Professional Documents
Culture Documents
Fs Pp07 Badi MFBF Mf42n
Fs Pp07 Badi MFBF Mf42n
Fs Pp07 Badi MFBF Mf42n
Ltd.
Project
Name:
Document
Name:
Document
ID:
Prepared by:
JP_FS01_ PP
Anupam Sharma
Reviewed
by:
Approved
by:
Released by:
Version
:
Date:
Contact
No.
Contact
No.
Contact
No.
Contact
No.
1.0
12.12.20
08
Date:
Date:
Date:
Revision History
SR.
NO.
VERSION
NO.
DATE OF
REVISION
SECTION
NUMBER
V1.0
DESCRIPTION
OF CHANGE
REASON
FOR
CHANGE
CHANGE
MADE BY
REVIEWED
BY
Document
Creation
Page 1 of 6
Confidential Document
Copyright - SISL
PP
Production
Planning
F. Spec ID
General Requirements
Sr No
Topics
1.1
Functionality Description
1.2
1.3
Development Plan
Required Start Date of Development Required End Date of DevelopmentTesting / Validation Plan
Required Start Date of Testing Required End Date of TestingAvailability of Test Data : Available.
Risk Assessment
Sr No
Topics
2.1
Impact of this Development
During the confirmation of production future date will not be allowed by the system
and. for packed goods confirmation the consumption of Bags should be allowed
only from storage location BS02.
2.2
2.3
Page 2 of 6
Confidential Document
Copyright - SISL
3.2
3.3
Processing Requirements
Output Requirements :
Page 3 of 6
Confidential Document
Copyright - SISL
3.4
Authorizations
As per Authorization matrix
Test Plan
Sr No
Topics
4.1
Input Data per field of screen
Material Code :
4.2
Production Planning
Finished Goods Reports
Page 4 of 6
Core Team
Member
Project
Manager
Mr .Sunil
Joshi
Confidential Document
Copyright - SISL
Page 5 of 6
Confidential Document
Copyright - SISL