Name of project:
Appropriation:
Location:
Source of Fund
RUBY U. GERONIMO
Starting Date:
Upon Approval
Area:
Description
20.00 sq. m.
Quantity
Unit
I. EARTHWORKS:
a) Excavation
II. CONCRETE WORKS:
3.84
cu. m.
7.30
cu.m.
1.15
cu.m.
Portland Cement
9.00
bags
265.00
Fine Aggregates
0.58
cu.m.
400.00
Coarse Aggregates
1.15
cu.m.
400.00
8.00
pcs.
225.00
1.00
kg.
100.00
1.50
cu.m.
12.00
bags
265.00
Fine Aggregates
0.75
cu.m.
400.00
Coarse Aggregates
1.50
cu.m.
400.00
16.00
pcs.
420.00
24.00
pcs.
150.00
4.00
kgs.
100.00
1.75
cu. m.
a) Footing. (0.80mx0.80mx0.3m) - 6
Materials:
b) Column (0.25mx0.25mx4m) - 6
Materials:
Portland Cement
14.00
bags
265.00
Fine Aggregates
1.00
cu. m.
400.00
Coarse Aggregates
2.00
cu. m.
400.00
20.00
pcs.
420.00
28.00
pcs.
150.00
5.00
kgs.
100.00
0.90
cu.m.
Portland Cement
7.00
bags
265.00
Fine Aggregates
0.45
cu.m.
400.00
Coarse Aggregates
0.90
cu.m.
400.00
20.00
pcs.
225.00
25.00
pcs.
150.00
5.00
kgs.
100.00
2.00 cu. m.
Portland Cement
16.00 bags
265.00
Fine Aggregates
1.00 cu. m.
400.00
Coarse Aggregates
2.00 cu. m.
400.00
20.00 pcs.
150.00
2.00 kgs.
100.00
Materials Cost
40.00
sq. m.
500.00
pcs.
10.00
32.00
bags
265.00
a) CHB Laying
Materials:
4" Concrete Hollow Blocks
Portland Cement
Fine Aggregates
10mm dia. RSB
#16 Annealed Tie Wire
2.00
cu.m.
400.00
29.00
pcs.
150.00
2.00
kgs.
100.00
Material Cost
28.00
bd. ft.
33.00
16.00
bd. ft.
33.00
2"x6"x14' - 2 pcs.
28.00
bd. ft.
33.00
16.00
bd. ft.
33.00
20.00
bd. ft.
33.00
b) Bottom Chord
c) Collar Plate
2"x6"x10' - 2 pcs.
2. PURLINS
2"x2"x12' - 25
100.00
bd. ft.
33.00
5.00
kgs.
80.00
Material Cost
V. TINNERY WORKS:
28.13 sq. m.
Materials:
G.I. Corr. Sheets Gauge 50
L=10' - 10 pcs.
L=9' - 10 pcs.
Standard Gutter
52.00
52.00
10.00 pcs.
265.00
Ridge Roll
3.00 pcs.
265.00
Roofing Nails
3.00 kgs.
120.00
Material Cost
52.00
bd. ft.
33.00
4'x8'x1/4"thk.
5.00
pcs.
380.00
6.00
kgs.
b) Plywood
c) Common Wire Nail
Assorted C.W.N.
80.00
Material Cost
Prepared By:
Approved By:
RUBY U. GERONIMO
Owner
Amount (P)
Labor Only
2,385.00
232.00
460.00
1,800.00
100.00
3,180.00
300.00
600.00
6,720.00
3,600.00
400.00
3,710.00
400.00
800.00
8,400.00
4,200.00
500.00
1,855.00
180.00
360.00
4,500.00
3,750.00
500.00
4,240.00
400.00
800.00
3,000.00
200.00
57,572.00
5,000.00
8,480.00
800.00
4,350.00
200.00
18,830.00
924.00
528.00
924.00
528.00
660.00
3,300.00
400.00
7,264.00
5,200.00
4,680.00
2,650.00
795.00
360.00
13,685.00
1,716.00
1,900.00
480.00
4,096.00
101,447.00
29,553.00
131,000.00
RUBY U. GERONIMO
Owner
Location:
Appropriation:
131,000.00
Type of Project:
Construction
Source of Fund:
RUBY U. GERONIMO
Starting Date:
Upon Approval
Description of Work
% of
To be Done
Total
Laborer/Equipment Needed
Description
I. EARTHWORKS:
1- Constn Foreman
4-Mason
4-Carpenters
10-Laborers
Err:509
Item
Description
Quantity
Unit
Estimated
No.
Cost
I. EARTHWORKS:
3.84
cu. m.
7.30
cu. m.
40.00
cu. m.
Err:509
sq. m.
Cost
% of
(P)
Total
Err:509
TOTAL
Breakdown of Estimated
Expenditures
Labor Skilled (m-d)
29,553.00
Unskilled (m-d)
Materials
Err:509
Mobilization
VAT
Equipment Rentals
Mark-up
Prepared by:
Err:509
Draftsman I
Municipal Engineer
Approved by:
VIOLETA V. UNITE
Municipal Mayor
ORK
Available
Cost of
Work
Labor Only
57,572.00
18,830.00
7,264.00
Err:509
Err:509
Err:509
AL ESTIMATED COST:
unicipal Engineer
Err:509