Professional Documents
Culture Documents
JSARA - Ligntning Protection Installation Works
JSARA - Ligntning Protection Installation Works
Rating
Single fatality or Permanent Total Disability: From an accident Major Damage: Partial operation loss (2 weeks shutdown
or Occupational illness (poisoning, cancer)
coasts up to $150.000 from $50.000)
Major injury, lost time accident >3 days. e.g. falling from
height.
Minor Damage: Brief dis-ruption (coast less than $5.000 from Minor leak/spill. Public concern. No lasting effect. e.g. condensate
$500)
leak from road tanker.
Slight leak. Spill minimal. Effect contained locally. e.g. leak from a
chemical drum.
Consequence
2 3 4 5
Injury
Multiple fatalities: From an accident or Occupational illness
(poisoning, cancer)
10 15 20 25
12 16 20
12 15
10
Likelihod
Likelihood Rating Guidance Description
Likelihood Guidance
Certain or Imminent
Harm from a hazard is certain or imminent if no control measures are provided at all and/or if one or more of the following factors also apply:a) the hazard is a cause of large numbers of injuries or ill health in national or location statistics e.g. cholera epidemic;
b) people are exposed to the hazard continuously e.g. noise level above 85 dB;
c) safety is not considered high priority by those involved including manager and supervisors. e.g. non adherence to PTW.
Rating
Very Likely
Harm is very likely if the control measures provided depend on an individual using them on every occasion (e.g. personal protective equipment, PTW system) or if training and supervision are
minimal, and/or if one or more of the above factors are present.
Likely
Harm is likely if the control measures provided depend on an individual using them or adjusting them on every occasion (e.g. portable gas detectors, safe working procedures), or if training is
provided and work supervised, and/or if any of the factors given for certain or imminent harm also apply.
May Happen
Harm may happen if control measures include measures that do not depend on the operator but can break down or be removed or defeated (e.g. pressure safety valve), or if there is no defined
system of maintenance or supervision of the control measures. Other factors include hazards, which are a significant cause of injury or ill health, or those to which a number of people are often
exposed.
Unlikely
The circumstances under which harm may happen will reduce to harm being unlikely if there is a defined system of supervision and maintenance, or if training is provided and repeated regularly.
Other factors making harm unlikely include hazards which are a cause of few injuries or cases of ill health, or those to which a few people are occasionally exposed.
JOB STEP
Initial Risk
POTENTIAL HAZARD
(List the steps required to perform the (Against each step list the potential / risk hazards that
task in the sequence they are carried
could cause injury / damage when the task step is
out.)
erformed.)
Pre-Commencement
Activities
1.1
Transporting of materials to
site.
2.1
Control
Responsibility
Residual Risk
L
BKEM TELEKOM
BKEM TELEKOM
BKEM TELEKOM
12
Speeding.
2.3
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
2.2
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
16
Struck by Vehicle
12
JOB STEP
Initial Risk
POTENTIAL HAZARD
(List the steps required to perform the (Against each step list the potential / risk hazards that
task in the sequence they are carried
could cause injury / damage when the task step is
out.)
erformed.)
Unloading Materials to
working area
3.1
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Risk
L
BKEM TELEKOM
BKEM TELEKOM
BKEM TELEKOM
16
3.2
3.3
20
12
Page 3
JOB STEP
POTENTIAL HAZARD
(List the steps required to perform the (Against each step list the potential / risk hazards that
task in the sequence they are carried
could cause injury / damage when the task step is
out.)
erformed.)
3
12
Initial Risk
C
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
BKEM
TELEKOM
Control
Responsibility
1 3
Residual Risk
L
Page 4
JOB STEP
POTENTIAL HAZARD
(List the steps required to perform the (Against each step list the potential / risk hazards that
task in the sequence they are carried
could cause injury / damage when the task step is
out.)
erformed.)
3.4
3.5
Risk
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
12
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Residual Risk
L
BKEM TELEKOM
BKEM TELEKOM
Page 5
JOB STEP
Initial Risk
POTENTIAL HAZARD
(List the steps required to perform the (Against each step list the potential / risk hazards that
task in the sequence they are carried
could cause injury / damage when the task step is
out.)
erformed.)
4.1
Risk
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Risk
L
16
4.2
16
BKEM TELEKOM
Page 6
JOB STEP
Initial Risk
POTENTIAL HAZARD
(List the steps required to perform the (Against each step list the potential / risk hazards that
task in the sequence they are carried
could cause injury / damage when the task step is
out.)
erformed.)
Working at Height
5.1
Risk
Slipping / Falling
Control Measures
(Control measures have been identified using the Hierarchy of
Control
Responsibility
Control
Elimination ->Substitution ->Engineering -> Admin -> PPE)
Residual Risk
L
BKEM TELEKOM
BKEM TELEKOM
20
5,1,4 All equipments must be suitable for
purpose, and must be checked before
use (safety harness, foot, hand, head,
eye protection equipments and high
visibilty equipment)
5.2
Falling objects
3
12
Page 7
ER MHENDSLK VE TAAHHT A. .
rmal Power Plant Units 1&2
Ligntning Protection Installation Works
Residual Risk
Risk
Page 8
ER MHENDSLK VE TAAHHT A. .
rmal Power Plant Units 1&2
Ligntning Protection Installation Works
Residual Risk
Risk
Page 9
ER MHENDSLK VE TAAHHT A. .
rmal Power Plant Units 1&2
Ligntning Protection Installation Works
3
Residual Risk
Risk
Page 10
ER MHENDSLK VE TAAHHT A. .
rmal Power Plant Units 1&2
Ligntning Protection Installation Works
Residual Risk
Risk
Page 11
ER MHENDSLK VE TAAHHT A. .
rmal Power Plant Units 1&2
Ligntning Protection Installation Works
Residual Risk
Risk
Page 12
ER MHENDSLK VE TAAHHT A. .
rmal Power Plant Units 1&2
Ligntning Protection Installation Works
Residual Risk
Risk
Page 13