00
31.00
3.97
123.15

103.00
4.00
30.00
3.76
112.91

381.00
16.00
31.00
4.20
130.34

132.00
6.00
30.00
4.49
134.61

289.00
6.00
31.00
3.45
106.82

20.00
7.00
11.00
15.04
136.72

20.00
14.00
4.00
4.34
108.54

20.00
8.00
10.00
12.31
110.83

20.00
4.00
14.00
15.81
97.10

20.00
16.00
2.00
2.61
127.73

20.00
6.00
12.00
16.15
118.45

20.00
6.00
12.00
12.82
94.00

169.28
369.28
200.00
0.00
169.28

291.46
491.46
200.00
0.00
291.46

67.17
267.17
200.00
0.00
67.17

5.90
205.90
200.00
0.00
5.90

253.27
453.27
200.00
0.00
253.27

13.55
213.55
200.00
0.00
13.55

195.00
395.00
200.00
0.00
195.00

0.30
50.78
0.92
0.10
48.75
183.08
231.83
32.83
17.95
118.50
0.00
136.45

0.15
43.72
0.80
0.10
39.35
185.47
224.81
-7.02
50.74
247.74
0.00
298.48

0.30
20.15
0.90
0.10
19.14
202.33
221.47
-3.34
23.49
47.02
17.80
88.31

0.30
1.77
0.85
0.10
1.64
188.25
189.89
-31.58
33.35
4.13
10.30
47.79

0.30
75.98
0.85
0.10
70.28
161.41
231.69
41.80
34.18
177.29
0.00
211.47

0.30
4.06
0.85
0.10
3.76
196.94
200.69
-30.99
35.06
9.48
13.20
57.74

0.30
58.50
0.80
0.10
52.65
160.56
213.21
12.51
45.99
136.50
0.00
182.49

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
12.631

247.95
30.591

247.95
8.175

247.95
4.571

247.95
19.576

247.95
5.523

247.95
16.893

Aug

Sep

Oct

Nov

Dec

166.00
5.00
31.00
4.15
128.73

0.00
0.00
30.00
3.85
115.54

90.00
6.00
31.00
3.99
123.76

437.00
18.00
30.00
4.04
121.05

526.00
18.00
31.00
4.08
126.42

20.00
5.00
13.00
16.73
112.00

20.00
0.00
18.00
20.80
94.74

20.00
6.00
12.00
14.85
108.91

20.00
18.00
0.00
0.00
121.05

20.00
18.00
0.00
0.00
126.42

54.00
254.00
200.00
0.00
54.00

-94.74
105.26
105.26
94.74
0.00

-18.91
86.35
86.35
18.91
0.00

315.95
402.30
200.00
0.00
315.95

399.58
599.58
200.00
0.00
399.58

0.30
16.20
0.80
0.10
14.58
170.56
185.15
-28.06
44.26
37.80
16.60
98.66

0.30
0.00
0.80
0.10
0.00
148.12
148.12
-37.03
37.03
0.00
0.00
37.03

0.10
0.00
0.80
0.10
0.00
118.49
118.49
-29.62
29.62
0.00
9.00
38.62

0.15
47.39
0.95
0.10
46.21
112.57
158.78
40.28
7.11
268.56
0.00
275.67

0.15
59.94
0.90
0.10
56.94
142.90
199.84
41.06
18.87
339.64
0.00
358.52

247.95
9.134

247.95
3.542

247.95
3.575

247.95
26.370

247.95
33.189

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1998


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

269.00
15.00
31.00
4.41
136.72

444.00
12.00
28.00
3.88
108.54

242.00
15.00
31.00
3.97
123.15

312.00
14.00
30.00
3.76
112.91

310.00
12.00
31.00
4.20
130.34

236.00
13.00
30.00
4.49
134.61

364.00
12.00
31.00
3.45
106.82

20.00
15.00
3.00
4.10
136.72

20.00
12.00
6.00
6.51
108.54

20.00
15.00
3.00
3.69
119.45

20.00
14.00
4.00
4.52
108.39

20.00
12.00
6.00
7.82
122.52

20.00
13.00
5.00
6.73
127.88

20.00
12.00
6.00
6.41
100.41

132.28
332.28
200.00
0.00
132.28

335.46
535.46
200.00
0.00
335.46

122.55
322.55
200.00
0.00
122.55

203.61
403.61
200.00
0.00
203.61

187.48
387.48
200.00
0.00
187.48

108.12
308.12
200.00
0.00
108.12

263.59
463.59
200.00
0.00
263.59

0.30
39.68
0.92
0.10
38.10
183.08
221.18
22.18
17.51
92.60
0.00
110.10

0.15
50.32
0.80
0.10
45.29
176.94
222.23
1.05
49.27
285.14
0.00
334.41

0.30
36.76
0.90
0.10
34.93
200.01
234.93
12.70
24.06
85.78
0.00
109.84

0.30
61.08
0.85
0.10
56.50
199.69
256.19
21.26
39.82
142.53
0.00
182.35

0.30
56.24
0.85
0.10
52.03
217.76
269.79
13.60
42.65
131.24
0.00
173.88

0.30
32.44
0.85
0.10
30.00
229.32
259.33
-10.46
42.90
75.69
0.00
118.59

0.30
79.08
0.80
0.10
71.17
207.46
278.63
19.30
59.77
184.51
0.00
244.29

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
10.192

247.95
34.274

247.95
10.169

247.95
17.443

247.95
16.097

247.95
11.344

247.95
22.614

Aug

Sep

Oct

Nov

Dec

469.00
20.00
31.00
4.15
128.73

390.00
21.00
30.00
3.85
115.54

355.00
16.00
31.00
3.99
123.76

378.00
14.00
30.00
4.04
121.05

174.00
12.00
31.00
4.08
126.42

20.00
20.00
-2.00
-2.57
131.30

20.00
21.00
-3.00
-3.47
119.00

20.00
16.00
2.00
2.48
121.29

20.00
14.00
4.00
4.84
121.05

20.00
12.00
6.00
7.59
126.42

337.70
537.70
200.00
0.00
337.70

271.00
471.00
200.00
0.00
271.00

233.71
433.71
200.00
0.00
233.71

256.95
456.95
200.00
0.00
256.95

47.58
247.58
200.00
0.00
47.58

0.30
101.31
0.80
0.10
91.18
222.90
314.08
35.45
65.86
236.39
0.00
302.24

0.30
81.30
0.80
0.10
73.17
251.27
324.43
10.35
70.95
189.70
0.00
260.64

0.10
23.37
0.80
0.10
21.03
259.55
280.58
-43.85
67.22
210.34
0.00
277.57

0.15
38.54
0.95
0.10
37.58
266.55
304.13
23.55
14.99
218.41
0.00
233.40

0.15
7.14
0.90
0.10
6.78
273.72
280.50
-23.63
30.77
40.44
17.40
88.61

247.95
27.979

247.95
24.933

247.95
25.695

247.95
22.327

247.95
8.203

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 1999


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

378.00
19.00
31.00
4.41
136.72

188.00
6.00
28.00
3.88
108.54

609.00
11.00
31.00
3.97
123.15

311.00
8.00
30.00
3.76
112.91

388.00
12.00
31.00
4.20
130.34

160.00
7.00
30.00
4.49
134.61

291.00
7.00
31.00
3.45
106.82

20.00
19.00
-1.00
-1.37
136.72

20.00
6.00
12.00
13.02
108.54

20.00
11.00
7.00
8.62
114.53

20.00
8.00
10.00
11.29
101.61

20.00
12.00
6.00
7.82
122.52

20.00
7.00
11.00
14.81
119.80

20.00
7.00
11.00
11.75
95.07

241.28
441.28
200.00
0.00
241.28

79.46
279.46
200.00
0.00
79.46

494.47
694.47
200.00
0.00
494.47

209.39
409.39
200.00
0.00
209.39

265.48
465.48
200.00
0.00
265.48

40.20
240.20
200.00
0.00
40.20

195.93
395.93
200.00
0.00
195.93

0.30
72.38
0.92
0.10
69.49
183.08
252.57
53.57
18.82
168.90
0.00
187.71

0.15
11.92
0.80
0.10
10.73
202.05
212.78
-39.79
51.71
67.54
18.80
138.05

0.30
148.34
0.90
0.10
140.93
191.50
332.43
119.65
28.70
346.13
0.00
374.83

0.30
62.82
0.85
0.10
58.10
282.56
340.67
8.24
54.58
146.57
0.00
201.15

0.30
79.64
0.85
0.10
73.67
289.57
363.24
22.57
57.07
185.84
0.00
242.91

0.30
12.06
0.85
0.10
11.16
308.75
319.91
-43.33
55.39
28.14
16.00
99.53

0.30
58.78
0.80
0.10
52.90
255.93
308.83
-11.08
69.86
137.15
0.00
207.01

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
17.377

247.95
14.148

247.95
34.699

247.95
19.241

247.95
22.487

247.95
9.521

247.95
19.163

Aug

Sep

Oct

Nov

Dec

287.00
7.00
31.00
4.15
128.73

333.00
8.00
30.00
3.85
115.54

931.00
20.00
31.00
3.99
123.76

358.00
11.00
30.00
4.04
121.05

280.00
20.00
31.00
4.08
126.42

20.00
7.00
11.00
14.16
114.57

20.00
8.00
10.00
11.55
103.98

20.00
20.00
-2.00
-2.48
126.24

20.00
11.00
7.00
8.47
121.05

20.00
20.00
-2.00
-2.53
126.42

172.43
372.43
200.00
0.00
172.43

229.02
429.02
200.00
0.00
229.02

804.76
1004.76
200.00
0.00
804.76

236.95
436.95
200.00
0.00
236.95

153.58
353.58
200.00
0.00
153.58

0.30
51.73
0.80
0.10
46.56
247.06
293.62
-15.21
66.94
120.70
0.00
187.64

0.30
68.70
0.80
0.10
61.83
234.90
296.73
3.11
65.59
160.31
0.00
225.91

0.10
80.48
0.80
0.10
72.43
237.38
309.81
13.08
67.39
724.29
0.00
791.68

0.15
35.54
0.95
0.10
34.65
294.32
328.98
19.16
16.38
201.41
0.00
217.79

0.15
23.04
0.90
0.10
21.89
296.08
317.96
-11.01
34.05
130.54
0.00
164.59

247.95
17.370

247.95
21.610

247.95
73.288

247.95
20.833

247.95
15.237

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2000


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

203.00
11.00
31.00
4.41
136.72

290.00
13.00
28.00
3.88
108.54

315.00
10.00
31.00
3.97
123.15

394.00
18.00
30.00
3.76
112.91

158.00
7.00
31.00
4.20
130.34

238.00
15.00
30.00
4.49
134.61

157.00
9.00
31.00
3.45
106.82

20.00
11.00
7.00
9.57
136.72

20.00
13.00
5.00
5.43
108.54

20.00
10.00
8.00
9.85
113.29

20.00
18.00
0.00
0.00
112.91

20.00
7.00
11.00
14.34
116.00

20.00
15.00
3.00
4.04
130.57

20.00
9.00
9.00
9.61
97.21

66.28
266.28
200.00
0.00
66.28

181.46
381.46
200.00
0.00
181.46

201.71
401.71
200.00
0.00
201.71

281.10
481.10
200.00
0.00
281.10

42.00
242.00
200.00
0.00
42.00

107.43
307.43
200.00
0.00
107.43

59.79
259.79
200.00
0.00
59.79

0.30
19.88
0.92
0.10
19.09
183.08
202.17
3.17
16.72
46.40
0.00
63.11

0.15
27.22
0.80
0.10
24.50
161.73
186.23
-15.94
43.16
154.24
0.00
197.40

0.30
60.51
0.90
0.10
57.49
167.61
225.09
38.86
21.65
141.19
0.00
162.84

0.30
84.33
0.85
0.10
78.00
191.33
269.33
44.24
40.09
196.77
0.00
236.86

0.30
12.60
0.85
0.10
11.65
228.93
240.59
-28.75
41.35
29.40
15.80
86.54

0.30
32.23
0.85
0.10
29.81
204.50
234.31
-6.28
38.51
75.20
0.00
113.71

0.30
17.94
0.80
0.10
16.14
187.45
203.59
-30.72
48.66
41.86
15.70
106.21

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
5.842

247.95
20.231

247.95
15.075

247.95
22.657

247.95
8.011

247.95
10.877

247.95
9.832

Aug

Sep

Oct

Nov

Dec

337.00
15.00
31.00
4.15
128.73

241.00
12.00
30.00
3.85
115.54

478.00
16.00
31.00
3.99
123.76

347.00
18.00
30.00
4.04
121.05

0.00
0.00
31.00
4.08
126.42

20.00
15.00
3.00
3.86
124.87

20.00
12.00
6.00
6.93
108.61

20.00
16.00
2.00
2.48
121.29

20.00
18.00
0.00
0.00
121.05

20.00
0.00
18.00
22.76
126.42

212.13
412.13
200.00
0.00
212.13

132.39
332.39
200.00
0.00
132.39

356.71
556.71
200.00
0.00
356.71

225.95
425.95
200.00
0.00
225.95

-126.42
73.58
73.58
126.42
0.00

0.30
63.64
0.80
0.10
57.28
162.88
220.15
16.56
47.08
148.49
0.00
195.58

0.30
39.72
0.80
0.10
35.75
176.12
211.87
-8.28
48.00
92.68
0.00
140.68

0.10
35.67
0.80
0.10
32.10
169.49
201.60
-10.27
45.94
321.04
0.00
366.98

0.15
33.89
0.95
0.10
33.05
191.52
224.56
22.97
10.93
192.06
0.00
202.98

0.15
0.00
0.90
0.10
0.00
202.11
202.11
-22.46
22.46
0.00
0.00
22.46

247.95
18.105

247.95
13.457

247.95
33.972

247.95
19.417

247.95
2.079

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2001


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

302.00
9.00
31.00
4.41
136.72

323.00
15.00
28.00
3.88
108.54

269.00
11.00
31.00
3.97
123.15

347.00
11.00
30.00
3.76
112.91

197.00
12.00
31.00
4.20
130.34

208.00
8.00
30.00
4.49
134.61

163.00
9.00
31.00
3.45
106.82

20.00
9.00
9.00
12.30
136.72

20.00
15.00
3.00
3.26
108.54

20.00
11.00
7.00
8.62
114.53

20.00
11.00
7.00
7.90
105.00

20.00
12.00
6.00
7.82
122.52

20.00
8.00
10.00
13.46
121.15

20.00
9.00
9.00
9.61
97.21

165.28
365.28
200.00
0.00
165.28

214.46
414.46
200.00
0.00
214.46

154.47
354.47
200.00
0.00
154.47

242.00
442.00
200.00
0.00
242.00

74.48
274.48
200.00
0.00
74.48

86.85
286.85
200.00
0.00
86.85

65.79
265.79
200.00
0.00
65.79

0.30
49.58
0.92
0.10
47.60
183.08
230.68
31.68
17.90
115.70
0.00
133.60

0.15
32.17
0.80
0.10
28.95
184.54
213.50
-17.18
49.35
182.29
0.00
231.64

0.30
46.34
0.90
0.10
44.03
192.15
236.17
22.68
23.67
108.13
0.00
131.80

0.30
72.60
0.85
0.10
67.15
200.75
267.90
31.73
40.87
169.40
0.00
210.27

0.30
22.34
0.85
0.10
20.67
227.72
248.38
-19.52
41.86
52.14
19.70
113.70

0.30
26.06
0.85
0.10
24.10
211.13
235.23
-13.16
39.21
60.80
0.00
100.01

0.30
19.74
0.80
0.10
17.76
188.18
205.95
-29.28
49.02
46.06
16.30
111.38

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
12.368

247.95
23.741

247.95
12.201

247.95
20.114

247.95
10.525

247.95
9.567

247.95
10.310

Aug

Sep

Oct

Nov

Dec

303.00
11.00
31.00
4.15
128.73

374.00
21.00
30.00
3.85
115.54

285.00
18.00
31.00
3.99
123.76

458.00
23.00
30.00
4.04
121.05

219.00
0.00
31.00
4.08
126.42

20.00
11.00
7.00
9.01
119.72

20.00
21.00
-3.00
-3.47
119.00

20.00
18.00
0.00
0.00
123.76

20.00
23.00
-5.00
-6.05
121.05

20.00
0.00
18.00
22.76
126.42

183.28
383.28
200.00
0.00
183.28

255.00
455.00
200.00
0.00
255.00

161.24
361.24
200.00
0.00
161.24

336.95
536.95
200.00
0.00
336.95

92.58
292.58
200.00
0.00
92.58

0.30
54.98
0.80
0.10
49.49
164.76
214.24
8.30
46.69
128.30
0.00
174.98

0.30
76.50
0.80
0.10
68.85
171.39
240.24
26.00
50.50
178.50
0.00
229.00

0.10
16.12
0.80
0.10
14.51
192.20
206.71
-33.54
49.66
145.11
0.00
194.78

0.15
50.54
0.95
0.10
49.28
196.37
245.65
38.94
11.60
286.41
0.00
298.01

0.15
13.89
0.90
0.10
13.19
221.09
234.28
-11.37
25.26
78.69
0.00
103.95

247.95
16.199

247.95
21.905

247.95
18.031

247.95
28.507

247.95
9.623

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2002


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

260.00
20.00
31.00
4.41
136.72

216.00
13.00
28.00
3.88
108.54

219.00
14.00
31.00
3.97
123.15

289.00
17.00
30.00
3.76
112.91

371.00
12.00
31.00
4.20
130.34

3359.00
3.00
30.00
4.49
134.61

120.00
4.00
31.00
3.45
106.82

20.00
20.00
-2.00
-2.73
136.72

20.00
13.00
5.00
5.43
108.54

20.00
14.00
4.00
4.93
118.22

20.00
17.00
1.00
1.13
111.78

20.00
12.00
6.00
7.82
122.52

20.00
3.00
15.00
20.19
114.42

20.00
4.00
14.00
14.95
91.86

123.28
323.28
200.00
0.00
123.28

107.46
307.46
200.00
0.00
107.46

100.78
300.78
200.00
0.00
100.78

177.22
377.22
200.00
0.00
177.22

248.48
448.48
200.00
0.00
248.48

3244.58
3444.58
200.00
0.00
3244.58

28.14
228.14
200.00
0.00
28.14

0.30
36.98
0.92
0.10
35.50
183.08
218.58
19.58
17.40
86.30
0.00
103.69

0.15
16.12
0.80
0.10
14.51
174.87
189.37
-29.21
45.33
91.34
0.00
136.67

0.30
30.23
0.90
0.10
28.72
170.44
199.16
9.78
20.45
70.55
0.00
90.99

0.30
53.17
0.85
0.10
49.18
169.29
218.47
19.31
33.86
124.06
0.00
157.92

0.30
74.54
0.85
0.10
68.95
185.70
254.65
36.18
38.36
173.94
0.00
212.30

0.30
0.30
973.38
8.44
0.85
0.80
0.10
0.10
900.37
7.60
216.45 893.46
1116.82 901.06
862.17 -215.77
111.20 224.21
2271.21 19.70
0.00
12.00
2382.41 255.90

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
9.599

247.95
14.007

247.95
8.424

247.95
15.106

247.95
19.653

247.95
227.896

247.95
23.690

Aug

Sep

Oct

Nov

Dec

172.00
9.00
31.00
4.15
128.73

85.00
6.00
30.00
3.85
115.54

382.00
14.00
31.00
3.99
123.76

492.00
21.00
30.00
4.04
121.05

299.00
18.00
31.00
4.08
126.42

20.00
9.00
9.00
11.59
117.14

20.00
6.00
12.00
13.86
101.67

20.00
14.00
4.00
4.95
118.81

20.00
21.00
-3.00
-3.63
121.05

20.00
18.00
0.00
0.00
126.42

54.86
254.86
200.00
0.00
54.86

-16.67
183.33
183.33
16.67
0.00

263.19
446.52
200.00
0.00
263.19

370.95
570.95
200.00
0.00
370.95

172.58
372.58
200.00
0.00
172.58

0.30
16.46
0.80
0.10
14.81
720.84
735.66
-165.40
181.86
38.40
17.20
237.46

0.30
0.00
0.80
0.10
0.00
588.52
588.52
-147.13
147.13
0.00
8.50
155.63

0.10
26.32
0.80
0.10
23.69
470.82
494.51
-94.02
120.34
236.87
0.00
357.21

0.15
55.64
0.95
0.10
54.25
469.78
524.03
29.53
26.12
315.31
0.00
341.42

0.15
25.89
0.90
0.10
24.59
471.63
496.22
-27.81
53.70
146.69
0.00
200.39

247.95
21.982

247.95
14.887

247.95
33.067

247.95
32.660

247.95
18.551

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2003


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

343.00
21.00
31.00
4.41
136.72

80.00
7.00
28.00
3.88
108.54

326.00
18.00
31.00
3.97
123.15

462.00
19.00
30.00
3.76
112.91

240.00
11.00
31.00
4.20
130.34

276.00
14.00
30.00
4.49
134.61

262.00
13.00
31.00
3.45
106.82

20.00
21.00
-3.00
-4.10
136.72

20.00
7.00
11.00
11.94
108.54

20.00
18.00
0.00
0.00
123.15

20.00
19.00
-1.00
-1.13
114.03

20.00
11.00
7.00
9.12
121.22

20.00
14.00
4.00
5.38
129.22

20.00
13.00
5.00
5.34
101.48

206.28
406.28
200.00
0.00
206.28

-28.54
171.46
171.46
28.54
0.00

202.85
374.31
200.00
0.00
202.85

347.97
547.97
200.00
0.00
347.97

118.78
318.78
200.00
0.00
118.78

146.78
346.78
200.00
0.00
146.78

160.52
360.52
200.00
0.00
160.52

0.30
61.88
0.92
0.10
59.41
183.08
242.49
43.49
18.40
144.40
0.00
162.79

0.15
0.00
0.80
0.10
0.00
193.99
193.99
-48.50
48.50
0.00
8.00
56.50

0.30
60.86
0.90
0.10
57.81
174.59
232.40
38.41
22.44
142.00
0.00
164.44

0.30
104.39
0.85
0.10
96.56
197.54
294.10
61.70
42.69
243.58
0.00
286.27

0.30
35.63
0.85
0.10
32.96
249.99
282.95
-11.15
46.79
83.15
0.00
129.94

0.30
44.03
0.85
0.10
40.73
240.51
281.24
-1.71
45.75
102.74
0.00
148.49

0.30
48.16
0.80
0.10
43.34
224.99
268.33
-12.91
61.06
112.37
0.00
173.43

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
15.070

247.95
5.790

247.95
15.223

247.95
27.384

247.95
12.028

247.95
14.204

247.95
16.055

Aug

Sep

Oct

Nov

Dec

206.00
9.00
31.00
4.15
128.73

281.00
8.00
30.00
3.85
115.54

305.00
17.00
31.00
3.99
123.76

441.00
21.00
30.00
4.04
121.05

508.00
18.00
31.00
4.08
126.42

20.00
9.00
9.00
11.59
117.14

20.00
8.00
10.00
11.55
103.98

20.00
17.00
1.00
1.24
122.52

20.00
21.00
-3.00
-3.63
121.05

20.00
18.00
0.00
0.00
126.42

88.86
288.86
200.00
0.00
88.86

177.02
377.02
200.00
0.00
177.02

182.48
382.48
200.00
0.00
182.48

319.95
519.95
200.00
0.00
319.95

381.58
581.58
200.00
0.00
381.58

0.30
26.66
0.80
0.10
23.99
214.67
238.66
-29.68
56.33
62.20
0.00
118.53

0.30
53.10
0.80
0.10
47.79
190.93
238.72
0.06
53.04
123.91
0.00
176.95

0.10
18.25
0.80
0.10
16.42
190.98
207.40
-31.32
49.57
164.23
0.00
213.80

0.15
47.99
0.95
0.10
46.79
197.03
243.82
36.42
11.57
271.96
0.00
283.53

0.15
57.24
0.90
0.10
54.38
219.44
273.81
29.99
27.24
324.34
0.00
351.59

247.95
10.973

247.95
16.927

247.95
19.792

247.95
27.122

247.95
32.547

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2004


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

216.00
14.00
31.00
4.41
136.72

152.00
12.00
28.00
3.88
108.54

289.00
17.00
31.00
3.97
123.15

186.00
13.00
30.00
3.76
112.91

341.00
17.00
31.00
4.20
130.34

21.00
3.00
30.00
4.49
134.61

284.00
15.00
31.00
3.45
106.82

20.00
14.00
4.00
5.47
136.72

20.00
12.00
6.00
6.51
108.54

20.00
17.00
1.00
1.23
121.91

20.00
13.00
5.00
5.65
107.26

20.00
17.00
1.00
1.30
129.04

20.00
3.00
15.00
20.19
114.42

20.00
15.00
3.00
3.20
103.61

79.28
279.28
200.00
0.00
79.28

43.46
243.46
200.00
0.00
43.46

167.09
367.09
200.00
0.00
167.09

78.74
278.74
200.00
0.00
78.74

211.96
411.96
200.00
0.00
211.96

-93.42
106.58
106.58
93.42
0.00

180.39
286.97
200.00
0.00
180.39

0.30
23.78
0.92
0.10
22.83
183.08
205.91
6.91
16.87
55.50
0.00
72.37

0.15
6.52
0.80
0.10
5.87
164.73
170.60
-35.32
41.83
36.94
15.20
93.98

0.30
50.13
0.90
0.10
47.62
153.54
201.16
30.56
19.57
116.96
0.00
136.53

0.30
23.62
0.85
0.10
21.85
170.98
192.83
-8.32
31.95
55.12
18.60
105.66

0.30
63.59
0.85
0.10
58.82
163.91
222.73
29.89
33.69
148.37
0.00
182.07

0.30
0.00
0.85
0.10
0.00
189.32
189.32
-33.41
33.41
0.00
2.10
35.51

0.30
54.12
0.80
0.10
48.70
151.46
200.16
10.84
43.28
126.27
0.00
169.55

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
6.699

247.95
9.632

247.95
12.638

247.95
10.108

247.95
16.854

247.95
3.397

247.95
15.695

Aug

Sep

Oct

Nov

Dec

98.00
7.00
31.00
4.15
128.73

332.00
21.00
30.00
3.85
115.54

199.00
13.00
31.00
3.99
123.76

391.00
20.00
30.00
4.04
121.05

503.00
24.00
31.00
4.08
126.42

20.00
7.00
11.00
14.16
114.57

20.00
21.00
-3.00
-3.47
119.00

20.00
13.00
5.00
6.19
117.57

20.00
20.00
-2.00
-2.42
121.05

20.00
24.00
-6.00
-7.59
126.42

-16.57
183.43
183.43
16.57
0.00

213.00
396.43
200.00
0.00
213.00

81.43
281.43
200.00
0.00
81.43

269.95
469.95
200.00
0.00
269.95

376.58
576.58
200.00
0.00
376.58

0.30
0.00
0.80
0.10
0.00
160.13
160.13
-40.03
40.03
0.00
9.80
49.83

0.30
63.90
0.80
0.10
57.51
128.10
185.61
25.48
38.42
149.10
0.00
187.51

0.10
8.14
0.80
0.10
7.33
148.49
155.82
-29.79
37.94
73.28
19.90
131.12

0.15
40.49
0.95
0.10
39.48
148.03
187.51
31.69
8.80
229.46
0.00
238.26

0.15
56.49
0.90
0.10
53.66
168.76
222.42
34.91
21.58
320.09
0.00
341.67

247.95
4.613

247.95
17.937

247.95
12.138

247.95
22.791

247.95
31.629

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2005


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

412.00
16.00
31.00
4.41
136.72

416.00
20.00
28.00
3.88
108.54

271.00
16.00
31.00
3.97
123.15

346.00
18.00
30.00
3.76
112.91

307.00
15.00
31.00
4.20
130.34

270.00
18.00
30.00
4.49
134.61

162.00
15.00
31.00
3.45
106.82

20.00
16.00
2.00
2.73
136.72

20.00
20.00
-2.00
-2.17
108.54

20.00
16.00
2.00
2.46
120.68

20.00
18.00
0.00
0.00
112.91

20.00
15.00
3.00
3.91
126.43

20.00
18.00
0.00
0.00
134.61

20.00
15.00
3.00
3.20
103.61

275.28
475.28
200.00
0.00
275.28

307.46
507.46
200.00
0.00
307.46

150.32
350.32
200.00
0.00
150.32

233.10
433.10
200.00
0.00
233.10

180.57
380.57
200.00
0.00
180.57

135.39
335.39
200.00
0.00
135.39

58.39
258.39
200.00
0.00
58.39

0.30
82.58
0.92
0.10
79.28
183.08
262.36
63.36
19.22
192.70
0.00
211.92

0.15
46.12
0.80
0.10
41.51
209.89
251.40
-10.96
57.08
261.34
0.00
318.42

0.30
45.10
0.90
0.10
42.84
226.26
269.10
17.70
27.39
105.22
0.00
132.62

0.30
69.93
0.85
0.10
64.68
228.73
293.42
24.32
45.61
163.17
0.00
208.78

0.30
54.17
0.85
0.10
50.11
249.40
299.51
6.10
48.08
126.40
0.00
174.47

0.30
40.62
0.85
0.10
37.57
254.58
292.16
-7.35
47.97
94.78
0.00
142.75

0.30
17.52
0.80
0.10
15.76
233.73
249.49
-42.67
60.18
40.87
16.20
117.25

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
19.618

247.95
32.636

247.95
12.277

247.95
19.971

247.95
16.151

247.95
13.655

247.95
10.854

Aug

Sep

Oct

Nov

Dec

205.00
15.00
31.00
4.15
128.73

305.00
16.00
30.00
3.85
115.54

383.00
19.00
31.00
3.99
123.76

272.00
16.00
30.00
4.04
121.05

308.00
18.00
31.00
4.08
126.42

20.00
15.00
3.00
3.86
124.87

20.00
16.00
2.00
2.31
113.23

20.00
19.00
-1.00
-1.24
125.00

20.00
16.00
2.00
2.42
121.05

20.00
18.00
0.00
0.00
126.42

80.13
280.13
200.00
0.00
80.13

191.77
391.77
200.00
0.00
191.77

258.00
458.00
200.00
0.00
258.00

150.95
350.95
200.00
0.00
150.95

181.58
381.58
200.00
0.00
181.58

0.30
24.04
0.80
0.10
21.64
199.59
221.23
-28.26
52.30
56.09
0.00
108.39

0.30
57.53
0.80
0.10
51.78
176.98
228.76
7.53
50.00
134.24
0.00
184.24

0.10
25.80
0.80
0.10
23.22
183.01
206.23
-22.53
48.33
232.20
0.00
280.53

0.15
22.64
0.95
0.10
22.08
195.92
217.99
11.77
10.88
128.31
0.00
139.18

0.15
27.24
0.90
0.10
25.88
196.19
222.07
4.08
23.16
154.34
0.00
177.50

247.95
10.034

247.95
17.624

247.95
25.970

247.95
13.314

247.95
16.432

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2006


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

375.00
16.00
31.00
4.41
136.72

249.00
13.00
28.00
3.88
108.54

236.00
11.00
31.00
3.97
123.15

383.00
17.00
30.00
3.76
112.91

339.00
18.00
31.00
4.20
130.34

3408.00
19.00
30.00
4.49
134.61

65.00
5.00
31.00
3.45
106.82

20.00
16.00
2.00
2.73
136.72

20.00
13.00
5.00
5.43
108.54

20.00
11.00
7.00
8.62
114.53

20.00
17.00
1.00
1.13
111.78

20.00
18.00
0.00
0.00
130.34

20.00
19.00
-1.00
-1.35
135.95

20.00
5.00
13.00
13.89
92.93

238.28
438.28
200.00
0.00
238.28

140.46
340.46
200.00
0.00
140.46

121.47
321.47
200.00
0.00
121.47

271.22
471.22
200.00
0.00
271.22

208.66
408.66
200.00
0.00
208.66

3272.05
3472.05
200.00
0.00
3272.05

-27.93
172.07
172.07
27.93
0.00

0.30
71.48
0.92
0.10
68.62
183.08
251.70
52.70
18.78
166.80
0.00
185.57

0.15
21.07
0.80
0.10
18.96
201.36
220.33
-31.38
52.45
119.39
0.00
171.84

0.30
36.44
0.90
0.10
34.62
198.29
232.91
12.59
23.85
85.03
0.00
108.89

0.30
81.37
0.85
0.10
75.26
197.98
273.24
40.33
41.04
189.86
0.00
230.90

0.30
62.60
0.85
0.10
57.90
232.25
290.16
16.92
45.68
146.06
0.00
191.74

0.30
0.30
981.61
0.00
0.85
0.80
0.10
0.10
907.99
0.00
246.63 923.70
1154.63 923.70
864.47 -230.93
117.14 230.93
2290.43
0.00
0.00
6.50
2407.58 237.43

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
17.179

247.95
17.612

247.95
10.080

247.95
22.087

247.95
17.750

247.95
230.304

247.95
21.979

Aug

Sep

Oct

Nov

Dec

20.00
2.00
31.00
4.15
128.73

242.00
5.00
30.00
3.85
115.54

230.00
5.00
31.00
3.99
123.76

503.00
16.00
30.00
4.04
121.05

365.00
18.00
31.00
4.08
126.42

20.00
2.00
16.00
20.60
108.13

20.00
5.00
13.00
15.02
100.52

20.00
5.00
13.00
16.09
107.67

20.00
16.00
2.00
2.42
121.05

20.00
18.00
0.00
0.00
126.42

-88.13
83.93
83.93
88.13
0.00

141.48
225.42
200.00
0.00
141.48

122.33
322.33
200.00
0.00
122.33

381.95
581.95
200.00
0.00
381.95

238.58
438.58
200.00
0.00
238.58

0.30
0.00
0.80
0.10
0.00
738.96
738.96
-184.74
184.74
0.00
2.00
186.74

0.30
42.44
0.80
0.10
38.20
591.17
629.37
-109.59
152.04
99.04
0.00
251.07

0.10
12.23
0.80
0.10
11.01
503.50
514.51
-114.86
127.10
110.09
0.00
237.19

0.15
57.29
0.95
0.10
55.86
488.78
544.64
30.13
27.16
324.66
0.00
351.82

0.15
35.79
0.90
0.10
34.00
490.18
524.17
-20.47
56.25
202.79
0.00
259.05

247.95
17.287

247.95
24.017

247.95
21.957

247.95
33.654

247.95
23.980

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2007


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

310.00
16.00
31.00
4.41
136.72

387.00
14.00
28.00
3.88
108.54

480.00
18.00
31.00
3.97
123.15

506.00
20.00
30.00
3.76
112.91

280.00
15.00
31.00
4.20
130.34

264.00
14.00
30.00
4.49
134.61

289.00
15.00
31.00
3.45
106.82

20.00
16.00
2.00
2.73
136.72

20.00
14.00
4.00
4.34
108.54

20.00
18.00
0.00
0.00
123.15

20.00
20.00
-2.00
-2.26
115.16

20.00
15.00
3.00
3.91
126.43

20.00
14.00
4.00
5.38
129.22

20.00
15.00
3.00
3.20
103.61

173.28
373.28
200.00
0.00
173.28

278.46
478.46
200.00
0.00
278.46

356.85
556.85
200.00
0.00
356.85

390.84
590.84
200.00
0.00
390.84

153.57
353.57
200.00
0.00
153.57

134.78
334.78
200.00
0.00
134.78

185.39
385.39
200.00
0.00
185.39

0.30
51.98
0.92
0.10
49.90
183.08
232.98
33.98
18.00
121.30
0.00
139.29

0.15
41.77
0.80
0.10
37.59
186.39
223.98
-9.00
50.77
236.69
0.00
287.46

0.30
107.06
0.90
0.10
101.70
201.58
303.28
79.31
27.75
249.80
0.00
277.55

0.30
117.25
0.85
0.10
108.46
257.79
366.25
62.96
54.29
273.59
0.00
327.87

0.30
46.07
0.85
0.10
42.62
311.31
353.93
-12.32
58.39
107.50
0.00
165.89

0.30
40.43
0.85
0.10
37.40
300.84
338.24
-15.69
56.12
94.34
0.00
150.47

0.30
55.62
0.80
0.10
50.05
270.59
320.65
-17.59
73.21
129.77
0.00
202.98

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
12.895

247.95
29.462

247.95
25.693

247.95
31.364

247.95
15.357

247.95
14.393

247.95
18.790

Aug

Sep

Oct

Nov

Dec

492.00
15.00
31.00
4.15
128.73

234.00
12.00
30.00
3.85
115.54

285.00
16.00
31.00
3.99
123.76

316.00
16.00
30.00
4.04
121.05

461.00
20.00
31.00
4.08
126.42

20.00
15.00
3.00
3.86
124.87

20.00
12.00
6.00
6.93
108.61

20.00
16.00
2.00
2.48
121.29

20.00
16.00
2.00
2.42
121.05

20.00
20.00
-2.00
-2.53
126.42

367.13
567.13
200.00
0.00
367.13

125.39
325.39
200.00
0.00
125.39

163.71
363.71
200.00
0.00
163.71

194.95
394.95
200.00
0.00
194.95

334.58
534.58
200.00
0.00
334.58

0.30
110.14
0.80
0.10
99.13
256.52
355.64
35.00
75.14
256.99
0.00
332.14

0.30
37.62
0.80
0.10
33.86
284.51
318.37
-37.27
74.89
87.78
0.00
162.67

0.10
16.37
0.80
0.10
14.73
254.70
269.43
-48.94
65.31
147.34
0.00
212.65

0.15
29.24
0.95
0.10
28.51
255.96
284.47
15.04
14.20
165.71
0.00
179.91

0.15
50.19
0.90
0.10
47.68
256.02
303.70
19.23
30.96
284.39
0.00
315.35

247.95
30.746

247.95
15.560

247.95
19.686

247.95
17.210

247.95
29.193

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2008


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

354.00
19.00
31.00
4.41
136.72

437.00
17.00
28.00
3.88
108.54

376.00
18.00
31.00
3.97
123.15

376.00
16.00
30.00
3.76
112.91

213.00
11.00
31.00
4.20
130.34

296.00
12.00
30.00
4.49
134.61

315.00
19.00
31.00
3.45
106.82

20.00
19.00
-1.00
-1.37
136.72

20.00
17.00
1.00
1.09
108.54

20.00
18.00
0.00
0.00
123.15

20.00
16.00
2.00
2.26
110.65

20.00
11.00
7.00
9.12
121.22

20.00
12.00
6.00
8.08
126.53

20.00
19.00
-1.00
-1.07
107.89

217.28
417.28
200.00
0.00
217.28

328.46
528.46
200.00
0.00
328.46

252.85
452.85
200.00
0.00
252.85

265.35
465.35
200.00
0.00
265.35

91.78
291.78
200.00
0.00
91.78

169.47
369.47
200.00
0.00
169.47

207.11
407.11
200.00
0.00
207.11

0.30
65.18
0.92
0.10
62.58
183.08
245.66
46.66
18.53
152.10
0.00
170.62

0.15
49.27
0.80
0.10
44.34
196.53
240.87
-4.79
54.06
279.19
0.00
333.25

0.30
75.86
0.90
0.10
72.06
216.78
288.84
47.98
27.88
177.00
0.00
204.88

0.30
79.61
0.85
0.10
73.64
245.52
319.15
30.31
49.30
185.75
0.00
235.04

0.30
27.53
0.85
0.10
25.47
271.28
296.75
-22.40
49.94
64.25
0.00
114.19

0.30
50.84
0.85
0.10
47.03
252.24
299.27
2.52
48.33
118.63
0.00
166.95

0.30
62.13
0.80
0.10
55.92
239.41
295.33
-3.93
66.07
144.98
0.00
211.05

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
15.795

247.95
34.155

247.95
18.966

247.95
22.484

247.95
10.570

247.95
15.971

247.95
19.537

Aug

Sep

Oct

Nov

Dec

264.00
14.00
31.00
4.15
128.73

176.00
10.00
30.00
3.85
115.54

390.00
21.00
31.00
3.99
123.76

277.00
19.00
30.00
4.04
121.05

451.00
24.00
31.00
4.08
126.42

20.00
14.00
4.00
5.15
123.58

20.00
10.00
8.00
9.24
106.29

20.00
21.00
-3.00
-3.71
127.47

20.00
19.00
-1.00
-1.21
121.05

20.00
24.00
-6.00
-7.59
126.42

140.42
340.42
200.00
0.00
140.42

69.71
269.71
200.00
0.00
69.71

262.53
462.53
200.00
0.00
262.53

155.95
355.95
200.00
0.00
155.95

324.58
524.58
200.00
0.00
324.58

0.30
42.13
0.80
0.10
37.91
236.27
274.18
-21.15
63.28
98.29
0.00
161.57

0.30
20.91
0.80
0.10
18.82
219.34
238.16
-36.02
56.93
48.79
17.60
123.32

0.10
26.25
0.80
0.10
23.63
190.53
214.16
-24.01
50.26
236.27
0.00
286.53

0.15
23.39
0.95
0.10
22.81
203.45
226.26
12.10
11.29
132.56
0.00
143.85

0.15
48.69
0.90
0.10
46.25
203.63
249.89
23.63
25.06
275.89
0.00
300.95

247.95
14.957

247.95
11.797

247.95
26.525

247.95
13.760

247.95
27.860

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2009


No.
1
2
3
4
5

Calculation

Const.

Catchment Precipitation (P.mm/month) (Hujan Wilayah)


Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

Jul

260.00
18.00
31.00
4.41
136.72

285.00
13.00
28.00
3.88
108.54

495.00
18.00
31.00
3.97
123.15

497.00
21.00
30.00
3.76
112.91

144.00
6.00
31.00
4.20
130.34

200.00
10.00
30.00
4.49
134.61

129.00
8.00
31.00
3.45
106.82

20.00
18.00
0.00
0.00
136.72

20.00
13.00
5.00
5.43
108.54

20.00
18.00
0.00
0.00
123.15

20.00
21.00
-3.00
-3.39
116.29

20.00
6.00
12.00
15.64
114.70

20.00
10.00
8.00
10.77
123.84

20.00
8.00
10.00
10.68
96.14

123.28
323.28
200.00
0.00
123.28

176.46
376.46
200.00
0.00
176.46

371.85
571.85
200.00
0.00
371.85

380.71
580.71
200.00
0.00
380.71

29.30
229.30
200.00
0.00
29.30

76.16
276.16
200.00
0.00
76.16

32.86
232.86
200.00
0.00
32.86

0.30
36.98
0.92
0.10
35.50
183.08
218.58
19.58
17.40
86.30
0.00
103.69

0.15
26.47
0.80
0.10
23.82
174.87
198.69
-19.89
46.36
149.99
0.00
196.35

0.30
111.56
0.90
0.10
105.98
178.82
284.80
86.11
25.45
260.30
0.00
285.74

0.30
114.21
0.85
0.10
105.65
242.08
347.73
62.93
51.29
266.50
0.00
317.78

0.30
8.79
0.85
0.10
8.13
295.57
303.70
-44.03
52.82
20.51
14.40
87.73

0.30
22.85
0.85
0.10
21.14
258.14
279.28
-24.42
47.27
53.31
0.00
100.58

0.30
9.86
0.80
0.10
8.87
223.42
232.30
-46.98
56.84
23.00
12.90
92.75

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(27)+(30)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (31)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28

Catchment Area (km2)


Stream Flow (m3/second)

247.95

247.95
9.599

247.95
20.125

247.95
26.452

247.95
30.398

247.95
8.121

247.95
9.621

247.95
8.586

Aug

Sep

Oct

Nov

Dec

49.00
6.00
31.00
4.15
128.73

173.00
8.00
30.00
3.85
115.54

341.00
15.00
31.00
3.99
123.76

489.00
19.00
30.00
4.04
121.05

692.00
21.00
31.00
4.08
126.42

20.00
6.00
12.00
15.45
113.28

20.00
8.00
10.00
11.55
103.98

20.00
15.00
3.00
3.71
120.05

20.00
19.00
-1.00
-1.21
121.05

20.00
21.00
-3.00
-3.79
126.42

-64.28
135.72
135.72
64.28
0.00

69.02
204.73
200.00
0.00
69.02

220.95
420.95
200.00
0.00
220.95

367.95
567.95
200.00
0.00
367.95

565.58
765.58
200.00
0.00
565.58

0.30
0.00
0.80
0.10
0.00
185.84
185.84
-46.46
46.46
0.00
4.90
51.36

0.30
20.70
0.80
0.10
18.63
148.67
167.30
-18.53
39.24
48.31
17.30
104.85

0.10
22.10
0.80
0.10
19.89
133.84
153.73
-13.58
35.67
198.86
0.00
234.53

0.15
55.19
0.95
0.10
53.81
146.04
199.85
46.13
9.07
312.76
0.00
321.82

0.15
84.84
0.90
0.10
80.60
179.87
260.46
60.61
24.23
480.74
0.00
504.97

247.95
4.754

247.95
10.030

247.95
21.711

247.95
30.785

247.95
46.746

PERHITUNGAN KETERSEDIAAN AIR DENGAN METODE FJ. MOCK TAHUN 2010


No.
1
2
3
4
5

Calculation

Const.

Data
Catchment Precipitation (P.mm/month) (Hujan Wilayah)
Catchment Rain Days (n;days)
Days of Month (Hr;days)
Eto (mm/hr)
Epm (mm/month) = HrxEp

Jan

Feb

Mar

Apr

May

Jun

295.00
10.00
31.00
4.41
136.72

325.00
10.00
28.00
3.88
108.54

570.00
21.00
31.00
3.97
123.15

517.00
18.00
30.00
3.76
112.91

472.00
20.00
31.00
4.20
130.34

330.00
16.00
30.00
4.49
134.61

20.00
10.00
8.00
10.94
125.78

20.00
10.00
8.00
8.68
99.86

20.00
21.00
-3.00
-3.69
126.84

20.00
18.00
0.00
0.00
112.91

20.00
20.00
-2.00
-2.61
132.95

20.00
16.00
2.00
2.69
131.91

169.22
369.22
200.00
0.00
169.22

225.14
425.14
200.00
0.00
225.14

443.16
643.16
200.00
0.00
443.16

404.10
604.10
200.00
0.00
404.10

339.05
539.05
200.00
0.00
339.05

198.09
398.09
200.00
0.00
198.09

0.30
50.77
0.92
0.10
48.73
183.08
231.81
32.81
17.95
118.45
0.00
136.40

0.15
33.77
0.80
0.10
30.39
185.45
215.85
-15.97
49.74
191.37
0.00
241.11

0.30
132.95
0.90
0.10
126.30
194.26
320.56
104.72
28.23
310.21
0.00
338.44

0.30
121.23
0.85
0.10
112.14
272.48
384.61
64.05
57.18
282.87
0.00
340.04

0.30
101.72
0.85
0.10
94.09
326.92
421.01
36.40
65.32
237.34
0.00
302.66

0.30
59.43
0.85
0.10
54.97
357.86
412.83
-8.18
67.61
138.66
0.00
206.27

Limited Evapotranspiration (mm/month)


5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Exposed Surface (m;%)


n (number of rain days)
DE/Epm = (m/20)(18-n);(%)
DE (mm/month)
Eactual (mm/month) = Epm - DE
Water Surplus (mm/month)
P-Ea ; (mm/month)
SMS = ISMS+(P-Ea) ; (mm/month)
200.00
Soil Moisture Capacity (mm/month);
ISMC
Soil Storage (mm/month), if P-Ea >= 0,SS=0
Water Surplus (mm/month); [(10)+(13)]
Total Run Off (mm/month)
Infiltration Coefficient (if)
Infiltration (i); (14)x if, (mm/month)
K (monthly flow recession constant)
PF (Percentage Factor)
1/2 x (1+K) x i
K x (Gsom);
199.00
GS (mm/month) ; [36] + [37]
Gsom
DGS = GS - Gsom (mm/month)
Base Flow = i - DGS (mm/month)
Direct Run Off = WS - i (mm/month)
Storm Run Off (mm/month); if P>=200, SRO=0 ; SRO=PxPF
Total Run Off = Bflow + DRO + Storm (mm/month)

27
28
29
30
31

Catchment Area (km2)


Stream Flow (m3/second)
Stream Flow Observation (m3/second)
Mean Relative Error (%)
Mean Absolute Error (m3/second)

247.95

247.95
12.627
12.00

14%
3.10

5%
0.63

247.95
24.712
20.00
24%
4.71

247.95
31.330
26.00
21%
5.33

247.95
32.528
20.00
63%
12.53

247.95
28.018

247.95
19.731

26.00

19.00

8%
2.02

4%
0.73

Jul

Aug

Sep

Oct

Nov

Dec

462.00
20.00
31.00
3.45
106.82

384.00
19.00
31.00
4.15
128.73

458.00
20.00
30.00
3.85
115.54

353.00
19.00
31.00
3.99
123.76

401.00
21.00
30.00
4.04
121.05

351.00
17.00
31.00
4.08
126.42

20.00
20.00
-2.00
-2.14
108.96

20.00
19.00
-1.00
-1.29
130.02

20.00
20.00
-2.00
-2.31
117.85

20.00
19.00
-1.00
-1.24
125.00

20.00
21.00
-3.00
-3.63
124.68

20.00
17.00
1.00
1.26
125.16

353.04
553.04
200.00
0.00
353.04

253.98
453.98
200.00
0.00
253.98

340.15
540.15
200.00
0.00
340.15

228.00
428.00
200.00
0.00
228.00

276.32
476.32
200.00
0.00
276.32

225.84
425.84
200.00
0.00
225.84

0.30
105.91
0.80
0.10
95.32
330.26
425.58
12.76
93.16
247.13
0.00
340.29

0.30
76.19
0.80
0.10
68.58
340.47
409.04
-16.54
92.74
177.79
0.00
270.52

0.30
102.05
0.80
0.10
91.84
327.23
419.07
10.03
92.01
238.11
0.00
330.12

0.15
34.20
0.80
0.10
30.78
335.26
366.04
-53.03
87.23
193.80
0.00
281.04

0.15
41.45
0.95
0.10
40.41
347.74
388.15
22.11
19.34
234.87
0.00
254.21

0.15
33.88
0.90
0.10
32.18
349.33
381.52
-6.63
40.51
191.97
0.00
232.48

247.95
31.501

247.95
25.043

247.95
31.578

247.95
26.016

247.95
24.317

247.95
21.521

30.00

24.00

28.00

26.00

26.00

25.00

5%
1.50

4%
1.04

13%
3.58

0%
0.02

6%
1.68

14%
3.48

Tahun
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010

Jan
11.44
34.84
17.44
9.80
40.05
22.19
12.63
10.19
17.38
5.84
12.37
9.60
15.07
6.70
19.62
17.18
12.89
15.79
9.60
12.63

Debit Andalan Sungai Kalis dari Tahun 1991 s.d 2010 Berdasarkan Metoda F.J Mock
Debit Andalan Sungai Kalis (m3/dt)
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
15.06
12.17
13.20
13.20
6.85
4.30
3.59
6.65
21.48
15.56
15.03
11.25
22.16
20.00
20.85
13.79
19.61
27.98
6.12
35.88
12.00
10.37
8.65
12.31
5.59
16.30
21.98
30.69
37.99
20.51
22.71
12.09
6.56
9.14
4.70
11.89
69.22
35.02
33.68
19.45
12.00
18.61
30.78
19.75
37.39
19.57
19.26
22.99
7.73
21.25
26.09
30.85
21.40
39.81
30.59
8.17
4.57
19.58
5.52
16.89
9.13
3.54
3.58
34.27
10.17
17.44
16.10
11.34
22.61
27.98
24.93
25.69
14.15
34.70
19.24
22.49
9.52
19.16
17.37
21.61
73.29
20.23
15.07
22.66
8.01
10.88
9.83
18.10
13.46
33.97
23.74
12.20
20.11
10.53
9.57
10.31
16.20
21.91
18.03
14.01
8.42
15.11
19.65
227.90
23.69
21.98
14.89
33.07
5.79
15.22
27.38
12.03
14.20
16.05
10.97
16.93
19.79
9.63
12.64
10.11
16.85
3.40
15.70
4.61
17.94
12.14
32.64
12.28
19.97
16.15
13.66
10.85
10.03
17.62
25.97
17.61
10.08
22.09
17.75
230.30
21.98
17.29
24.02
21.96
29.46
25.69
31.36
15.36
14.39
18.79
30.75
15.56
19.69
34.15
18.97
22.48
10.57
15.97
19.54
14.96
11.80
26.52
20.12
26.45
30.40
8.12
9.62
8.59
4.75
10.03
21.71
24.71
31.33
32.53
28.02
19.73
31.50
25.04
31.58
26.02

Nov
19.82
1.21
21.35
19.12
34.55
28.11
26.37
22.33
20.83
19.42
28.51
32.66
27.12
22.79
13.31
33.65
17.21
13.76
30.78
24.32

Dec
39.00
24.10
19.35
18.47
17.84
38.08
33.19
8.20
15.24
2.08
9.62
18.55
32.55
31.63
16.43
23.98
29.19
27.86
46.75
21.52

Nov
1.21
13.31
13.76
17.21
19.12
19.42
19.82
20.83
21.35
22.33

Dec
2.08
8.20
9.62
15.24
16.43
17.84
18.47
18.55
19.35
21.33

Debit Andalan Sungai Kalis dari Tahun 1991 s.d 2010 Berdasarkan Metoda F.J Mock
Diurut dari Terkecil ke Terbesar
Urutan
1
2
3
4
5
6
7
8
9
10

Jan
5.84
6.70
9.60
9.60
9.80
10.19
11.44
11.91
12.37
12.63

Feb
5.79
6.12
9.63
14.01
14.15
15.06
15.56
17.61
19.57
20.12

Mar
8.17
8.42
10.08
10.17
12.17
12.20
12.28
12.64
15.03
15.07

Apr
4.57
10.11
11.25
12.00
13.20
15.11
17.44
19.24
19.97
20.11

May
7.73
8.01
8.12
10.37
10.53
10.57
12.03
13.20
15.36
16.10

Jun
3.40
5.52
6.85
8.65
9.52
9.57
9.62
10.88
11.34
12.00

Jul
4.30
6.56
8.59
9.83
10.31
10.85
12.31
15.70
16.05
16.89

Aug
3.59
4.61
4.75
5.59
9.13
9.14
10.03
10.97
13.79
14.96

Sep
3.54
4.70
6.65
10.03
11.80
13.46
14.89
15.56
16.30
16.93

Oct
3.58
11.89
12.14
18.03
19.69
19.79
21.48
21.71
21.96
21.98

11
12
13
14
15
16
17
18
19
20
n
( n/5)+1
Q80

12.89
15.07
15.79
17.18
17.38
17.44
19.62
22.19
34.84
40.05

20.23
23.74
23.88
29.46
30.59
30.69
32.64
34.15
34.27
69.22

15.22
18.97
19.26
25.69
26.45
31.30
34.70
35.02
35.88
37.99

20.51
22.09
22.48
22.66
22.99
27.38
30.40
31.36
32.48
33.68

16.15
16.85
17.75
19.45
19.58
19.65
22.16
22.49
22.71
27.98

9.80

14.15

12.17

13.20

10.53

12.09
13.66
14.20
14.39
15.97
19.70
20.00
21.25
227.90
230.30
20
5
9.52

18.61
18.79
19.16
19.54
20.85
21.98
22.61
23.69
26.09
31.46

16.20
17.29
17.37
18.10
21.98
25.01
27.98
30.75
30.78
30.85

17.62
17.94
19.61
19.75
21.40
21.61
21.91
24.02
24.93
31.55

25.69
25.97
26.52
26.95
27.98
33.07
33.97
37.39
39.81
73.29

22.79
24.56
26.37
27.12
28.11
28.51
30.78
32.66
33.65
34.55

23.98
24.10
27.86
29.19
31.63
32.55
33.19
38.08
39.00
46.75

10.31

9.13

11.80

19.69

19.12

16.43

Item
Luas DAS S Kalis (Km2)
Analisa Debit Andalan
Luas DAS S Kalis (Km2)
Analisa Debit Andalan

Debit Andalan 80% / Q80 (m3/dt)


Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Analisa Sekarang PT. Aditya Engineering Consultant
247.94
9.80 14.15 12.17 13.20 10.53 9.52 10.31 9.13 11.80
Analisa Terdahulu dari PT. Isuda Parama
354
27.81 16.97 20.76 30.41 18.9 14.15 7.44 5.41 15.52

(m3/dt)
Oct

Nov

Dec

ant
19.69 19.12 16.43

24.55 29.08 23.96

You might also like