PROJECT NAME
Purpose
DOCUMENT NO.
: KP-00+++-CQ712-B7361
For Information
TITLE
OWNER
For Review
For Approval
For Construction
As-Built
04.03.2015
DE
AY
26.02.2015
First Issue
DE
AY
PREPARED
CHECKED
REVIEWED
APPROVED
Rev.
No.
DATE
DESCRIPTION
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
ITP No.
Item Name
No.
Cable Tray
Application
Document/Code/Spec.
Supplier/
No.
KP-00+++-CQ712-B7361
Rev. No.
Page
1/1
Document Submittal
Remarks
Inspection Status
Subcontractor
GAMA
Owner
1.1
Receiving
Inspection
1.2
Package List
Assembly Catalog
1.3
Assembly and
fixing
1.4
Final Inspection
1.5
Site Construction
Dossier
Notes) #1 CL (Check List) form of Cable Tray Erection is submitted as attachment of this ITP.
Legend
SIEMENS
P
H
W
S
V
R
Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review
Identification
a.
b.
Accept
Reject
N/A
Signature
Comments
Subcontractor
Final Inspection
a.
Touch-up
b.
Visual check
GAMA
POSCO
Employer
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
Name:
Date:
Sign:
GAMA
POSCO