Distributed Node B
Integration
Agenda
Distributed NodeB Integration in an Existing UTRAN
Distributed NodeB Integration Testing
Distributed NodeB Integration Additional NSP GUI
Work order creation
NodeB integration to WMS / NSP GUI
Basics Tests
Action
Check for presence of NSP server name and IP address in hosts file
Action
Execute login
NOTE: Use your User ID and Password.
Action
Click on File and open Select Network Layout to open the Layout Selector.
Select the desired layout (use Layout Name) and click View button to open den concerned layout in Navigator.
Double click on concerned layout to open the Resource Browser for the concerned RNC.
Click with right button of mouse on concerned RNC within the Resource Browser to open submenu.
Select Show alarms and right click to open Alarm Manager window.
Check for un-allowed RNC alarms in the Alarm Manager window for the concerned RNC:
NOTE: Un-allowed RNC alarms: Iub alarms
End of procedure
Action
Select target RNC for Node B integration and select Configuration | CM XML | Export NE Grouping
Action
Press Export Now on Export NE Grouping tag.
Send snapshot to data fill team for further processing to generate work order for Node B integration.
NOTE: Network Data Designer (data filler) contact information is required to hand-off
the snapshot (email address). Contact TPM for contact information and planning.
Action
Execute file import of work order into WMS main server by use of file transfer software (e.g. filezilla) to
main server directory:
/opt/nortel/data/cmXML
Verify that the work order has been successfully transferred into the WMS main server under
/opt/nortel/data/cmXML
Action
Click on File and open Select Network Layout to open the Layout Selector.
Select the desired layout (use Layout Name) and click View button to open den concerned layout in
Navigator.
Double click on concerned layout to open the Resource Browser for the concerned RNC.
Click with right button of mouse on concerned RNC within the Resource Browser to open submenu.
Select Show alarms and right click to open Alarm Manager window.
Check for unwanted RNC alarms in the Alarm Manager window for the concerned RNC.
NOTE: Unwanted RNC alarms: Iub alarms of the concerned Node B
Action
Select Configuration | Select MIB | Select Audit to open Action Audit Window
10
Action
Check audit results details by use of Audit Report Window.
Action
Click Add to list button to move work order into right window.
(continued)
Action
Select Summary & Action work sheet and validate session result
NOTE: The status result reflects the status of the work order. The status must match the expected
status results.
10
Expand Actions for <Session> and select RNC/xxx RNCEquipment/0 INode/xxx node
and
activate Validation button
to execute the Validation task.
(continued)
Action
11
12
Press preactivation button to perform Preactivation task on BTSEquipment/xxx and make sure that
it is successfully completed.
13
(continued)
Action
Monitor progress and
ensure successful completion
Action
In NSP open window, select File from the menu bar and select Select Network Layout from drop-down menu.
NOTE: New window Layout Selector opens.
Select from Layout Selector window desired layout and click on Edit button to open the Navigator window.
(Continued)
Action
Press Move To button and select the target layout for move.
NOTE: This operation moves the target Node B from NE Store to the target layout.
Step
Action
Login by using:
Login: nodeB
Password: nodeblnx
Retrieve the Node B serial number which is displayed at the bottom of the TIL GUI:
Read:
.Serial Number: example
Action
Node B Integration Proc 11: Node B OAM link State Change and Activation
Description:
Update of WMS GUI layout with new Node B
Change of administrative state of the Node B OAM link
Activation of physical new Node B
Preconditions:
The Node B must run with the required software version
Node B must be in created and activated state
Node B must be physically connected
Node B IP address
Action
Test connectivity with Node B on OAM link by sending ping command to Node B IP address.
Right click Configuration then select Set NEs`OAM Link Administrative State
Node B Integration Proc 11: Node B OAM link State Change & Activation
(continued)
Action
Monitor the build operation of the system in Command Manager and check for successful completion.
NOTE: The Node B build operation is automatically started after unlock operation
With successful build report after unlocked OAM administrative state the Node B is successfully activated
and ready for testing.
Action
In NSP open window, select File from the menu bar and select Select Network Layout to open Layout
Selector.
Click on Layout Management and then New to open new Window to enter new layout name.
Enter name for new layout NEW Layout and press OK button
NOTE: The new layout name appears in the Layout Selector window.
Action
In NSP open window, select File from the menu bar and select Select Network Layout to open Layout
Selector.
Select from Layout Selector window desired layout and click on Edit button to open the Navigator window.
Action
Select File from menu bar and click on Select Network Layout to open Layout Selector window.
Node B Integration Proc 15: PSU alarm integration in small cabinet (optional)
Description:
Integration and setting of cabinet alarms and PSU alarms for a very specific configuration (in small cabinet)
When to use this procedure :
Outdoor cabinet from Eltek: Small S6 Includes: 9326 d2U V2 or 9926 d2U V3
DC/DC power supply configuration:
DO NOT use this procedure to integrate alarms of an external DC/DC power supply.
Preconditions:
The Node B is already fully integrated
On site work: Rearrangement of external alarms
IMPORTANT: In case of usage of more than 8 external alarm pairs by customer some re-arrangements need to be made.
This re-arrangement is required to be completed prior to the setting and integration of the PSU alarms and are part of
physical installation.
Action
Open layout in WMS with Node B for integration of power supply alarms
Right click on concerned Node B and select Equipment Monitor to open Equipment Monitor.
Node B Integration Proc 15: PSU alarm integration in small cabinet (optional)
External PSU alarm integration in small cabinet Procedure (Continued)
Step
4
Action
Select ExternalAlarm/9 by right click and select
Configuration | Object Editor
Node B Integration Proc 15: PSU alarm integration in small cabinet (optional)
Action
Select ExternalAlarm/11 by right click and select
Configuration | Object Editor
NOTE: Object Editor window opens
10
11
Node B Integration Proc 15: PSU alarm integration in small cabinet (optional)
Action
12
13
Open attribute:
supervisedExternalAlarm and set mask to
xxxxxxx 11110000 xxxxxxxx xxxxxxxx
DO NOT: Do not change values of bytes 1, 3, 4.
14
15
Node B Integration Proc 15: PSU alarm integration in small cabinet (optional)
Integrate the DC surge protection box alarm in small cabinet as described in the action table
Integration sequence:
This procedure will be executed AFTER the mandatory steps of a new Node B integration are successfully done.
NOTE: DC surge protection box is optional. Integration of alarm is only required if present
DC surge protection box alarm integration procedure small cabinet (optional) Procedure
Step
Action
Set the field alarm message to Small S6 PSU Alarm = DC Surge Protection Box Failure (RRH1 to RRH3)
Action
Open layout in WMS with Node B for integration of power supply alarms
Right click on concerned Node B and select Equipment Monitor to open Equipment Monitor.
Action
Select ExternalAlarm/9 by right click and select
Configuration | Object Editor
Action
Select ExternalAlarm/11 by right click and select
Configuration | Object Editor
NOTE: Object Editor window opens
10
11
Action
12
13
Open attribute:
supervisedExternalAlarm and set mask to
xxxxxxx 11110000 xxxxxxxx xxxxxxxx
DO NOT: Do not change values of bytes 1, 3, 4.
14
15
DC surge protection box alarm integration procedure medium cabinet (optional) Procedure
Step
Action
Set the field alarm message to Medium PSU Alarm = DC Surge Protection Box Failure (RRH1 to RRH3)
Set the field alarm message to Medium PSU Alarm = DC Surge Protection Box Failure (RRH4 to RRH6)
Distributed Node B
Integration Testing
Action
Set cursor on the RNC NE and click on the right mouse button to open pull-down menu
Check that no FDD cells of the integrated Node B are in the alarm manager window and display an
unexpected Node B alarm.
NOTE: Use Node B NeID to identify Node B alarms of Node B under integration.
Action
Right click in Layout on concerned RNC (Node B under test is connected there) to open sub-menu
RESULT: The Set Administrative State Action Window opens for selected FDD cell.
4
Monitor successful execution of Lock command in Command Manager window by selecting logs
RESULT: Selected FDD cell is locked (and therefore no call can be made through this cell)
Action
Right click in Layout on concerned RNC (Node B under test is connected there) to open sub-menu
RESULT: The Set Administrative State Action Window opens for selected FDD cell.
4
Monitor successful execution of Unlock command in Command Manager window by selecting logs
RESULT: Selected FDD cell is unlocked
Verify with integrator that all FDD cells not under call test are locked and FDD cell under test is unlocked.
Verify that the ON SITE engineer is well positioned for the CS call test of the dedicated sector (FDD cell) under
test.
Perform audio (CS) call to pre-defined subscriber to test audio connection both ways is working through
unlocked FDD cell by on-site engineer.
NOTE: Call is successful if connection is made and audio is understandable at both ends.
IMPORTANT: After finalization of all communication tests all FDD cells of the Node B under communication testing
have to be unlocked.
54 | Distributed Node B Integration Testing | July 2014
Verify with integrator that all FDD cells not under call test are locked and FDD cell under test is unlocked.
IMPORTANT: After finalization of all communication tests all FDD cells of the Node B under communication testing
have to be unlocked.
(Continued)
Verify with integrator that all FDD cells not under call test are locked and FDD cell under test is unlocked.
Perform FTP transfer (UL) to pre-defined FTP server and check UL throughput is within acceptable ranges.
NOTE: Available file transfer tools which allow validation of throughput must be used (e.g. filezilla).
IMPORTANT: For validation of PS interfaces: One FTP per RNC is sufficient.
Perform FTP transfer (DL) of previously uploaded file from pre-defined FTP server and check DL throughput is
within acceptable ranges.
NOTE: Available file transfer tools which allow validation of throughput must be used (e.g. filezilla).
IMPORTANT: For validation of PS interfaces: One FTP per RNC is sufficient.
(Continued)
IMPORTANT: After finalization of all communication tests all FDD cells of the Node B under communication testing
have to be unlocked.
Action
Open door of Small or Medium Cabinet to trigger Door Alarm (Site Engineer)
Close door of Small or Medium Cabinet to remove alarm condition (Site Engineer)
Validate that the Door Alarm has disappeared at WMS in OMC alarm view
Node B Integration Testing - Proc 7: External PSU alarms test medium cabinet
(Optional)
Description:
This test is the validation that an external PSU alarm of the medium cabinet is displayed at the OMC when they occur
Tested Configuration
IMPORTANT: This test has only to be performed in case of d2U or d4U inside the Medium Outdoor cabinet (Md4 or Md6)
Preconditions:
Integrated Node B: Medium Outdoor cabinet (Md4 or Md6)
Integration of external PSU alarms have been done
Site engineer at Node B site to trigger alarms
Test Sample
It is economically not feasible to test all power alarms. Simplest and quick validation can be done by checking the AC mains Alarm
IMPORTANT: This test can only to be performed in case of charged backup batteries are present.
Node B Integration Testing - Proc 7: External PSU alarms test medium cabinet
cabinet (Optional) (Continued)
External PSU alarms test medium cabinet Procedure AC Mains Alarm
Step
Action
Switch off the AC customer breaker (which supplies the Small or Medium Cabinet) to trigger Medium PSU
ALARM = AC Mains Alarm PSU (Site Engineer)
IMPORTANT: Do not leave AC customer breaker open for longer than 10 min (max) to avoid full discharge of
batteries
Verify occurrence of
Medium PSU ALARM = AC Mains Alarm PSU.
Switch on the AC customer breaker (which supplies the Small or Medium Cabinet) to remove alarm condition
(Site Engineer)
Validate that the Medium PSU ALARM = AC Mains Alarm PSU has disappeared at WMS in OMC alarm view.
Distributed Node B
Integration
Additional NSP GUI
PC Folder
WMS Folder:
/opt/nortel/data/cmXML/
Integration
From NSP go to Configuration / Session manager
A session window will be opened => click on Create new session
Integration
Select the Workorder of the dedicated Node B and click on Add to list then next
Integration
Click on Launch
Integration - Validation
Follow each step of Action window (Validation, Pre-activation, Activation)
Step 1 : VALIDATION
Integration - Preactivation
Step 2 : PRE-ACTIVATION
Integration - Activation
Step 3 : ACTIVATION
Integration NE store
From NSP go to File / Select Network Layout Click on the Layout Name then Edit.
Integration - NE Store
Open the Layout and click on NE store. Then, click on find
NE Store
NodeB : MONTREUIL
Inrtegration NE Store
Select the NE (NodeB MONTREUIL) from the list and click on Move to and select the Layout
Integration - NE Store
Node B MONTREUIL is seen in the Layout
Node B MONTREUIL
Is seen in the Layout
Integration
From NSP go to File / Select Network Layout click on the layout and then View
Integration - Neid
From NSP open the layout. Select the NodeB, right click / configuration / Object editor
Integration - Neid
Object editor opened. Select the attribute NeId, Enter the correct value ( The same with the NodeB site)
Enter the new value and apply it by clicking Set and Apply all changes
Integration
From NSP open the layout where the NodeB is integrated. Select the NodeB, right click / configuration /
set NEs OAM Link Administrative State
Integration
Click on Unlock
Integration
After few minute the Node B is supervised (appears in Red).
Check all alarms and perform some basic tests (CS & PS calls)