Professional Documents
Culture Documents
Enhancing The DILG NCR PPA Line-Up
Enhancing The DILG NCR PPA Line-Up
Current programs and projects (PPs) already have specified major deliverables,
some of which are yet to be complied with. As such, it is impossible to attribute the
success or failure of our PPs on the effectiveness of these said deliverables.
Notwithstanding this, the following other major deliverables may contribute to the
achievement of our desired outcomes:
Outcome Area
Business-friendly and
Competitive LGUs
Environment-Protective,
Climate Change-Adaptive
and Disaster Resilient
LGUs
Major Deliverable
Updating of CLUP and Formulation of
LIIC
Formulation of a Revenue Generation
Plan
Maximum utilization of 5% DRRM Fund
TNA for barangays with assistance from
resource persons from NSWMC and
LLDA
Accountable,
Transparent,
Participative and
Effective Local
Governance
Strengthened Internal
Organizational Capacity
With these in mind, it is necessary to ensure that the LGUs targeted for programs
and projects are assessed based on sound criteria. Assessing LGUs on the following
criteria will ensure that they will receive interventions that suit their needs.
Ideally, all LGUs should be covered by the appropriate programs and projects based
on a comprehensive and critical assessment of their needs to determine the best
way to allocate scarce resources.
In view of the current programs and projects, the following are some steps the
Department can take to sustain our efforts: