KP-00+++-CQ712-B7363-Electrical Works (Switchyard Earthing Installation Works)
KP-00+++-CQ712-B7363-Electrical Works (Switchyard Earthing Installation Works)
TOTAL 3 PAGES
(Including Cover)
PROJECT NAME
Purpose
DOCUMENT NO.
: KP-00+++-CQ712-B7363
For Information
TITLE
OWNER
For Review
For Approval
For Construction
As-Built
24.04.2015
For Construction
DE
AY
08.04.2015
First Issue
DE
AY
PREPARED
CHECKED
REVIEWED
APPROVED
Rev.
No.
DATE
DESCRIPTION
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
ITP No.
Item Name
No.
Earthing
Application
Document/Code/Spec.
Supplier/
No.
KP-00+++-CQ712-B7363
Rev. No.
Page
1/1
Document Submittal
Remarks
Inspection Status
Subcontractor
GAMA
Owner
1.1
Receiving
Inspection
1.2
Package List
Assembly Catalog
1.3
Survey works
1.4
Excavation
Checking excavations
1.5
Construction of
grid copper
structure
Checking of construction
1.6
Earthing System
Resistance Test
1.7
Site Construction
Dossier
Notes) #1 CL (Check List) form of Earthing Erection is submitted as attachment of this ITP.
Legend
SIEMENS
P
H
W
S
V
R
Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review
Num
.
Identification
Survey Works
a.
b.
Depth of Excavations
Accept
Reject
N/A
Signature
Comments
Subcontractor
a.
Wire Type
b.
c.
d.
e.
GAMA
POSCO
Employer
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
GAMA
Employer