Bridge 008 - RUB Bridge No 6 Rev. C Span Changed
Bridge 008 - RUB Bridge No 6 Rev. C Span Changed
Name Of Bridge
008/010
Bridge No 6 for Metro at Metro Ch 5344m
Bridge No 7 for Metro at Metro Ch 5463m
Design Note No
Revision
Date
Revsions
A
Date
Description
20-Aug-12 First Issue
Title
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Pile Cap)
Part No
Designed By
Checked By
1
PK
MSK
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
INTRODUCTION
This design note pertains to Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Pile Cap) for Bridge no. 6 at Metro chainage 5.344 km and Bridge no. 7 at
Metro chainage 5.463 kmfor the Project DESIGN AND CONSTRUCTION OF VIADUCT AND STATIONS (EXTENSION OF NORTH SOUTH CORRIDOR FROM NOAPARA TO
DAKSHINESHWAR)
1.1
Superstructure
The superstructure consists of Girder and slab of single 30.000m span. Rails are placed over each girder. Superstructure is resiting on bearings.
The reactions due to dead load, Superimposed dead load and Live load is calculated as per STAAD analysis.
1.2
Foundation
The piling system comprises of 6 Nos of Bored cast in situ pile of 1.2m dia each at each abutment location. For details refer drawing no. 290784/RVNL/ST/2010 for bridge no.6 and
290784/RVNL/ST/2013 for Bridge No 7
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
2.0 DATA
0.200
11.598
###
m
m
12.000
m
m
m
m
0.300
###
###
12.000
11.598
9.448
7.322
9.143
7.343
-17.657
###
Rail Level
Deck Top Level at Cl of Deck
Deck Soffit Level
Ground Level
Pile Cap Top Level
Pile Cap Bottom Level
Founding Level
Rail Level
###
2.1 Levels
2.2 Dimensions
0.300
2.2.2
Substructure
Assumed Bearing Thk
Pedestal Height
Pedestal Dimension in Long Dir
Pedestal Dimension in Transverse Dir
0.800
9.143
1.000
0.860
###
0.402 m
0.200 m
11.000
1.950 m
As shown in Fig 2.
28.300 m
0.020 m
0.840 m
1.045 m
1.105 m
7.343
GL
7.268
0.900
###
2.2.1
Superstructure
Difference in Rail Level and Deck top at edge
Deck Slab thickness
Deck Widgth
Precast Post-Tension Girder Depth
Spacing Of Girders
Span C/C of Bearings
Expansion Gap
Deck Ovehang
Walkway Width
Parapet Height
0.070
0.235
0.800
0.800
m
m
m
m
3.600
1.200
-17.657
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
1.860
1
4
Transverse Direction
###
0.800
###
Longitudinal Direction
HL
5
###
###
ML
MT
HT
###
###
0.800
1.200
0.800
1.8
0.900
3.600
2
5.400
m
m
m
m
5.400
3
###
2.2.3
Foundation
Pile Cap Thickness
Pile Edge Dist in Longitudinal Direction
Pile Spacing in Longitudianal Direction
Nr of Piles in Longitudinal Direction
Length of Cap in Longitudinal Direction
###
2.455
0.200
0.300
1.860
Sheet
0.3
###
Date
0.300
0.800
2.455 m
0.200 m
0.300 m
3.240
HB
###
m
m
m
m
m
m
m
m
m
File No.
###
2.455
11.000
0.300
0.860
0.690
0.300
0.300
0.300
0.300
0.200
###
MGC
SB
Date
Fig. 1 Elevation of Abutment From Side
###
Calculations
for
1.000
3.240
0.300
0.860
DATA Page 5 of 365
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
1.900 m
3.600 m
3
11.000 m
Dia of Piles
Length of Pile
1.200 m
25.000 m
2.3
2.3.1
Concrete
MGC
File No.
HB
Date
SB
Date
0.900
3.600
Fig. 2 Plan of Abutment at Pedestal Level
Sheet
0.900
0.200
2.5 T/m3
fck
60 Mpa
36000 Mpa
M60
35 Mpa
29500 Mpa
M35
E
fck
E
35 Mpa
29500 Mpa
M35
E
Dirt Wall, Return Wall, Screen Wall
fck
Pile Caps and Piles
2.3.2
Reinforcement
Grade of Reinforcement
Fe-500
fy
500
Es
200000 Mpa
2.3.2
Soil Properties for Backfill material for active earth pressure Calculation
Type of Abutment M for Masonary and C for Concrete
C
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
10 degrees
2.3.2
Soil Properties for Natural Earth for passive earth pressure Calculation for design of shear Key
Type of Shear Key M for Masonary and C for Concrete
C
284 T
13.9 T
326.6 T
13.9 T
355 T
13.9 T
0.83
10.9 m
0 m
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
3.0
LOADS
3.1
MGC
File No.
HB
Date
SB
Date
Sheet
Loads From Superstructure are Obtained From Reactions of STAAD Grillage Model as shown in Figure - 3
28.30m
Project
Discipline
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
3.1.1
MGC
File No.
HB
Date
SB
Date
Sheet
For STAAD output refer Figure - 4A (girders Only) and Figure - 4B ( Slab + Daiphragm)
32.460
29.972
32.460
29.972
29.972
32.460
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
16
26.189
16.741
26.189
16.741
FIGURE - 4B REACTION FOR DEAD LOAD OF SLAB + DIAPHRAGM
26.189
0.840
RA = 210.724 T
X
Z
28.300
0.840
RB = 210.724 T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
4
Total
58.649
210.724
V (T)
210.724
eL (m)
eT (m)
1.7
HL (T)
0
MGC
File No.
HB
Date
SB
Sheet
Date
ev (m)
HT (T)
ev (m)
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
44.1
8.943
8.950
FIGURE - 5 REACTION FOR SUPERIMPOSED DEAD LOAD
44.121
RA
Reaction Due To Dead Load of Superstructure
Pedestal No Reaction (T)
1
44.121
2
8.943
3
8.943
4
44.121
0.840
RB
28.300
0.840
44.111
RA = 106.128 T
Y
X
Z
V (T)
29.980
RB = 106.128 T
Moment - MTon-m : F
Project
3.1.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Total
106.128
106.128
1.700
Live Load (LL)
A. One Track Loaded Condition
Taking Moments about A
No
Load (T)
Dist. (m)
Mom (Tm)
1
17.000
29.140
495.38
2
17.000
26.690
453.73
3
17.000
22.255
378.335
4
17.000
19.805
336.685
5
17.000
8.740
148.58
6
17.000
6.290
106.93
7
17.000
1.855
31.535
8
17.000
-0.595
-10.115
Total
136.000
1941.060
RB
= 1,941.060 / 28.300 =
68.589 T
RA
= 136.000 - 68.589 =
67.411 T
0.000
1.700
0.000
17
File No.
HB
Date
SB
0.000
17
2.450
Date
0.000
17
4.435
Sheet
17
2.450
17
11.065
17
2.450
11.065
0.245
17
2.2175 2.2175
4.435
RA
0.840
RA =
0.000
MGC
0.372
0.372
1.372
0.000
0.840
29.980
RB =
68.589 T
2.450
RB
28.300
67.411 T
17
0.000
0.000
V (T)
188.255
3.1.4
1.700
0.000
0.000
0.000
RA
0.840
RB
28.300
0.840
LOADS Page no 14 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Width of Walkway
Load On Walkway
UDL on Walkway
RA
RB = RA =
= 0.523 x 29.980 / 2 =
V (T)
1.045
0.5
0.5225
7.832
7.832
m
T/m^2
T/m
T
T
RA =
1.700
0.000
0.000
7.832
MGC
File No.
HB
Date
SB
Date
Sheet
29.980
RB =
7.832
0.000
3.1.5
1.700
0.000
0.000
0.000
LWR Force
LWR Force
1 T/m
0.5 T/m
29.98
T
2.552
For The Present Case there is no pier only pedestals are proposed
Height of Pedestal
0.235 m
Pedestal Dim In Long Direction
0.8 m
H/d
0.294
LWR FORCE per m length of Girder
1 T/m
RA
0.840
RA =
28.300
2.703
29.980
HB
RB =
HB =
RB
0.840
-2.703 T
29.98 T
As Per DBR Clause 13.5.1 the horizontal forces are taken by shear Key protuding above Pier Cap and elastomeric bearing are for Vertical load Transfer only
LWR FORCE
29.98 T at Rail Level
Taking Moment about A
RB
= -29.980 x 2.552 / 28.300
-2.703 T
RA
= -RB =
2.703 T
LOADS Page no 15 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
HB
=
V (T)
3.1.6
29.98 T
Hor Force Long & Height
HL (T)
ev (m)
-2.703
1.700
Breaking and Tractive Force
As per Design basis report Clause 8.7
Tractive Effort
20%
Braking Force
18%
condition
For One Track Loded Condiotion Tractive Effort Governs
No of Axle on the Girder for one train
8
Axle weight
17 T
Total Live load Per Track
136 T
0.000
29.980
2.105
MGC
File No.
HB
Date
SB
Date
Sheet
0.000
27.2
2.552
27.2 T
24.48 T
0.840
27.2 T at Rail Level
= -27.200 x 2.552 / 28.300
-2.453 T
RA =
= -RB =
2.453 T
=
27.2 T
Vertical Reaction & Eccn
Hor Force Long & Height
e
(m)
e
(m)
H
(T)
ev (m)
V (T)
L
T
L
-2.453
1.700
2.100
27.200
2.105
RA
28.300
2.453
HB
29.980
RB =
HB =
RB
0.840
-2.453 T
27.2 T
0.000
51.68
27.2 T
24.48 T
51.68 T at Rail Level
RA
0.840
28.300
HB
RB
0.840
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Taking Moment about A
RB
RA
HB
3.1.7
1.700
-4.660 T
4.660 T
RA =
51.68 T
Hor Force Long & Height
HL (T)
ev (m)
0.000
51.680
2.105
4.660
MGC
File No.
HB
Date
SB
Date
29.980
Sheet
RB =
HB =
-4.660 T
51.68 T
0.000
Raking Force
As Per Design Basis Report Clause 8.8 Transverse Raking Force of 4 KN/m per Track is to be considered
Raking Force For one track/m
0.4 T/m
0.000
0.000
0.000
0.000
T
T
Hor Force Long & Height
HL (T)
ev (m)
0.000
0.000
T
T
Hor Force Long & Height
HL (T)
ev (m)
0.000
0.000
4.657
4.657
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Transverse Wind Force on Coach
Transverse Wind Force per abutment
Height above Rail level
File No.
HB
Date
SB
Date
Sheet
13.42 T
6.71 T
1.83 m
Vertical Reaction & Eccn
eL (m)
eT (m)
V (T)
0.000
3.1.9
MGC
0.000
0.000
0.000
6.487
1.8585 T
0.09 T/m
20.65 m
1.8585 T
1.83
4.382
RA
0.840
RB
RA
HB
1.700
-0.288 T
0.288 T
RA =
1.8585 T
Hor Force Long & Height
HL (T)
ev (m)
2.100
1.859
2.105
28.300
0.288
29.980
HB
RB =
HB =
RB
0.840
-0.288 T
1.8585 T
0.000
3.1.10
1.700
3.717
2.105
0.000
0.1743 T/m^2
LOADS Page no 18 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Height of superstructure + Parapet
Load per m
Transverse wind force
Transverse Wind Force per abutment
Height above Soffit Level
V (T)
3.255 m
0.567 T/m^2
17.009 T
8.505
1.628 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
3.2
3.2.1
0.000
0.235 m
0.800 m
0.800 m
0.150 cum
0.376 T
4
1.504 T
Vertical Reaction & Eccn
eL (m)
eT (m)
1.504
3.2.2
0.000
1.7
0.000
0.000
MGC
File No.
HB
Date
SB
Date
Sheet
3.733
0.000
2.455
0.3
11
8.102 cum
20.25375 T
Vertical Reaction & Eccn
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
eL (m)
V (T)
20.254
3.2.3
eT (m)
0.69
HL (T)
0
File No.
HB
Date
SB
Sheet
Date
ev (m)
HT (T)
ev (m)
0.000
0.000
0.3
0.3
11
0.990 cum
2.475 T
0.15
B. Triangular Portion
Bracket Offset from dirt wall back Face
Tapering Depth of Dirtwall Bracket
Length
Concrete Quantity
Weight
CG from Face of Dirt wall
0.3
0.3
11
0.495 cum
1.2375 T
0.1
MGC
0.1333 m
Hor Force Long & Height
HL (T)
ev (m)
0
0.000
0.2
LOADS Page no 20 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Return Wall Height
Return wall length
Concrete Quantity
Weight
CG from Face of Pile cap
2.455
3.24
1.591 cum
3.977 T
0.1
B. Triangular Portion
Additional Thickness at Bot
Return Wall Height
Return wall length
Concrete Quantity
Weight
CG from Face of Dirt wall
0.1
2.455
3.24
0.398 cum
0.994 T
0.233
-1.080
0.1267 m
Hor Force Long & Height
HL (T)
ev (m)
5.373
0.000
0.000
MGC
File No.
HB
Date
SB
Date
Sheet
0.000
0.2
2.455
1.86
0.913 cum
2.283 T
0.1
0.1
LOADS Page no 21 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Screen Wall Height
Screen wall length
Concrete Quantity
Weight
CG from Face of Dirt wall
2.854
HB
Date
SB
Date
Sheet
1.770
0.1267 m
Hor Force Long & Height
HL (T)
ev (m)
-5.373
0.000
0.000
0.000
1.8
5.4
11
106.920 cum
267.300 T
Vertical Reaction & Eccn
eL (m)
eT (m)
V (T)
267.300
3.2.7
File No.
2.455
1.86
0.228 cum
0.571 T
0.233
3.2.6
MGC
0.000
0.000
0.000
0.000
2.455
3.24
11
87.496 cum
174.992 T
LOADS Page no 22 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Vertical Reaction & Eccn
eL (m)
eT (m)
V (T)
174.992
-1.080
0.000
0.000
MGC
File No.
HB
Date
SB
Hor ForceTrans & Height
HT (T)
ev (m)
0.000
Sheet
Date
0.000
Project
4.0
EARTH PRESSURE
4.1
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
rad
rad
rad
rad
File No.
HB
Date
SB
Date
###
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
Sheet
2
Cos ( )
Ka=
Cos . Cos ( + ) 1+
=
=
0.308
2 T/m3
Ka
Sin ( + ) . Sin ( )
Cos ( + ) . Cos ( )
Calculations
for
4.1.1
V (T)
H
P
2.440
53.075
1.318
52.269
9.216
T/m^2
T
m
T
T
Hor Force Long & Height
HL (T)
ev (m)
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
9.216
52.269
1.318
File No.
HB
Date
SB
0
Sheet
Date
0
0.300 m
11 m
8.25 T/m
Parapet Height
Parapet Thk
Weight of unit width
Nr
Weight of Both
2.1
0.3
1.575
2
3.15
m
m
T/m
0.3
0.1
0.7
0.1
2.8
0.4
T/m
T/m
T/m
T/m
T/m
T/m
###
T/m
h
2
4.1.2
-2.7
MGC
7.55
15.8 T/m
1.436 T/m^2
Calculations
for
H
Height
h=
Width
=
Pressure For Surcharge
Force F
This force act at Height
Horizontal Component
Vertical Component
= 1.436 x 0.308 =
= 0.443 x 3.955 x 11.000 =
H
= 3.955 / 2 =
3.955
11
0.443
19.276
1.978
18.983
3.347
m
m
T/m^2
T
m
T
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
V (T)
4.1.3
-2.7
18.983
1.978
MGC
File No.
HB
Date
SB
Hor ForceTrans & Height
HT (T)
ev (m)
0
Sheet
Date
2.267
13.7 T/m
25 T
Track Slab
Since as the rails run on track slab and taking dispersion through slab at 45 degress
the length of distribution in our case is as shown in figure =
2.867 m
Below Formation level the dispersion shall be 1 Horizontal to 2 Vertical
0.3
0.3
0.3
2.867
2.100
Since Method given in IRS Sub structure Code Clause 5.8.2 is for the case when track
centreline and abutment centreline concide.
In our case the track centre line of Indivisual track is eccentric to abutment centreline hence
the method given in Clause 5.8.2 is not applicable
6.1665
6.1665
1.4335 1.4335
2.867
1.9665
1.9665
Hence we analize below the effects following the same fundamental principles of Clause 5.8.2.
2.155
A. One Track Loded Condition
Height
LL Surcharge at top
Distribution length at Formation Level
Distribution length at Bottom of Pile Cap Level = B+h
Pressure at Bottom P1
h
S
B
3.955
9.316
2.867
6.822
m
T/m
m
m
1.002 T/m^2
B+
Strip Thk dx
###
Calculations
for
1.800
x
1.9775
6.822
2.867
1.9775
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Pressure at Top P2
MGC
File No.
HB
Date
SB
Date
Sheet
0.421 T/m^2
5.500
Px = P2 + (P1-P2)*x/h
Pressure at any height x from base
Width of strip of thickness dx at height x W=B+h-x
Fdx = Px.(B+h-x)dx
Force at This section on strip thk dx
Expanding and rearanging
Fdx = P2(B+h)dx + ((P1-P2)(B+h)/h - P2)xdx - ((P1-P2)/h)x2dx
###
11.000
5.500
0.14692546 x2dx
P1
0.14692546 h3/3
12.8802587 T
Px
h
###
Let the force act at a height H from base This height is calculated below
Taking Moment about base the moment of force of strip dx at base is
Mdx = Fdxx
Mdx =
2.874 xdx +
0.58109021 x2dx Integrating This in range 0 To h we get Total Moment M
M=
2.874 h2/2 +
0.58109021 h3/3 M=
25.4707115 Tm
H=M/F
1.9775 m
Horizontal Component
Vertical Component
0.14692546 x3dx
x
###
Calculations
for
0.14692546 h4/4
V (T)
12.685 T
2.237 T
Vertical Reaction & Eccn
Hor Force Long & Height
eL (m)
eT (m)
HL (T)
ev (m)
2.237
-2.7
2.1
12.685
1.978
P2
Hor ForceTrans & Height
HT (T)
ev (m)
0
0
EARTH PRESSURE Page 27 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
-2.7
25.369
1.978
Project
30
10
2.333
0
File No.
HB
Date
SB
Date
degrees
degrees
degrees
degrees
0.524
0.175
0.041
0.000
rad
rad
rad
rad
Cos . Cos ( + ) 1+
=
=
Sin ( + ) . Sin ( )
Cos ( + ) . Cos ( )
0.325
2 T/m3
0.3
P
2
Ka
Cos 2 ( )
Ka=
Sheet
0.2
###
4.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
Calculations
for
4.2.1
V (T)
1.399
4.886
2.518
4.773
1.044
-1.08
T/m^2
T
m
T
T
Hor Force Long & Height
HL (T)
ev (m)
5.2
0.000
0.000
2.518
EARTH PRESSURE Page 29 of 365
Project
File No.
HB
Date
SB
Date
Sheet
0.2
Track slab for Ballastless track
P
h
2
4.2.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
1.436 T/m^2
Height
h=
Width
=
Pressure For Surcharge
Force F
This force act at Height
Horizontal Component
Vertical Component
2.155
3.24
0.466
3.256
2.878
3.181
0.696
= 1.436 x 0.325 =
= 0.466 x 2.155 x 3.240 =
H
= 1.800+2.155 / 2 =
V (T)
-1.08
m
m
T/m^2
T
m
T
T
0.3
P
2
Calculations
for
0.000
0.000
2.878
Project
File No.
HB
Date
SB
Date
Sheet
T/m
m
m
m
T/m^2
1.667
h1
Force F
This force act at Height
= 2.155 - 1.667 =
2.867
###
9.316
2.867
1.667
6.200
0.488
D=
3.1
###
As Per Clause 5.8.3 of IRS IRS Foundation and Substructure Code surcharge due to liveload
is assumed to disperse below formation level at a slope of one horizontal to one Vertical
4.2.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
h
P
0.489 m
3.24 m
0.772 T
= 1.800+0.488 / 2 =
2.044 m
Horizontal Component
Vertical Component
h1
0.3
P
2
Calculations
for
0.754 T
0.165 T
P
V (T)
-1.08
0.000
0.000
2.044
Project
4.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
0.2
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
rad
rad
rad
rad
F1
Cos 2 ( )
Ka=
Cos 2 . Cos ( + ) 1+
=
=
Sin ( + ) . Sin ( )
Cos ( + ) . Cos ( )
0.308
2 T/m3
h1
0.3
F2
P1
Ka
Sheet
Calculations
for
4.3.1
h2
H1
H2
P2
1.515
4.016
2.618
3.955
0.697
T/m^2
T
m
T
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
V (T)
4.3.2
1.62
0.000
-5.5
0.000
File No.
HB
Date
SB
Hor ForceTrans & Height
HT (T)
ev (m)
0.000
m
m
T/m^2
T/m^2
T
m
T
T
Hor Force Long & Height
HL (T)
ev (m)
MGC
3.955
Sheet
Date
2.618
0.000
19.813
0.820
Cl of IR Track
4.810
0.2
Dead+Live Load Surch. on Screen wall
3.31
3.000
13.7
3
3.6
3.310
10.220
0.52215833
T/m
m
T/m
m
m
T/m^2
h1
D=
###
On screen wall Dead + Live load surcharge come from adjoining Indian Railway tracks
2
4.3.3
0.3
P1
EARTH PRESSURE Page 33 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
h1
Force F
This force act at Height
0.945 m
5.4 m
h2
2.66457395 T
= 0.945 / 2 =
Sheet
Date
F
h1
Calculations
for
H
P1
0.473 m
Horizontal Component
Vertical Component
2.624 T
0.463 T
V (T)
0.000
0.000
0.473
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
SEISMIC FORCES
The Seismic Forces are calculated based on Single Degree of Freedom System. The Time period of this system is given by
T =2
M
K
0.752
421.448
212.256
0
634.456
T
T
T
T
T
0.06179543 s
2.5
0.2
1.5
2.5
SEISMIC FORCES Page 36 of 365
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
hL
=(Z/2)*(I/R)*(Sa/g)
0.15
MGC
File No.
HB
Date
SB
Date
Sheet
0.752
210.724
106.128
94.1274006
411.731401
T
T
T
T
T
0.04978088 s
2.5
z
I
R
hT
0.2
1.5
2.5
=(Z/2)*(I/R)*(Sa/g)
0.15
0.752 T
210.724 T
106.128 T
SEISMIC FORCES Page 37 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
4 LL
Total
Area of Pedestal
E
L
Stiffness for one pedestal =A*E/L
Stiffness for Four Pedestals K
T
Sa/g
File No.
HB
Date
SB
Date
Sheet
T
T
m2
KN/m2
m
KN/m
KN/m
0.01520027 s
1.667
=2.5*2/3
z
I
R
94.1274006
411.731401
0.64
36000000
1.31
17587786.3
70351145
MGC
0.2
1.5
2.5
=(Z/2)*(I/R)*(Sa/g)
0.1
For Dirt wall Return walls also since mass is negligiable as compared to stiffness it can be shown that time period is very less and as such above Sa/g applies and we can take
Corresponding value of hT,
hL, v
5.2
5.2.1
RB
RA
HB
421.448 T
63.2172 T
1.3092 m
= -63.217 x 1.309 / 28.300
= -RB =
=
63.2172 T
1.3092 m
-2.925 T
2.925 T
63.2172 T
RA
0.840
RA =
28.300
2.925
29.980
HB
RB =
RB
0.840
-2.925 T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
HB = 63.2172 T
V (T)
5.2.2
1.700
63.217
2.105
212.256 T
31.8384 T
0.5 m
2.65 m
= -31.838 x 2.650 / 28.300
= -RB =
=
0.000
31.8384 T
2.65
-2.981 T
2.981 T
31.8384 T
V (T)
2.455
0.840
31.838
RA
RA =
2.105
28.300
2.981
29.980
HB
RB
0.840
RB = -2.981 T
HB = 31.8384 T
0.000
5.2.4
0.000
5.2.3
0.000
0.000
0.000
0.000
0.000
1.504 T
SEISMIC FORCES Page 39 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Longitudinal seismic Force
Height at which this act above pile cap top
V (T)
0.2256 T
0.1175 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.2.5
0.000
0.226
1.918
File No.
HB
Date
SB
Date
Sheet
0.000
20.25375 T
3.0380625 T
1.2275 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.2.6
0.000
MGC
0.000
3.038
3.028
0.000
2.475 T
2.005 m
B. Triangular Portion
Weight
CG From Base Of Dirt wall
1.2375 T
1.755 m
Total Weight
Longitudinal seismic Force
Height at which this act above pile cap top
V (T)
3.7125 T
0.556875 T
1.9217 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
0.000
0.557
3.722
0.000
SEISMIC FORCES Page 40 of 365
Project
5.2.7
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
File No.
HB
Date
SB
Date
Sheet
3.9771 T
1.2275 m
B. Triangular Portion
Weight
CG From Base Of Dirt wall
0.994275 T
0.81833333 m
Total Weight
Longitudinal seismic Force
Height at which this act above pile cap top
V (T)
4.971375 T
0.74570625 T
1.1457 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.2.8
MGC
0.000
0.746
2.946
0.000
2.28315 T
1.2275 m
B. Triangular Portion
Weight
CG From Base Of Dirt wall
0.5707875 m
0.81833333 m
Total Weight
Longitudinal seismic Force
Height at which this act above pile cap top
2.8539375 T
0.42809063 T
1.1457 m
SEISMIC FORCES Page 41 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
V (T)
5.2.9
V (T)
267.3 T
40.095 T
0.9 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
V (T)
5.2.1
5.2.2
5.2.3
5.2.4
2.946
0.000
174.9924 T
26.24886 T
1.2275 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
S.No
0.428
HB
Date
SB
Hor ForceTrans & Height
HT (T)
ev (m)
0.000
Sheet
Date
0.000
40.095
0.900
0.000
5.2.11
0.000
File No.
5.2.10
0.000
MGC
0.000
26.249
3.028
0.000
0.000
0.000
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
5.2.5
5.2.6
5.2.7
5.2.8
5.2.9
5.2.10
5.3
5.3.1
0.000
0.000
0.000
0.000
0.000
0.000
-5.906
DL of superstructure
Transverse seismic Force
Height at which this act above soffit
0.000
0.000
0.000
0.000
0.000
0.000
3.038
0.557
0.746
0.428
40.095
26.249
166.394
3.028
3.722
2.946
2.946
0.900
3.028
0.000
0.000
0.000
0.000
0.000
0.000
0.000
File No.
HB
Date
SB
0.000
0.000
0.000
0.000
0.000
0.000
Sheet
Date
9.198
2.073
2.197
1.261
36.086
79.468
318.516
0.000
0.000
0.000
0.000
0.000
0.000
0.000
210.724 T
31.6086 T
1.3092 m
V (T)
5.3.2
0.000
0.000
0.000
0.000
0.000
0.000
MGC
0.000
0.000
0.000
3.414
106.128
15.9192
0.5
2.65
T
T
m
m
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
eL (m)
V (T)
0.000
5.3.3
eT (m)
0.000
HL (T)
0.000
0.000
MGC
File No.
HB
Date
SB
Sheet
Date
ev (m)
HT (T)
ev (m)
0.000
15.919
4.755
34.2943463 T
5.14415194 T
1.830 m
V (T)
0.000
0.000
0.000
6.487
68.5886926 T
10.2883039 T
1.830 m
V (T)
5.3.4
0.000
0.000
0.000
6.487
1.504 T
SEISMIC FORCES Page 44 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Transverse seismic Force
Height at which this act above pile cap top
V (T)
0.2256 T
0.1175 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.3.5
0.000
0.000
0.000
File No.
HB
Date
SB
Date
Sheet
1.918
20.25375 T
3.0380625 T
1.2275 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.3.6
0.000
MGC
0.000
0.000
0.000
3.028
2.475 T
1.2275 m
B. Triangular Portion
Weight
CG From Base Of Dirt wall
1.2375 m
1.755 m
SEISMIC FORCES Page 45 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Total Weight
Transverse seismic Force
Height at which this act above pile cap top
V (T)
3.7125 T
0.556875 T
1.4033 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.3.7
0.000
0.000
0.000
File No.
HB
Date
SB
Date
Sheet
3.203
3.9771 T
1.2275 m
B. Triangular Portion
Weight
CG From Base Of Dirt wall
0.994275 m
0.81833333 m
Total Weight
Transverse seismic Force
Height at which this act above pile cap top
V (T)
4.971375 T
0.74570625 T
1.1457 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.3.8
0.000
MGC
0.000
0.000
0.000
1.146
2.28315 T
1.2275 m
SEISMIC FORCES Page 46 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
B. Triangular Portion
Weight
CG From Base Of Dirt wall
V (T)
2.8539375 T
0.42809063 T
1.1457 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
HB
Date
SB
Date
Sheet
0.000
0.000
0.000
2.946
267.3 T
40.095 T
0.9 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
5.3.10
File No.
0.5707875 m
0.81833333 m
Total Weight
Transverse seismic Force
Height at which this act above pile cap top
5.3.9
MGC
0.000
0.000
0.000
0.900
174.9924 T
26.24886 T
1.2275 m
Vertical Reaction & Eccn
eL (m)
eT (m)
0.000
0.000
0.000
0.000
3.028
SEISMIC FORCES Page 47 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
5.3.11
Descrioption
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
5.3.9
5.3.10
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
5.3.9
Descrioption
Trans Seismic Force On DL of Sup.Str.
Trans Seismic Force On SIDL of Sup.Str.
Trans Seismic Force On LL
Trans Seismic Force On Pedestal
Trans Seismic Force On Dirt wall
Trans Seismic Force On Dirt wall Bracket
Trans Seismic Force On Return wall
Trans Seismic Force On Scree wall
Trans Seismic Force On Pile Cap
V (T)
V (T)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
MGC
File No.
HB
Date
SB
Date
Sheet
3.414
4.755
6.487
1.918
3.028
3.203
1.146
2.946
0.900
3.028
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
107.918
75.696
33.370
0.433
9.198
1.784
0.854
1.261
36.086
79.468
346.067
3.414
4.755
6.487
1.918
3.028
3.203
1.146
2.946
0.900
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
107.918
75.696
66.740
0.433
9.198
1.784
0.854
1.261
36.086
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
5.3.10
5.4
5.4.1
0.000
0.000
DL of superstructure
Vertical seismic Force
0.000
0.000
0.000
26.249
129.154
HB
Date
SB
3.028
Sheet
Date
0.000
0.000
79.468
379.438
1.700
0.000
0.000
0.000
106.128 T
10.6128 T
V (T)
5.4.3
0.000
File No.
210.724 T
21.0724 T
V (T)
5.4.2
0.000
MGC
1.700
0.000
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
34.2943463 T
3.42943463 T
V (T)
1.700
0.000
0.000
0.000
68.5886926 T
6.85886926 T
V (T)
5.4.4
0.000
0.000
0.000
0.000
1.504 T
0.1504 T
V (T)
5.4.5
1.700
1.700
0.000
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
DL of Dirt
Vertical seismic Force
HB
Date
SB
Date
Sheet
0.690
0.000
0.000
0.000
2.475 T
B. Triangular Portion
Weight
1.2375 m
Total Weight
Vertical seismic Force
3.7125 T
0.37125 T
V (T)
5.4.7
File No.
20.25375 T
2.025375 T
V (T)
5.4.6
MGC
0.407
0.000
0.000
0.000
3.9771 T
B. Triangular Portion
Weight
0.994275 m
Total Weight
4.971375 T
SEISMIC FORCES Page 51 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Vertical seismic Force
HB
Date
SB
Date
Sheet
-1.080
0.000
0.000
0.000
2.28315 T
B. Triangular Portion
Weight
0.5707875 m
Total Weight
Vertical seismic Force
2.8539375 T
0.28539375 T
V (T)
5.4.9
File No.
0.4971375 T
V (T)
5.4.8
MGC
1.770
0.000
0.000
0.000
267.3 T
26.73 T
V (T)
0.000
0.000
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Vert Seismic Force On Soil above PC
DL of soil above Pile Cap
Vertical seismic Force
Descrioption
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
5.3.9
5.3.10
5.3.1
5.3.2
Descrioption
Trans Seismic Force On DL of Sup.Str.
Trans Seismic Force On SIDL of Sup.Str.
File No.
HB
Date
SB
Date
Sheet
174.9924 T
17.499 T
V (T)
5.4.11
MGC
V (T)
0.000
V (T)
-1.080
1.700
1.700
1.700
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
1.700
1.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
35.823
18.042
5.830
0.256
1.398
0.151
-0.537
0.505
0.000
-18.899
42.568
0.000
0.000
7.202
0.000
0.000
0.000
2.671
-1.534
0.000
0.000
8.340
0.000
0.000
35.823
18.042
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
5.3.9
5.3.10
5.5
Combination of seismic
5.5.1
5.5.2
-5.906
0.000
82.673
18.896
V (T)
1.700
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
File No.
HB
Date
SB
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Sheet
Date
11.660
0.256
1.398
0.151
-0.537
0.505
0.000
-18.899
48.398
0.000
0.000
0.000
0.000
2.671
-1.534
0.000
0.000
1.138
V (T)
6.859
0.150
2.025
0.371
0.497
0.285
26.730
17.499
86.103
MGC
166.394
0.000
0.000
166.394
HT (T)
0.000
124.010
0.000
37.203
ML (T.m)
318.516
0.000
42.568
331.286
MT (T.m)
0.000
346.067
8.340
106.322
HL (T)
HT (T)
ML (T.m)
MT (T.m)
-5.906
166.394
0.000
318.516
0.000
0.000
0.000
129.154
0.000
379.438
86.103
0.000
0.000
48.398
1.138
SEISMIC FORCES Page 54 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Combination
5.5.3
-5.906
0.000
82.673
23.030
166.394
0.000
0.000
49.918
V (T)
-5.906
0.000
86.103
24.059
-5.906
0.000
82.673
80.902
V (T)
-5.906
Date
SB
Date
Sheet
114.173
HT (T)
0.000
124.010
0.000
124.010
ML (T.m)
318.516
0.000
42.568
108.325
MT (T.m)
0.000
346.067
8.340
348.569
HL (T)
HT (T)
ML (T.m)
MT (T.m)
166.394
0.000
318.516
0.000
0.000
129.154
0.000
379.438
0.000
0.000
48.398
1.138
49.918
129.154
110.074
379.779
(0.3 Sx + 0.3 Sy + Sz)
HL (T)
V (T)
333.035
HB
5.5.6
HL (T)
V (T)
38.746
File No.
5.5.5
166.394
5.5.4
19.925
MGC
166.394
0.000
0.000
49.918
HT (T)
0.000
124.010
0.000
37.203
ML (T.m)
318.516
0.000
42.568
138.123
MT (T.m)
0.000
346.067
8.340
112.160
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Sy
Sz
Combination
5.6
0.000
86.103
84.331
0.000
0.000
49.918
129.154
0.000
38.746
0.000
48.398
143.953
MGC
File No.
HB
Date
SB
Date
Sheet
379.438
1.138
114.969
=hL
=hT
=
v
=
The angle for calculation of Dynamic Increment is given by
=tan 1
Taking +ve sign
+
=
Taking -ve sign
0.15
0.1
h
1 v
7.765 degrees
9.462 degrees
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
6.0
6.1
0.1
30
10
0
0
degrees
degrees
degrees
degrees
7.765 degrees
9.462 degrees
0.524
0.175
0.000
0.000
rad
rad
rad
rad
MGC
File No.
HB
Date
SB
Date
###
Calculations
for
Sheet
0.136 rad
0.165 rad
( 1 v ) Cos 2 ( )
Sin ( + ) . Sin ( )
Cos . Cos . .Cos ( ++ ) 1+
Cos ( ) .Cos ( ++ )
2
Ca=
Ca=
0.441
6.1.1
Ca=
0.383
Max of two Ca=
0.441
Ca-Ka
=
0.132
=
2 T/m3
Dyn. Inc. of Earth Pres. on Dirt wall
h
=
3.955 m
width
=
11 m
= h(Ca- Ka)
Pressure Intensity at dirt wall base P
= 2.000 x 3.955 x 0.132 =
1.046
Force on Dirt Wall F
= 0.500 x 1.046 x 3.955 x 11.000 =
22.763
This force act at Height
H
= 3.955 / 2 =
1.978
Horizontal Component
22.417
Vertical Component
3.953
Vertical Reaction & Eccn
eL (m)
eT (m)
V (T)
H
P
T/m^2
T
m
T
T
Hor Force Long & Height
HL (T)
ev (m)
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
3.953
22.417
1.978
File No.
HB
Date
SB
0
Sheet
Date
0
1
0.300 m
11 m
8.25 T/m
Parapet Height
Parapet Thk
Weight of unit width
Nr
Weight of Both
2.1
0.3
1.575
2
3.15
m
m
T/m
0.3
0.1
0.7
0.1
2.8
0.4
T/m
T/m
T/m
T/m
T/m
T/m
###
T/m
All the above weight are for unit length Perpendicular to abutment
Total Weight
Weight per Sqm
= 15.800 / 11.000 =
15.8 T/m
1.436 T/m^2
Height
h=
Width
=
Pressure For Surcharge
Force F
This force act at Height
Horizontal Component
Vertical Component
3.955
11
0.190
8.267
2.610
8.141
1.436
h
2
6.1.2
-2.7
MGC
Calculations
for
= 1.436 x 0.132 =
= 0.190 x 3.955 x 11.000 =
H
= 3.955 * 0.66 =
m
m
T/m^2
T
m
T
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
V (T)
6.1.3
-2.7
8.141
2.610
MGC
File No.
HB
Date
SB
Hor ForceTrans & Height
HT (T)
ev (m)
0
Sheet
Date
2.267
13.7 T/m
25 T
Track Slab
Since as the rails run on track slab and taking dispersion through slab at 45 degress
the length of distribution in our case is as shown in figure =
2.867 m
Below Formation level the dispersion shall be 1 Horizontal to 2 Vertical
0.3
0.3
0.3
2.867
2.100
Since Method given in IRS Sub structure Code Clause 5.8.2 is for the case when track
centreline and abutment centreline concide.
In our case the track centre line of Indivisual track is eccentric to abutment centreline hence
the method given in Clause 5.8.2 is not applicable
6.1665
6.1665
1.4335 1.4335
2.867
1.9665
1.9665
Hence we analize below the effects following the same fundamental principles of Clause 5.8.2.
2.155
A. One Track Loded Condition
Height
LL Surcharge at top
Distribution length at Formation Level
Distribution length at Bottom of Pile Cap Level = B+h
Pressure at Bottom P1
h
S
B
3.955
9.316
2.867
6.822
m
T/m
m
m
0.430 T/m^2
B+
Strip Thk dx
###
Calculations
for
1.800
x
1.9775
6.822
2.867
1.9775
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Pressure at Top P2
MGC
File No.
HB
Date
SB
Date
Sheet
0.181 T/m^2
5.500
Px = P2 + (P1-P2)*x/h
Pressure at any height x from base
Width of strip of thickness dx at height x W=B+h-x
Fdx = Px.(B+h-x)dx
Force at This section on strip thk dx
Expanding and rearanging
Fdx = P2(B+h)dx + ((P1-P2)(B+h)/h - P2)xdx - ((P1-P2)/h)x2dx
###
11.000
5.500
0.0630137 x2dx
P1
0.0630137 h3/3
5.52411195 T
Px
h
###
Let the force act at a height H from base This height is calculated below
Taking Moment about base the moment of force of strip dx at base is
Mdx = Fdxx
Mdx =
1.232 xdx +
0.24921917 x2dx Integrating This in range 0 To h we get Total Moment M
M=
1.232 h2/2 +
0.24921917 h3/3 M=
10.9239314 Tm
Factor for Height 0.66/0.5
Hcal=M/F
1.9775 m
Horizontal Component
Vertical Component
0.0630137 x3dx
x
###
Calculations
for
0.0630137 h4/4
1.32
2.610
5.440 T
0.959 T
Vertical Reaction & Eccn
Hor Force Long & Height
eL (m)
eT (m)
HL (T)
ev (m)
Factored Height
V (T)
0.959
-2.7
2.1
5.440
2.610
H
P2
Hor ForceTrans & Height
HT (T)
ev (m)
0
0
DYNAMIC INCREMENT Page 60 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
-2.7
10.880
2.610
Project
30
10
2.333
0
7.765 degrees
0.000 degrees
0.1
degrees
degrees
degrees
degrees
6.2.1
Ca=
Date
SB
Date
Sheet
0.2
0.524
0.175
0.041
0.000
rad
rad
rad
rad
0.136 rad
0.000 rad
Sin ( + ) . Sin ( )
Cos ( ) .Cos ( ++ )
0.460
0.292
0.460
0.135
2 T/m3
0.3
P
2
Ca=
HB
( 1 v ) Cos 2 ( )
Ca=
File No.
###
6.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
Calculations
for
0.582
2.031
2.878
1.984
0.434
T/m^2
T
m
T
T
Hor Force Long & Height
HL (T)
ev (m)
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
0.434
5.2
0.000
0.000
1.984
File No.
HB
Date
SB
Sheet
Date
2.878
0.2
Track slab for Ballastless track
P
h
2
6.2.2
-1.08
MGC
1.436 T/m^2
Height
h=
Width
=
Pressure For Surcharge
Force F
This force act at Height
Horizontal Component
Vertical Component
2.155
3.24
0.194
1.354
3.222
1.322
0.289
= 1.436 x 0.135 =
= 0.194 x 2.155 x 3.240 =
H
= 1.800+2.155 * 0.66 =
V (T)
-1.08
m
m
T/m^2
T
m
T
T
0.3
P
2
Calculations
for
0.000
0.000
3.222
Project
File No.
HB
Date
SB
Date
Sheet
T/m
m
m
m
T/m^2
1.667
h1
Force F
This force act at Height
= 2.155 - 1.667 =
2.867
###
9.316
2.867
1.667
6.200
0.203
D=
###
As Per Clause 5.8.3 of IRS IRS Foundation and Substructure Code surcharge due to liveload
is assumed to disperse below formation level at a slope of one horizontal to one Vertical
3.1
6.2.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
h
P
0.489 m
3.24 m
0.321 T
= 1.800+0.488 * 0.66 =
2.122 m
Horizontal Component
Vertical Component
h1
0.3
P
2
Calculations
for
0.314 T
0.069 T
P
V (T)
-1.08
0.000
0.000
2.122
Project
6.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
30
10
0
0
7.76516602 degrees
9.46232221 degrees
0.1
degrees
degrees
degrees
degrees
HB
Date
SB
Date
0.2
0.524
0.175
0.000
0.000
0.136 rad
0.165 rad
Sheet
rad
rad
rad
rad
Sin ( + ) . Sin ( )
Cos . Cos . .Cos ( ++ ) 1+
Cos ( ) .Cos ( ++ )
2
Ca=
File No.
F1
( 1 v ) Cos 2 ( )
Ca=
MGC
Calculations
for
h1
0.441
6.3.1
0.3
F2
P1
Ca=
0.383
Max of two Ca=
0.441
Ca-Ka
=
0.132
=
2 T/m3
Dyn. Inc. of Earth Pres. on Screen wall
h1
=
2.455 m
width
=
2.16 m
Pressure Intensity at Scr. wall base P1 = h (Ca-Ka)
= 2.000 x 2.455 x 0.132 =
Force on screen Wall F1 = 0.500 x 0.650 x 2.455 x 2.160 =
This force act at Height
H1
= 1.800+2.455 / 2 =
Horizontal Component
h2
H1
H2
P2
0.650
1.722
3.028
1.696
T/m^2
T
m
T
DYNAMIC INCREMENT Page 65 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Vertical Component
File No.
HB
Date
SB
Date
Sheet
0.299 T
V (T)
6.3.2
MGC
1.62
-5.5
1.8
4.255
5.4
0.650
1.126
8.628
0.820
8.497
1.498
0.000
0.000
3.028
m
m
T/m^2
T/m^2
T
m
Factor For Height =0.66/(1/2)=
1.32
T
T
Hor Force Long & Height Hor ForceTrans & Height
HL (T)
ev (m)
HT (T)
ev (m)
-5.5
0.000
0.000
8.497
Modified Height
1.082
1.08177
Cl of IR Track
4.810
0.2
Dyn. Inc. of DL+LL Surch. on Scrn wall
3.31
3.000
S
B
V
D
B+2D
13.7
3
3.6
3.310
10.220
T/m
m
T/m
m
m
h1
D=
###
On screen wall Dead + Live load surcharge come from adjoining Indian Railway tracks
2
6.3.3
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Pressure P1=
0.22394434 T/m^2
MGC
File No.
HB
Date
SB
Date
0.3
P1
F
h1
Force F
0.945 m
5.4 m
h1
Sheet
h2
1.14278798 T
= 0.945* 0.66 =
P1
0.624 m
Horizontal Component
Vertical Component
1.125 T
0.198 T
V (T)
0.000
0.000
0.624
6.4
Descrioption
Dyn. Inc. of Earth Pres. on Dirt wall
Dyn. Inc. of DL Surcharge on Dirt wall
Dyn. Inc. of LL Surcharge on Dirt wall
TOTAL
V (T)
-2.700
-2.700
-2.700
22.417
8.141
5.440
35.999
1.978
2.610
2.610
0.000
0.000
0.000
33.658
17.376
11.611
62.644
0.000
0.000
2.014
2.014
Descrioption
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Descrioption
eL (m)
V (T)
6.4
6.2.1
6.2.2
6.2.3
6.3.1
6.3.2
6.3.3
3.953
1.436
1.919
7.307
eT (m)
6.1.1
6.1.2
6.1.3
-2.700
-2.700
-2.700
HL (T)
0.000
0.000
0.000
22.417
8.141
10.880
41.439
ev (m)
1.978
2.610
2.610
6.5
6.5.1
6.348
2.787
File No.
HB
Date
SB
ev (m)
0.000
0.000
0.000
Date
ML (T.m)
33.658
17.376
23.221
74.254
Sheet
MT (T.m)
0.000
0.000
0.000
0.000
2.878
3.222
2.122
-0.468
-0.312
-0.074
7.965
5.765
1.022
1.696
8.497
1.125
14.939
3.028
1.082
0.624
0.484
0.000
0.000
-0.370
3.490
0.951
-0.390
18.803
(Sx + 0.3 Sy )
HL (T)
V (T)
HT (T)
0.000
0.000
0.000
0.000
MGC
HT (T)
35.999
0.000
0.000
14.939
ML (T.m)
62.644
-0.370
MT (T.m)
2.014
18.803
DYNAMIC INCREMENT Page 68 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Combination
6.5.2
7.307
2.787
8.143
HT (T)
41.439
0.000
41.439
HL (T)
V (T)
6.348
2.787
4.692
35.999
0.000
10.800
7.307
2.787
4.979
6.348
2.787
ML (T.m)
0.000
14.939
4.482
Date
7.655
74.254
-0.370
74.143
MT (T.m)
0.000
18.803
5.641
ML (T.m)
MT (T.m)
0.000
62.644
2.014
14.939
-0.370
18.803
14.939
18.423
19.408
HT (T)
41.439
0.000
12.432
ML (T.m)
0.000
14.939
14.939
74.254
-0.370
21.906
MT (T.m)
0.000
18.803
18.803
(0.3 Sx + 0.3Sy )
HL (T)
V (T)
SB
Sheet
(0.3 Sx + Sy )
Date
HT (T)
HL (T)
V (T)
62.533
HB
(0.3 Sx + Sy )
6.5.5
HL (T)
V (T)
4.482
File No.
(Sx + 0.3 Sy )
6.5.4
35.999
6.5.3
7.184
MGC
HT (T)
35.999
0.000
0.000
14.939
ML (T.m)
62.644
-0.370
MT (T.m)
2.014
18.803
DYNAMIC INCREMENT Page 69 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Combination
6.5.6
2.740
10.800
7.307
2.787
3.028
18.682
File No.
HB
Date
SB
Date
Sheet
6.245
(0.3 Sx + 0.3Sy )
HL (T)
V (T)
4.482
MGC
HT (T)
41.439
0.000
12.432
0.000
14.939
4.482
ML (T.m)
74.254
-0.370
22.165
MT (T.m)
0.000
18.803
5.641
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
7.0
7.1
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Load
1
2
3
4
5
6
7
8
DL
SIDL
EQ
WL
TU
EP
LFP
LL
ULS-1
1.250
2.000
1.700
1.500
1.750
1.700
1.250
1.400
1.700
1.700
1.250
1.400
ULS-3
1.250
2.000
1.500
1.700
1.250
1.400
Load
1
2
3
4
5
6
7
8
DL
SIDL
EQ
WL
TU
EP
LFP
LL
SLS-1
1.000
1.200
1.000
1.000
1.100
1.000
1.000
1.000
1.000
1.000
1.000
1.000
SLS-3
1.000
1.200
1.000
1.000
1.000
1.000
Project
7.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Normal Case One - Track Loaded Condiition ie transverse maximum moment case
S.No
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
4.1
4.1.1
4.1.2
4.1.3
4.2
4.2.1
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
Superimposed Dead Load (SIDL)
106.128
Live Load (LL)
94.127
Walkway Live Load
7.832
Long Welded Rail Force
-2.703
Breaking and Tractive Force
-2.453
Raking Force
0.000
Transverse Wind Force on Coach
0.000
Longitudinal Wind Force on Coach
-0.288
Trans. Wind Force on Superstructure
0.000
Load from Substructure
Dead Load of Pedestals
1.504
Dead Load of Dirt Wall
20.254
Dead Load of Dirt Wall Bracket
3.713
Dead Load of Return Wall
4.971
Dead Load of Screen Wall
2.854
Dead Load of Pile Cap
267.300
Weight of Soil Above Pile Cap
174.992
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
Dead Load Surcharge on Dirt wall
3.347
Live Load Surcharge on Dirt wall
2.237
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
1.700
1.700
1.700
1.700
1.700
1.700
0.000
0.000
1.700
0.000
0.000
0.000
2.100
4.978
0.000
2.100
0.000
0.000
2.100
0.000
0.000
0.000
0.000
0.000
29.980
27.200
0.000
0.000
1.859
0.000
0.000
0.000
0.000
0.000
2.105
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
0.000
5.996
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
160.017
13.315
58.512
53.086
0.000
0.000
3.423
0.000
0.000
0.000
197.668
38.985
0.000
-5.151
27.923
43.528
-0.604
31.743
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
-2.700
-2.700
-2.700
0.000
0.000
2.100
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
44.024
28.501
19.045
0.000
0.000
4.697
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Project
7.2.1
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
eL (m)
eT (m)
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Earth Pressure on Pile cap
3.494
0.000
-5.500
0.000
0.000
19.813
0.820
0.000
-2.977
Dead+Live Load Surch. on Screen wall
0.463
0.000
-5.500
0.000
0.000
2.624
0.473
0.000
-1.305
ULS-1
1278.63316
190.29196
70.1635054
1141.534 525.706443
ULS-2a
1105.99377
145.66556
84.0137439
754.109 200.925218
ULS-2b
1244.22927
183.095085
87.0830604
1067.898 532.139379
ULS-3
1240.53374
225.74196
68.0649054
1151.388 438.806148
SLS-1
943.697687
113.856447
41.6958973
741.835 332.397788
SLS-2a
834.736
85.795
50.3148213
497.530
125.5952
SLS-2b
934.242455
112.994947
56.3108213
723.948 385.02037
SLS-3
931.826731
141.116447
41.0962973
779.037 310.353786
ULS-1 Horizontal and Vertical Loads in Pile
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
1278.63316 T
eL
Pile Id
190.29196 T
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
70.164 T
1141.534 Tm
2
3
1.8
1.8
0
3.6
3.24
3.24
0
12.96
213.105526 105.697624
0
318.803151
213.105526 105.697624 36.5073919 355.310542
525.706 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
VP min
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
355.311 T
70.901 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
355.310542 T
31.715 T
19.44
51.84
1278.63316 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
11.694 T
1278.63316
143.915294 T
PILE GROUP LSL Page 73 of 365
Project
7.2.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
HB
Date
Checked by
SB
Date
Sheet
1105.99377 T
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
84.014 T
1.8
3.24
754.109 Tm
1.8
3.6
3.24
12.96
200.925 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
268.110 T
VP min
100.554 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
268.110325 T
184.332295 69.8248897
19.44
51.84
1105.99377 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
14.002 T
24.278 T
1105.99377
128.460545 T
Vertical Load V
Horizontal Load Longitudinal HL
Nr of Piles n
Vertical Load on Pile VP
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
87.083 T
1.8
3.24
1067.898 Tm
1.8
3.6
3.24
12.96
532.139 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
Moment Transverse MT
1244.22927 T
183.095085 T
VP min
Calc by
Moment Longitudinal ML
VP max
File No.
145.66556 T
7.2.3
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
343.205 T
71.538 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
343.20514 T
30.516 T
19.44
51.84
1244.22927 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
14.514 T
306.251017
1244.22927
145.446195 T
PILE GROUP LSL Page 74 of 365
Project
7.2.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Vertical Load V
Horizontal Load Longitudinal HL
Nr of Piles n
Vertical Load on Pile VP
VP max
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
68.065 T
1.8
3.24
1151.388 Tm
1.8
3.6
3.24
12.96
438.806 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
Moment Transverse MT
1240.53374 T
225.74196 T
343.838 T
VP min
69.673 T
For Pile cap Design
Max Vp Front Row
7.2.5
Discipline
Total
Hor Load On Pile in Long Dir HPL
343.838232 T
206.755623 106.609961
19.44
51.84
1240.53374
Horizontal Force on Pile in Trans Dir HPT
37.624 T
313.365583
1240.53374
MT.eT/eT2
Vp
11.344 T
130.618311 T
Vertical Load V
Horizontal Load Longitudinal HL
eT
eL2
eT2
V/n
ML.eL/eL2
1.8
-3.6
3.24
12.96
41.696 T
1.8
3.24
741.835 Tm
1.8
3.6
3.24
12.96
332.398 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
Nr of Piles n
Vertical Load on Pile VP
eL
Pile Id
113.856447 T
943.697687 T
VP max
249.055 T
VP min
65.511 T
Total
Hor Load On Pile in Long Dir HPL
18.976 T
19.44
51.84
943.697687 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
6.949 T
225.971386
111.67769
943.697687
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Max Vp Front Row
7.2.6
249.054565 T
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
111.67769 T
eL2
eT2
-3.6
3.24
12.96
1.8
3.24
1.8
3.6
3.24
12.96
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
834.736 T
85.795 T
1.8
50.315 T
497.530 Tm
125.595 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Longitudinal ML
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
VP max
193.912 T
VP min
84.333 T
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
7.2.7
Discipline
Total
Hor Load On Pile in Long Dir HPL
193.912088 T
ML.eL/eL2
MT.eT/eT2
Vp
176.46831
139.122598 46.0676018
185.190199
19.44
51.84
834.735585 1.4211E-014
0
Horizontal Force on Pile in Trans Dir HPT
8.386 T
14.299 T
V/n
834.735585
101.776885 T
Vertical Load V
Horizontal Load Longitudinal HL
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
56.311 T
1.8
3.24
723.948 Tm
1.8
3.6
3.24
12.96
385.020 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
Nr of Piles n
Vertical Load on Pile VP
eL
Pile Id
112.994947 T
934.242455 T
VP max
249.477 T
VP min
61.937 T
Total
Hor Load On Pile in Long Dir HPL
18.832 T
19.44
51.84
934.242455 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
9.385 T
222.739278
115.4124
934.242455
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
7.2.8
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
115.4124 T
Moment Transverse MT
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
41.096 T
1.8
3.24
779.037 Tm
1.8
3.6
3.24
12.96
310.354 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
Nr of Piles n
Vertical Load on Pile VP
931.826731 T
141.116447 T
VP min
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
249.476803 T
Discipline
248.990 T
61.619 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
248.989839 T
23.519 T
19.44
51.84
931.826731 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
6.849 T
227.437492
931.826731
104.723764 T
Project
7.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Normal Case Two- Track Loaded Condiition ie Longitudinal maximum moment case
S.No
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
Descrioption
Loads From Superstructure
Dead Load of Girder + Slab
Superimposed Dead Load (SIDL)
Live Load (LL)
Walkway Live Load
Long Welded Rail Force
Breaking and Tractive Force
Raking Force
Transverse Wind Force on Coach
Longitudinal Wind Force on Coach
Trans. Wind Force on Superstructure
Load from Substructure
Dead Load of Pedestals
Dead Load of Dirt Wall
Dead Load of Dirt Wall Bracket
Dead Load of Return Wall
Dead Load of Screen Wall
Dead Load of Pile Cap
Weight of Soil Above Pile Cap
V (T)
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
210.724
106.128
188.255
15.665
-2.703
-4.660
0.000
0.000
-0.576
0.000
1.700
1.700
1.700
1.700
1.700
1.700
0.000
0.000
1.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
29.980
51.680
0.000
0.000
3.717
0.000
0.000
0.000
0.000
0.000
2.105
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
0.000
11.992
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
320.033
26.630
58.512
100.864
0.000
0.000
6.846
0.000
0.000
0.000
0.000
0.000
0.000
0.000
55.847
43.528
0.000
31.743
1.504
20.254
3.713
4.971
2.854
267.300
174.992
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
Project
7.3.1
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
0.000
52.269
1.318
0.000
0.000
44.024
0.000
Dead Load Surcharge on Dirt wall
3.347
-2.700
0.000
18.983
1.978
0.000
0.000
28.501
0.000
Live Load Surcharge on Dirt wall
4.473
-2.700
0.000
25.369
1.978
0.000
0.000
38.090
0.000
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
eL (m)
eT (m)
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
Earth Pressure on Pile cap
3.494
Dead+Live Load Surch. on Screen wall
0.463
ULS-1
1455.04363
ULS-2a
1109.33561
ULS-2b
1386.15
ULS-3
1382.81418
SLS-1
1054.87846
SLS-2a
836.684
SLS-2b
1035.94347
SLS-3
1033.81551
1.620
0.000
0.000
-5.500
-5.500
-5.500
0.000
0.000
0.000
254.695744
170.202944
241.253994
281.577744
153.469026
100.338
152.018026
178.281026
eL
eT
0.000
0.000
0.000
3.955
19.813
2.624
80.6565054
84.0137439
95.4774604
76.4593054
48.2914973
50.3148213
62.3068213
47.0922973
2.618
0.820
0.473
1.130
0.000
0.000
1557.523
791.962
1412.109
1491.319
1002.768
519.998
967.525
1019.191
6.519
-2.977
-1.305
171.205703
193.90735
245.747975
151.659342
107.663103
121.502591
177.349335
102.078429
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
242.507272 144.215065
0
386.722337
242.507272 144.215065 11.8892849 398.611622
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
1455.04363 T
254.695744 T
1.8
80.657 T
1557.52271 Tm
2
3
171.206 Tm
6
4
5
Moment Transverse MT
Pile Id
eL2
Vertical Load V
Horizontal Load Longitudinal HL
Nr of Piles n
Discipline
V/n
ML.eL/eL2
MT.eT/eT2
Vp
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
= V / n + ML.eL/eL + MT.eT/eT
2
86.403 T
For Pile cap Design
Max Vp Front Row
3.6
Total
Hor Load On Pile in Long Dir HPL
398.611622 T
Calc by
HB
Date
Checked by
SB
Date
3.24
12.96
Sheet
19.44
51.84
1455.04363 5.6843E-014
0
Horizontal Force on Pile in Trans Dir HPT
13.443 T
42.449 T
File No.
1455.04363
110.181491 T
Moment Transverse MT
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
84.014 T
1.8
3.24
791.962 Tm
1.8
3.6
3.24
12.96
193.907 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
Nr of Piles n
Vertical Load on Pile VP
1109.33561 T
170.202944 T
271.685 T
VP min
98.094 T
For Pile cap Design
Max Vp Front Row
7.3.3
-1.8
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
398.612 T
VP min
7.3.2
Discipline
Total
Hor Load On Pile in Long Dir HPL
271.684847 T
184.889269 73.3297899
19.44
51.84
1109.33561 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
14.002 T
28.367 T
1109.33561
125.025267 T
Vertical Load V
Horizontal Load Longitudinal HL
1386.15 T
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
241.253994 T
1.8
-3.6
3.24
12.96
231.025
95.477 T
1.8
3.24
231.025
130.750801
Moment Longitudinal ML
1412.109 Tm
1.8
3.6
3.24
12.96
231.025
Moment Transverse MT
245.748 Tm
6
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
231.025
231.025
Nr of Piles n
361.7758
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
= V / n + ML.eL/eL + MT.eT/eT
2
83.208 T
For Pile cap Design
Max Vp Front Row
3.6
Total
Hor Load On Pile in Long Dir HPL
378.841632 T
Calc by
HB
Date
Checked by
SB
Date
3.24
12.96
231.025
19.44
51.84
1386.15
Horizontal Force on Pile in Trans Dir HPT
40.209 T
File No.
Sheet
-130.750801 17.0658316
0
117.34003
1386.15
MT.eT/eT2
Vp
15.913 T
117.34003 T
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
1382.81418 T
eL
Pile Id
eT
281.577744 T
1.8
eL2
eT2
V/n
ML.eL/eL2
-3.6
3.24
12.96
230.46903
76.459 T
1.8
3.24
230.46903
138.085116
1491.319 Tm
1.8
3.6
3.24
12.96
230.46903
151.659 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
379.086 T
VP min
81.852 T
For Pile cap Design
Max Vp Front Row
7.3.5
-1.8
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
378.842 T
VP min
7.3.4
Discipline
Total
Hor Load On Pile in Long Dir HPL
379.086045 T
19.44
51.84
1382.81418 -5.684E-014
0
Horizontal Force on Pile in Trans Dir HPT
12.743 T
46.930 T
368.554147
1382.81418
102.915813 T
Vertical Load V
Horizontal Load Longitudinal HL
Horizontal Load Transverse HT
1054.87846 T
eL
Pile Id
eT
153.469026 T
1.8
eL2
eT2
-3.6
3.24
12.96
V/n
ML.eL/eL2
MT.eT/eT2
Vp
48.291 T
1.8
3.24
Moment Longitudinal ML
1002.768 Tm
1.8
3.6
3.24
12.96
175.813076 92.8489303
268.662007
Moment Transverse MT
107.663 Tm
-1.8
-3.6
3.24
12.96
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Nr of Piles n
Vertical Load on Pile VP
VP max
6
2
= V / n + ML.eL/eL + MT.eT/eT2
-1.8
-1.8
3.6
276.139 T
VP min
75.488 T
For Pile cap Design
Max Vp Front Row
7.3.6
5
Total
Calc by
HB
Date
Sheet
Checked by
3.24
0
SB
Date
175.813076 -92.8489303
3.24
12.96
82.964146
1054.87846
eL2
eT2
-3.6
3.24
12.96
1.8
3.24
1.8
3.6
3.24
12.96
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
100.338 T
1.8
50.315 T
519.998 Tm
121.503 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
Moment Longitudinal ML
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
836.684 T
196.033 T
VP min
82.862 T
For Pile cap Design
Max Vp Front Row
7.3.7
File No.
90.4407505 T
Vertical Load V
Horizontal Load Longitudinal HL
VP max
MGC
19.44
51.84
1054.87846 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
8.049 T
25.578 T
Discipline
Total
Hor Load On Pile in Long Dir HPL
196.033039 T
ML.eL/eL2
MT.eT/eT2
Vp
19.44
51.84
836.684447
Horizontal Force on Pile in Trans Dir HPT
16.723 T
V/n
187.595359
836.684447
MT.eT/eT2
Vp
8.386 T
99.7371365 T
Vertical Load V
Horizontal Load Longitudinal HL
Horizontal Load Transverse HT
Moment Longitudinal ML
1035.94347 T
eL
Pile Id
eT
eL2
eT2
152.018026 T
1.8
-3.6
3.24
12.96
62.307 T
1.8
3.24
967.525 Tm
1.8
3.6
3.24
V/n
ML.eL/eL2
249.92693
172.657245 89.5856119
262.242856
12.96
172.657245 89.5856119
12.315926 274.558782
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
VP max
177.349 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
7.3.8
HB
Date
Checked by
SB
Date
Sheet
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
19.44
51.84
1035.94347 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
10.384 T
25.336 T
1035.94347
95.3875588 T
Nr of Piles n
Vertical Load on Pile VP
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
47.092 T
1.8
3.24
1019.191 Tm
1.8
3.6
3.24
12.96
102.078 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Longitudinal ML
Moment Transverse MT
1033.81551 T
178.281026 T
273.761 T
VP min
70.844 T
For Pile cap Design
Max Vp Front Row
7.4
Calc by
Vertical Load V
Horizontal Load Longitudinal HL
VP max
File No.
-1.8
-1.8
Total
274.558782 T
MGC
4
5
274.559 T
VP min
70.756 T
For Pile cap Design
Max Vp Front Row
Discipline
Total
Hor Load On Pile in Long Dir HPL
273.760875 T
29.714 T
19.44
51.84
1033.81551
Horizontal Force on Pile in Trans Dir HPT
266.672095
85.021856
1033.81551
7.849 T
85.021856 T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
VP max
VP min
HPL
Description
Normal Case One - Track Loaded Condiition ie transverse maximum moment case
ULS-1 Horizontal and Vertical Loads in Pile
355.311
70.901
ULS-2a Horizontal and Vertical Loads in Pile
268.110
100.554
ULS-2b Horizontal and Vertical Loads in Pile
343.205
71.538
ULS-3 Horizontal and Vertical Loads in Pile
343.838
69.673
Normal Case Two- Track Loaded Condiition ie Longitudinal maximum moment case
ULS-1 Horizontal and Vertical Loads in Pile
398.612
86.403
ULS-2a Horizontal and Vertical Loads in Pile
271.685
98.094
ULS-2b Horizontal and Vertical Loads in Pile
378.842
83.208
ULS-3 Horizontal and Vertical Loads in Pile
379.086
81.852
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
HPT
Hp
31.715 11.6939176
24.278 14.002
30.516 14.514
37.624
11.344
33.803
28.026
33.792
39.297
42.449
28.367
40.209
46.930
13.443
14.002
15.913
12.743
44.527
31.635
43.243
48.629
HPT
Hp
18.976
14.299
18.832
23.519
6.949
8.386
9.385
6.849
20.209
16.577
21.041
24.496
25.578
16.723
25.336
29.714
8.049
8.386
10.384
7.849
26.815
18.708
27.382
30.733
Sheet
284 T
0 T
13.9 T
OK
OK (NO TENSION)
NOT OK
The Pile Cannot Take the Horizontal Forces in the system for 5 mm deflection
We Provide Shear Key in Longitudinal Direction to Take the Longitudianal Component
Transverse component is taken by Piles
PILE GROUP LSL Page 84 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Max Transverse Horizontal Load
10.384
<
13.9 T
273.761 T
61.619 T
30.733 T
<
>
>
326.6 T
0 T
13.9 T
7.849
<
13.9 T
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
However The Piles will be designed for Moment Due to these Forces due to resultant
OK
OK
OK (NO TENSION)
NOT OK
The Pile Cannot Take the Horizontal Forces in the system for 5 mm deflection
We Provide Shear Key in Longitudinal Direction to Take the Longitudianal Component
Transverse component is taken by Piles
However The Piles will be designed for Moment Due to these Forces due to resultant
OK
S.No
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.6
3.1.7
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
Descrioption
Loads From Superstructure
Dead Load of Girder + Slab
Superimposed Dead Load (SIDL)
Live Load (LL)
Walkway Live Load
Breaking and Tractive Force
Raking Force
Load from Substructure
Dead Load of Pedestals
Dead Load of Dirt Wall
Dead Load of Dirt Wall Bracket
Dead Load of Return Wall
Dead Load of Screen Wall
V (T)
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
210.724
106.128
47.064
3.916
-1.226
0.000
1.700
1.700
1.700
1.700
1.700
0.000
0.000
0.000
2.100
4.978
2.100
0.000
0.000
0.000
0.000
0.000
13.600
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
2.998
0.000
0.000
0.000
0.000
0.000
4.657
358.231
180.418
80.008
6.657
26.543
0.000
0.000
0.000
98.834
19.493
-2.575
13.962
1.504
20.254
3.713
4.971
2.854
1.700
0.690
0.407
-1.080
1.770
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
0.000
0.000
26.713
-15.335
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Dead Load of Pile Cap
267.300
Weight of Soil Above Pile Cap
174.992
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
Dead Load Surcharge on Dirt wall
3.347
Live Load Surcharge on Dirt wall
2.237
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
Dead Load Surcharge on Return wall
0.696
Live Load Surcharge on Return wall
0.165
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
0.000
0.000
0.000
0.000
0.000
0.000
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
5.200
5.200
5.200
0.000
0.000
0.000
0.000
0.000
0.000
4.773
3.181
0.754
-5.500
0.000
0.000
3.955
0.000
-1.080
0.000
0.000
0.000
0.000
-2.700
-2.700
-2.700
0.000
0.000
2.100
-1.080
-1.080
-1.080
1.620
Sheet
Date
0.000
-188.992
0.000
0.000
2.518
2.878
2.044
44.024
28.501
19.045
0.000
-1.127
-0.751
-0.178
0.000
0.000
4.697
0.000
17.446
12.771
2.400
2.618
1.130
6.519
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
S.No
4.3.2
4.3.3
5.5.1
6.5.1
7.5.1
Descrioption
V (T)
0.000
0.000
-5.500
-5.500
File No.
Calc by
HB
Date
Sheet
0.000
0.000
166.394
35.999
466.520
414.723
286.329
299.929
0.000
0.000
19.813
2.624
38.746
4.482
128.835
117.903
78.328
81.326
0.820
0.473
0.000
0.000
331.286
62.533
1378.742
1398.399
887.926
1001.135
-2.977
-1.305
106.322
7.655
263.823
402.604
164.906
294.619
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
4
5
-1.8
-1.8
-3.6
0
-1.8
3.6
1148.18208 T
466.52017 T
1.8
128.835 T
1378.74188 Tm
2
3
263.823 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
MGC
Checked by
SB
Date
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
3.494
0.463
18.896
7.184
1148.182
1208.121
861.103
910.857
Discipline
337.346 T
VP min
45.381 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
337.345985 T
77.753 T
MT.eT/eT2
Vp
191.36368 127.661285
-18.32102
300.703945
0
12.96
191.36368 127.661285
191.36368 127.661285
0
18.32102
319.024965
337.345985
3.24
3.24
12.96
0
45.3813743
63.7023943
3.24
12.96
191.36368 -127.661285
18.32102
82.0234143
1148.18208
V/n
19.44
51.84
1148.18208
Horizontal Force on Pile in Trans Dir HPT
ML.eL/eL2
0
21.473 T
82.0234143 T
Project
7.5.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
eL
Calc by
HB
Date
Checked by
SB
Date
Sheet
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
201.353582 129.481401
0
330.834983
201.353582 129.481401 27.9586316 358.793615
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
414.723 T
1.8
117.903 T
1398.399 Tm
2
3
402.604 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
358.794 T
VP min
43.914 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
358.793615 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
1208.12149 5.6843E-014
0
Horizontal Force on Pile in Trans Dir HPT
19.650 T
69.120 T
Vp
1208.12149
99.8308128 T
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
151.809452 82.2153491
0
234.024801
151.809452 82.2153491 11.4518138 245.476615
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
910.857 T
286.329 T
1.8
78.328 T
887.926 Tm
2
3
164.906 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
File No.
eL2
Pile Id
eT
1208.121 T
7.5.3
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
245.477 T
VP min
58.142 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
245.476615 T
47.722 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
910.856713 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
13.055 T
Vp
910.856713
81.0459169 T
Project
7.5.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
151.809452 92.697649
0
244.507101
151.809452 92.697649 20.4596322 264.966733
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
910.857 T
299.929 T
1.8
81.326 T
1001.135 Tm
2
3
294.619 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
264.967 T
VP min
38.652 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
264.966733 T
49.988 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
910.856713 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
13.554 T
Vp
910.856713
79.5714354 T
Project
7.6
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
Superimposed Dead Load (SIDL)
106.128
Live Load (LL)
94.127
Walkway Live Load
7.832
Breaking and Tractive Force
-2.330
Raking Force
0.000
Load from Substructure
Dead Load of Pedestals
1.504
Dead Load of Dirt Wall
20.254
Dead Load of Dirt Wall Bracket
3.713
Dead Load of Return Wall
4.971
Dead Load of Screen Wall
2.854
Dead Load of Pile Cap
267.300
Weight of Soil Above Pile Cap
174.992
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
Dead Load Surcharge on Dirt wall
3.347
Live Load Surcharge on Dirt wall
2.237
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
Dead Load Surcharge on Return wall
0.696
Live Load Surcharge on Return wall
0.165
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
1.700
1.700
1.700
1.700
1.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
25.840
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
5.996
0.000
0.000
0.000
0.000
0.000
4.657
358.231
180.418
160.017
13.315
50.432
0.000
0.000
0.000
0.000
0.000
0.000
27.923
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
-2.700
-2.700
-2.700
0.000
0.000
2.100
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
-1.080
-1.080
-1.080
5.200
5.200
5.200
0.000
0.000
0.000
0.000
0.000
0.000
4.773
3.181
0.754
2.518
2.878
2.044
44.024
28.501
19.045
0.000
-1.127
-0.751
-0.178
0.000
0.000
4.697
0.000
17.446
12.771
2.400
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
S.No
4.3.2
4.3.3
5.5.2
6.5.2
7.6.1
Descrioption
V (T)
0.000
0.000
-5.500
-5.500
File No.
Calc by
HB
Date
Sheet
0.000
0.000
166.394
35.999
466.520
431.859
286.329
312.169
0.000
0.000
19.813
2.624
38.746
4.482
128.835
122.100
78.328
84.324
0.820
0.473
0.000
0.000
333.035
74.143
1400.117
1568.876
901.285
1125.049
-2.977
-1.305
114.173
5.641
273.160
270.318
170.742
198.666
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
191.893835 129.640479
0
321.534314
191.893835 129.640479 18.9694713 340.503785
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
1151.36301 T
466.52017 T
1.8
128.835 T
1400.11717 Tm
2
3
273.160 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
MGC
Checked by
SB
Date
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
3.494
0.463
19.925
8.143
1151.363
1279.846
863.091
962.721
Discipline
340.504 T
VP min
43.284 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
340.503785 T
77.753 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
1151.36301 -5.684E-014
0
Horizontal Force on Pile in Trans Dir HPT
21.473 T
Vp
1151.36301
81.2228275 T
Project
7.6.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
eL
Calc by
HB
Date
Checked by
SB
Date
Sheet
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
213.307614 145.266324
0
358.573938
213.307614 145.266324 18.7721083 377.346046
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
431.859 T
1.8
122.100 T
1568.876 Tm
2
3
270.318 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
377.346 T
VP min
49.269 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
377.346046 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
1279.84568 5.6843E-014
0
Horizontal Force on Pile in Trans Dir HPT
20.350 T
71.976 T
Vp
1279.84568
86.8133979 T
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
143.84856 83.4523449
0
227.300905
143.84856 83.4523449 11.8570958 239.158001
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
863.091 T
286.329 T
1.8
78.328 T
901.285 Tm
2
3
170.742 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
File No.
eL2
Pile Id
eT
1279.846 T
7.6.3
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
239.158 T
VP min
48.539 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
239.158001 T
47.722 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
863.091361 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
13.055 T
Vp
72.253311
863.091361
72.253311 T
Project
7.6.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
160.453478 104.171175
0
264.624654
160.453478 104.171175 13.7962189 278.420873
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
962.721 T
312.169 T
1.8
84.324 T
1125.049 Tm
2
3
198.666 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
278.421 T
VP min
42.486 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
278.420873 T
52.028 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
962.720871 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
14.054 T
Vp
962.720871
70.0785222 T
Project
7.7
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
Superimposed Dead Load (SIDL)
106.128
Live Load (LL)
47.064
Walkway Live Load
3.916
Breaking and Tractive Force
-1.226
Raking Force
0.000
Load from Substructure
Dead Load of Pedestals
1.504
Dead Load of Dirt Wall
20.254
Dead Load of Dirt Wall Bracket
3.713
Dead Load of Return Wall
4.971
Dead Load of Screen Wall
2.854
Dead Load of Pile Cap
267.300
Weight of Soil Above Pile Cap
174.992
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
Dead Load Surcharge on Dirt wall
3.347
Live Load Surcharge on Dirt wall
2.237
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
Dead Load Surcharge on Return wall
0.696
Live Load Surcharge on Return wall
0.165
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
1.700
1.700
1.700
1.700
1.700
0.000
0.000
0.000
2.100
4.978
2.100
0.000
0.000
0.000
0.000
0.000
13.600
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
2.998
0.000
0.000
0.000
0.000
0.000
4.657
358.231
180.418
80.008
6.657
26.543
0.000
0.000
0.000
98.834
19.493
-2.575
13.962
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
-2.700
-2.700
-2.700
0.000
0.000
2.100
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
-1.080
-1.080
-1.080
5.200
5.200
5.200
0.000
0.000
0.000
0.000
0.000
0.000
4.773
3.181
0.754
2.518
2.878
2.044
44.024
28.501
19.045
0.000
-1.127
-0.751
-0.178
0.000
0.000
4.697
0.000
17.446
12.771
2.400
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
S.No
4.3.2
4.3.3
5.5.3
6.5.3
7.7.1
Descrioption
V (T)
0.000
0.000
-5.500
-5.500
File No.
Calc by
HB
Date
Sheet
0.000
0.000
49.918
10.800
239.840
237.629
144.654
158.254
0.000
0.000
19.813
2.624
124.010
14.939
281.989
237.554
174.049
177.047
0.820
0.473
0.000
0.000
108.325
18.423
951.429
1064.561
620.855
734.064
-2.977
-1.305
348.569
19.408
670.222
720.104
418.905
548.618
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
191.801517 88.0952618
0
279.896779
191.801517 88.0952618 46.5431718 326.439951
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
239.840423 T
1.8
281.989 T
951.428828 Tm
2
3
670.222 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
1150.809 T
eL
Vertical Load V
Horizontal Load Longitudinal HL
VP max
MGC
Checked by
SB
Date
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
3.494
0.463
23.030
4.692
1150.809
1210.174
862.745
912.499
Discipline
326.440 T
VP min
57.163 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
326.439951 T
39.973 T
V/n
19.44
51.84
1150.8091
Horizontal Force on Pile in Trans Dir HPT
ML.eL/eL2
MT.eT/eT2
Vp
1150.8091
46.998 T
150.249427 T
Project
7.7.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
eL
Calc by
HB
Date
Checked by
SB
Date
Sheet
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
201.695643 98.5704452
0
300.266088
201.695643 98.5704452 50.0071877 350.273276
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
237.629 T
1.8
237.554 T
1064.561 Tm
2
3
720.104 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
350.273 T
VP min
53.118 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
350.273276 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
1210.17386 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
39.592 T
39.605 T
Vp
1210.17386
153.132386 T
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
143.790862 57.4865844
0
201.277446
143.790862 57.4865844 29.0906587 230.368105
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
862.745 T
144.654 T
1.8
174.049 T
620.855 Tm
2
3
418.905 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
File No.
eL2
Pile Id
eT
1210.174 T
7.7.3
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
230.368 T
VP min
57.214 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
230.368105 T
24.109 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
862.74517 -1.421E-014
0
Horizontal Force on Pile in Trans Dir HPT
29.008 T
Vp
862.74517
115.394936 T
Project
7.7.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
152.083101 67.9688844
0
220.051985
152.083101 67.9688844 38.0984771 258.150462
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
912.499 T
158.254 T
1.8
177.047 T
734.064 Tm
2
3
548.618 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
258.150 T
VP min
46.016 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
258.150462 T
26.376 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
912.498605 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
29.508 T
Vp
912.498605
122.212694 T
Project
7.8
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
Superimposed Dead Load (SIDL)
106.128
Live Load (LL)
94.127
Walkway Live Load
7.832
Breaking and Tractive Force
-2.330
Raking Force
0.000
Load from Substructure
Dead Load of Pedestals
1.504
Dead Load of Dirt Wall
20.254
Dead Load of Dirt Wall Bracket
3.713
Dead Load of Return Wall
4.971
Dead Load of Screen Wall
2.854
Dead Load of Pile Cap
267.300
Weight of Soil Above Pile Cap
174.992
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
Dead Load Surcharge on Dirt wall
3.347
Live Load Surcharge on Dirt wall
2.237
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
Dead Load Surcharge on Return wall
0.696
Live Load Surcharge on Return wall
0.165
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
1.700
1.700
1.700
1.700
1.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
25.840
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
5.996
0.000
0.000
0.000
0.000
0.000
4.657
358.231
180.418
160.017
13.315
50.432
0.000
0.000
0.000
0.000
0.000
0.000
27.923
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
-2.700
-2.700
-2.700
0.000
0.000
2.100
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
-1.080
-1.080
-1.080
5.200
5.200
5.200
0.000
0.000
0.000
0.000
0.000
0.000
4.773
3.181
0.754
2.518
2.878
2.044
44.024
28.501
19.045
0.000
-1.127
-0.751
-0.178
0.000
0.000
4.697
0.000
17.446
12.771
2.400
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
S.No
4.3.2
4.3.3
5.5.4
6.5.4
7.8.1
Descrioption
V (T)
0.000
0.000
-5.500
-5.500
File No.
Calc by
HB
Date
Sheet
0.000
0.000
49.918
12.432
242.452
256.805
146.286
172.126
0.000
0.000
19.813
2.624
129.154
14.939
290.220
248.181
179.193
185.189
0.820
0.473
0.000
0.000
110.074
-0.370
924.158
1197.033
603.811
827.574
-2.977
-1.305
379.779
18.803
719.190
618.779
449.511
477.434
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
192.152612 85.5702098
0
277.722822
192.152612 85.5702098 49.9437541 327.666576
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
242.451714 T
1.8
290.220 T
924.158266 Tm
2
3
719.190 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
1152.916 T
eL
Vertical Load V
Horizontal Load Longitudinal HL
VP max
MGC
Checked by
SB
Date
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
3.494
0.463
24.059
4.979
1152.916
1281.059
864.062
963.691
Discipline
327.667 T
VP min
56.639 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
327.666576 T
40.409 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
1152.91567 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
48.370 T
Vp
1152.91567
156.526157 T
Project
7.8.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
eL
Calc by
HB
Date
Checked by
SB
Date
Sheet
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
213.509783 110.836426
0
324.34621
213.509783 110.836426 42.9707668 367.316977
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
256.805 T
1.8
248.181 T
1197.033 Tm
2
3
618.779 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
367.317 T
VP min
59.703 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
367.316977 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
1281.0587 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
41.364 T
42.801 T
Vp
1281.0587
145.644124 T
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
144.010296 55.9084269
0
199.918723
144.010296 55.9084269 31.2160227 231.134745
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
864.062 T
146.286 T
1.8
179.193 T
603.811 Tm
2
3
449.511 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
File No.
eL2
Pile Id
eT
1281.059 T
7.8.3
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
231.135 T
VP min
56.886 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
231.134745 T
24.381 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
864.061776 1.4211E-014
0
Horizontal Force on Pile in Trans Dir HPT
29.866 T
Vp
168.7027
864.061776
119.317892 T
Project
7.8.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
160.615214 76.6272572
0
237.242472
160.615214 76.6272572 33.1551457 270.397617
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
963.691 T
172.126 T
1.8
185.189 T
827.574 Tm
2
3
477.434 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
270.398 T
VP min
50.833 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
270.397617 T
28.688 T
V/n
19.44
51.84
963.691286
Horizontal Force on Pile in Trans Dir HPT
ML.eL/eL2
MT.eT/eT2
Vp
963.691286
30.865 T
117.143103 T
Project
7.9
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
Superimposed Dead Load (SIDL)
106.128
Live Load (LL)
47.064
Walkway Live Load
3.916
Breaking and Tractive Force
-1.226
Raking Force
0.000
Load from Substructure
Dead Load of Pedestals
1.504
Dead Load of Dirt Wall
20.254
Dead Load of Dirt Wall Bracket
3.713
Dead Load of Return Wall
4.971
Dead Load of Screen Wall
2.854
Dead Load of Pile Cap
267.300
Weight of Soil Above Pile Cap
174.992
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
Dead Load Surcharge on Dirt wall
3.347
Live Load Surcharge on Dirt wall
2.237
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
Dead Load Surcharge on Return wall
0.696
Live Load Surcharge on Return wall
0.165
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
1.700
1.700
1.700
1.700
1.700
0.000
0.000
0.000
2.100
4.978
2.100
0.000
0.000
0.000
0.000
0.000
13.600
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
2.998
0.000
0.000
0.000
0.000
0.000
4.657
358.231
180.418
80.008
6.657
26.543
0.000
0.000
0.000
98.834
19.493
-2.575
13.962
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
-2.700
-2.700
-2.700
0.000
0.000
2.100
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
-1.080
-1.080
-1.080
5.200
5.200
5.200
0.000
0.000
0.000
0.000
0.000
0.000
4.773
3.181
0.754
2.518
2.878
2.044
44.024
28.501
19.045
0.000
-1.127
-0.751
-0.178
0.000
0.000
4.697
0.000
17.446
12.771
2.400
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
S.No
4.3.2
4.3.3
5.5.5
6.5.5
7.9.1
Descrioption
V (T)
0.000
0.000
-5.500
-5.500
File No.
Calc by
HB
Date
Sheet
0.000
0.000
49.918
10.800
239.840
237.629
144.654
158.254
0.000
0.000
19.813
2.624
37.203
4.482
126.366
115.974
76.785
79.783
0.820
0.473
0.000
0.000
138.123
18.682
999.520
1102.132
650.912
764.121
-2.977
-1.305
112.160
6.245
270.907
408.139
169.334
299.046
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
206.713601 92.5481293
0
299.26173
206.713601 92.5481293 18.8129764 318.074706
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
239.840423 T
1.8
126.366 T
999.519796 Tm
2
3
270.907 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
1240.282 T
eL
Vertical Load V
Horizontal Load Longitudinal HL
VP max
MGC
Checked by
SB
Date
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
3.494
0.463
80.902
2.740
1240.282
1280.074
918.665
968.419
Discipline
318.075 T
VP min
95.352 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
318.074706 T
39.973 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
1240.2816 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
21.061 T
Vp
1240.2816
132.978448 T
Project
7.9.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
eL
Calc by
HB
Date
Checked by
SB
Date
Sheet
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
213.345708 102.049248
0
315.394956
213.345708 102.049248 28.3429725 343.737929
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
237.629 T
1.8
115.974 T
1102.132 Tm
2
3
408.139 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
343.738 T
VP min
82.953 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
343.737929 T
V/n
19.44
51.84
1280.07425
Horizontal Force on Pile in Trans Dir HPT
39.605 T
ML.eL/eL2
MT.eT/eT2
Vp
1280.07425
MT.eT/eT2
Vp
19.329 T
139.639433 T
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
153.110914 60.2696266
0
213.38054
153.110914 60.2696266 11.7592866 225.139827
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
918.665 T
144.654 T
1.8
76.785 T
650.912 Tm
2
3
169.334 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
File No.
eL2
Pile Id
eT
1280.074 T
7.9.3
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
225.140 T
VP min
81.082 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
225.139827 T
24.109 T
V/n
19.44
51.84
918.665482
Horizontal Force on Pile in Trans Dir HPT
ML.eL/eL2
918.665482
12.798 T
104.600574 T
Project
7.9.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
161.403153 70.7519265
0
232.155079
161.403153 70.7519265 20.767105 252.922184
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
968.419 T
158.254 T
1.8
79.783 T
764.121 Tm
2
3
299.046 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
252.922 T
VP min
69.884 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
252.922184 T
26.376 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
968.418917 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
13.297 T
Vp
111.418331
968.418917
111.418331 T
Project
7.10
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
Superimposed Dead Load (SIDL)
106.128
Live Load (LL)
94.127
Walkway Live Load
7.832
Breaking and Tractive Force
-2.330
Raking Force
0.000
Load from Substructure
Dead Load of Pedestals
1.504
Dead Load of Dirt Wall
20.254
Dead Load of Dirt Wall Bracket
3.713
Dead Load of Return Wall
4.971
Dead Load of Screen Wall
2.854
Dead Load of Pile Cap
267.300
Weight of Soil Above Pile Cap
174.992
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
Dead Load Surcharge on Dirt wall
3.347
Live Load Surcharge on Dirt wall
2.237
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
Dead Load Surcharge on Return wall
0.696
Live Load Surcharge on Return wall
0.165
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
1.700
1.700
1.700
1.700
1.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
25.840
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
5.996
0.000
0.000
0.000
0.000
0.000
4.657
358.231
180.418
160.017
13.315
50.432
0.000
0.000
0.000
0.000
0.000
0.000
27.923
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
-2.700
-2.700
-2.700
0.000
0.000
2.100
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
-1.080
-1.080
-1.080
5.200
5.200
5.200
0.000
0.000
0.000
0.000
0.000
0.000
4.773
3.181
0.754
2.518
2.878
2.044
44.024
28.501
19.045
0.000
-1.127
-0.751
-0.178
0.000
0.000
4.697
0.000
17.446
12.771
2.400
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
S.No
4.3.2
4.3.3
5.5.6
6.5.6
7.10.1
Descrioption
V (T)
0.000
0.000
-5.500
-5.500
File No.
Calc by
HB
Date
Sheet
0.000
0.000
49.918
12.432
242.452
256.805
146.286
172.126
0.000
0.000
19.813
2.624
38.746
4.482
128.835
122.100
78.328
84.324
0.820
0.473
0.000
0.000
143.953
22.165
1014.421
1267.551
660.225
883.989
-2.977
-1.305
114.969
5.641
274.435
271.314
171.539
199.462
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
207.704857 93.9278629
0
301.63272
207.704857 93.9278629 19.0579645 320.690684
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
242.451714 T
1.8
128.835 T
1014.42092 Tm
2
3
274.435 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
1246.229 T
eL
Vertical Load V
Horizontal Load Longitudinal HL
VP max
MGC
Checked by
SB
Date
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
3.494
0.463
84.331
3.028
1246.229
1353.960
922.383
1022.012
Discipline
320.691 T
VP min
94.719 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
320.690684 T
40.409 T
V/n
19.44
51.84
1246.22914
Horizontal Force on Pile in Trans Dir HPT
ML.eL/eL2
MT.eT/eT2
Vp
1246.22914
21.473 T
132.834958 T
Project
7.10.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
eL
Calc by
HB
Date
Checked by
SB
Date
Sheet
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
225.659974 117.365843
0
343.025817
225.659974 117.365843 18.8412436 361.867061
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
256.805 T
1.8
122.100 T
1267.551 Tm
2
3
271.314 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
361.867 T
VP min
89.453 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
361.867061 T
V/n
19.44
51.84
1353.95985
Horizontal Force on Pile in Trans Dir HPT
42.801 T
ML.eL/eL2
MT.eT/eT2
Vp
1353.95985
MT.eT/eT2
Vp
20.350 T
127.135375 T
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
153.730449 61.1319601
0
214.862409
153.730449 61.1319601 11.9124041 226.774813
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
922.383 T
146.286 T
1.8
78.328 T
660.225 Tm
2
3
171.539 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
VP max
File No.
eL2
Pile Id
eT
1353.960 T
7.10.3
MGC
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
226.775 T
VP min
80.686 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
226.774813 T
24.381 T
V/n
ML.eL/eL2
19.44
51.84
922.382693 -1.421E-014
0
Horizontal Force on Pile in Trans Dir HPT
13.055 T
922.382693
104.510893 T
Project
7.10.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Vertical Load V
Horizontal Load Longitudinal HL
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
1022.012 T
eL
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
172.126 T
1.8
-3.6
3.24
12.96
84.324 T
883.989 Tm
2
3
1.8
1.8
0
3.6
3.24
3.24
0
12.96
170.335367 81.8507904
0
252.186158
170.335367 81.8507904 13.8515272 266.037685
199.462 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
VP max
Discipline
266.038 T
VP min
74.633 T
For Pile cap Design
Max Vp Front Row
Total
Hor Load On Pile in Long Dir HPL
266.037685 T
28.688 T
19.44
51.84
1022.0122 2.8422E-014
0
Horizontal Force on Pile in Trans Dir HPT
14.054 T
1022.0122
102.336104 T
Project
7.11
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Description
Long Seismic Case One - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Long Seismic Case Two - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Trans Seismic Case One - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Trans Seismic Case Two - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Vert Seismic Case One - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Vert Seismic Case Two - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
VP max
VP min
HPL
HPT
Hp
337.346
358.794
45.381
43.914
77.753
69.120
21.473
19.650
80.664
71.859
340.504
377.346
43.284
49.269
77.753
71.976
21.473
20.350
80.664
74.798
326.440
350.273
57.163
53.118
39.973
39.605
46.998
39.592
61.698
56.001
327.667
367.317
56.639
59.703
40.409
42.801
48.370
41.364
63.028
59.522
318.075
343.738
95.352
82.953
39.973
39.605
21.061
19.329
45.182
44.070
320.691
361.867
94.719
89.453
40.409
42.801
21.473
20.350
45.759
47.392
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Description
Long Seismic Case One - Track Loaded Condiition
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
Long Seismic Case Two - Track Loaded Condiition
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
Trans Seismic Case One - Track Loaded Condiition
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
Trans Seismic Case Two - Track Loaded Condiition
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
Vert Seismic Case One - Track Loaded Condiition
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
Vert Seismic Case Two - Track Loaded Condiition
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
VP max
For Seismic Case with LWR (Max and min of SLS-2c and SLS-2d)
Max Vertical Load in Pile
278.421 T
MIN Vertical Load in Pile
38.652 T
VP min
HPL
HPT
Hp
245.477
264.967
58.142
38.652
47.722
49.988
13.055
13.554
49.475
51.793
239.158
278.421
48.539
42.486
47.722
52.028
13.055
14.054
49.475
53.893
230.368
258.150
57.214
46.016
24.109
26.376
29.008
29.508
37.719
39.578
231.135
270.398
56.886
50.833
24.381
28.688
29.866
30.865
38.554
42.138
225.140
252.922
81.082
69.884
24.109
26.376
12.798
13.297
27.295
29.538
226.775
266.038
80.686
74.633
24.381
28.688
13.055
14.054
27.656
31.945
<
>
355 T
0 T
OK
OK (NO TENSION)
The Pile need not be checked for Horizontal capacity in seismic case
However The Piles will be designed for Moment Due to these Forces due to resultant
PILE GROUP LSL Page 111 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
8.0
DESIGN OF PILE
8.1
Data
Dia Of Pile
Length Of Pile
Free Length L1
Length of Fixity
Moment Reduction Factor
8.2
1.2
25
0
10.9
0.83
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
m
m
m
m
Grade Of Concrete
Fck
Modulus of Elasticity
M35
35 Mpa
29500
Reinforcement Grade
fy
Fe-500
500 Mpa
20 mm
0.02 m
8.2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
From Bore Log Data
Minimum Undrained Shear strength
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
2.3 t/m^2
0.023 N/mm^2
dcon = 0.85 Lo
dcon
Lo
3.6 m
4.2352941176 m
=dcon/0.85
Lo
As per Table 18 Case 6 of IRS Concrete Bridge Code the Effective length of column is
Le
h
Le/h
=1.5Lo
6.3529411765 m
1.2 m
5.2941176471
Design as Short Column
8.4
Design Forces and Moment For Ultimate and Servicibility Limit state
8.4.1
Case no
7.2.1
7.2.2
7.2.3
7.2.4
7.3.1
7.3.2
7.3.3
7.3.4
7.5.1
7.5.2
7.6.1
7.6.2
Description
ULS-1 Horizontal and Vertical Loads in Pile
ULS-2a Horizontal and Vertical Loads in Pile
ULS-2b Horizontal and Vertical Loads in Pile
ULS-3 Horizontal and Vertical Loads in Pile
ULS-1 Horizontal and Vertical Loads in Pile
ULS-2a Horizontal and Vertical Loads in Pile
ULS-2b Horizontal and Vertical Loads in Pile
ULS-3 Horizontal and Vertical Loads in Pile
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
VP max
355.31054241
268.11032468
343.20514043
343.83823235
398.61162196
271.68484663
378.84163195
379.08604546
337.34598496
358.79361494
340.50378479
377.34604582
VP min
HPL
70.900510302
100.5542651
71.537948306
69.673012968
86.402921254
98.093690373
83.208367226
81.852015287
45.381374269
43.913549648
43.283885027
49.269181326
31.715327
24.277593
30.515848
37.62366
42.449291
28.367157
40.208999
46.929624
77.753362
69.120458
77.753362
71.976458
HPT
11.6939176
14.0022906
14.5138434
11.3441509
13.4427509
14.0022906
15.9129101
12.7432176
21.4725404
19.6504427
21.4725404
20.3499761
Hp
33.803
28.026
33.792
39.297
44.527
31.635
43.243
48.629
80.664
71.859
80.664
74.798
PILE LSD Page 114 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
7.7.1
7.7.2
Case no
7.8.1
7.8.2
7.9.1
7.9.2
7.10.1
7.10.2
Description
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Maximum
Minimum
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
326.43995104 57.163083764 39.973404 46.9981644
61.698
350.27327594 53.118010191 39.604866 39.5923364
56.001
VP max
VP min
HPL
HPT
Hp
327.66657626
367.31697666
318.07470645
343.7379286
320.69068418
361.86706096
398.61162196
56.638648402
59.702590213
95.352495069
82.953487773
94.719029456
89.452887912
40.408619
42.800878
39.973404
39.604866
40.408619
42.800878
48.3699383
41.3635681
21.0610083
19.3289332
21.4725404
20.3499761
43.283885027
Sheet
63.028
59.522
45.182
44.070
45.759
47.392
80.664
28.026
Description Case no
7.3.1
7.2.2
7.6.1
7.5.1
Vertical
Force Vp
398.61162196
268.11032468
43.283885027
45.381374269
Horizontal
Force Hp
DC ULS-1
DC ULS-2
DC ULS-3
DC ULS-4
Max Vp
Min Hp
Min Vp
Max Hp
8.4.2
Case no
7.2.5
7.2.6
7.2.7
7.2.8
7.3.5
7.3.6
7.3.7
7.3.8
Description
SLS-1 Horizontal and Vertical Loads in Pile
SLS-2a Horizontal and Vertical Loads in Pile
SLS-2b Horizontal and Vertical Loads in Pile
SLS-3 Horizontal and Vertical Loads in Pile
SLS-1 Horizontal and Vertical Loads in Pile
SLS-2a Horizontal and Vertical Loads in Pile
SLS-2b Horizontal and Vertical Loads in Pile
SLS-3 Horizontal and Vertical Loads in Pile
Moment M =
m.Hp.(L1+Lf)/2
Moment Due to
min eccn Me =
Vp* Min e
Moment
Initial Mi =
M+Me
VP max
249.0545654
193.91208826
249.4768033
248.98983866
276.13861115
196.03303898
274.55878246
273.7608751
VP min
HPL
65.511330225
84.333106892
61.937348498
61.619071519
75.48754164
82.861776657
70.755706661
70.8442964
18.976075
14.299158
18.832491
23.519408
25.578171
16.723004
25.336338
29.713504
0
0
0
0
HPT
6.94931622
8.38580355
9.38513689
6.84938288
8.04858288
8.38580355
10.3844702
7.84871622
Design
Moment
Mi+Madd
209.389919
132.138544
365.748563
365.790512
Hp
20.209
16.577
21.041
24.496
26.815
18.708
27.382
30.733
PILE LSD Page 115 of 365
Project
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
47.721513 13.0547097 49.4749255
49.98818 13.5543763 51.7932354
47.721513 13.0547097 49.4749255
HPL
HPT
Hp
52.02818 14.054043 53.8929273
24.109039 29.0082247 37.7189989
26.375706 29.5078913 39.5776897
24.381049 29.8655833 38.5537107
28.687716 30.8649166 42.1382024
24.109039 12.7975021 27.2950882
26.375706 13.2971687 29.5379852
24.381049 13.0547097 27.6561203
28.687716 14.054043 31.9452836
53.893
16.577
Date
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
7.5.3
7.5.4
7.6.3
Case no
7.6.4
7.7.3
7.7.4
7.8.3
7.8.4
7.9.3
7.9.4
7.10.3
7.10.4
Description
SLS-2d Horizontal and Vertical Loads in Pile
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
SLS-2c Horizontal and Vertical Loads in Pile
SLS-2d Horizontal and Vertical Loads in Pile
Maximum
Minimum
245.47661509
264.96673345
239.15800083
VP max
58.142289284
38.652170925
48.539119345
VP min
278.42087257
230.36810474
258.15046226
231.1347455
270.39761724
225.13982686
252.92218438
226.77481295
266.03768469
278.42087257
42.486084347
57.213618556
46.015739359
56.885846455
50.832811457
81.082000622
69.884121425
80.686084614
74.633049616
38.652170925
Sheet
Following Four DesignCases arise for Serviceability Limit state Stress check
Design
Case
DC-SLS-SC-1
DC-SLS-SC-2
DC-SLS-SC-3
DC-SLS-SC-4
Description Case no
Max Vp
Min Hp
Min Vp
Max Hp
7.6.4
7.2.6
7.5.4
7.6.4
Vertical
Force Vp
278.42087257
193.91208826
38.652170925
42.486084347
Horizontal
Force Hp
Moment M =
m.Hp.(L1+Lf)/2
Moment Due to
min eccn Me =
Vp* Min e
Moment
Initial Mi =
M+Me
0
0
0
0
Design
Moment
Mi+Madd
249.353074
78.8630307
235.059744
244.634378
As per Clause 12.1 of DBR crackwidth check has to be done in SLS combination 1 only
Following Two Cases arise for Serviceability Limit state Crack width Check
Design
Case
DC-SLS-CW-1
DC-SLS-CW-2
Description Case no
One Track
Two Track
7.2.5
7.3.5
Vertical
Force Vp
65.511
75.488
Horizontal
Force Hp
Moment M =
m.Hp.(L1+Lf)/2
Moment Due to
min eccn Me =
Vp* Min e
Moment
Initial Mi =
M+Me
0
0
Design
Moment
Mi+Madd
92.723
122.806
Project
8.5
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
1.131 m2
398.612 T
500 Mpa
1% of CS area
0.15P/fy
Min Ast Req. as per IRS
11310 mm^2
1196 mm^2
1196 mm^2
As Per IS 2911 (Part 1/Sec 2) : 2010 Clause 6.11.1 minimum area of reinf Required is 0.4% of CS area
Min Ast Req. as per IS
4524 mm^2
min Renforcement required is max from the above req
Min Ast req
4523.893 mm^2
Provide
17
nos
32
dia Reinforcement.
Provide
16
nos
32
dia Reinforcement.
Ast
26540 mm^2
> min. rein, Hense OK
8.6
8.6.1
994
497
3122.7431
49
63.729451
DC ULS-1
398.612 T
PILE LSD Page 117 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Mu
D
area of Cs
Max Dia of main reinforcement
Hoop Reinf Dia
Clear Cover
d'
fy
fck
d'/D
209.390
1.2
1130973
32
12
75
103
500
35
0.09
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
T-m
m
mm^2
mm
mm
mm
Mpa
Mpa
0.08
0.03
From chart
p/fck
p
Ast Req
Ast Prov
8.6.2
0.007
0.245 %
2771 mm^2
26540 mm^2
> Ast req, Hense OK
268.110
132.139
1.2
1130973
32
12
75
T
T-m
m
mm^2
mm
mm
mm
PILE LSD Page 118 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
d'
fy
fck
d'/D
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
103
500 Mpa
35 Mpa
0.09
0.05
0.02
From chart
p/fck
p
Ast Req
Ast Prov
8.6.3
0
0 %
0 mm^2
26540 mm^2
> Ast req, Hense OK
43.284
365.749
1.2
1130973
32
12
75
103
500
35
0.09
T
T-m
m
mm^2
mm
mm
mm
Mpa
Mpa
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Pu/fckD^2
Mu/fckD63
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
0.01
0.06
From chart
p/fck
p
Ast Req
Ast Prov
8.6.4
0.055
1.925 %
21771 mm^2
26540 mm^2
> Ast req, Hense OK
45.381
365.791
1.2
1130973
32
12
75
103
500
35
0.09
T
T-m
m
mm^2
mm
mm
mm
mm
Mpa
Mpa
0.01
0.06
From chart
p/fck
p
0.055
1.925 %
PILE LSD Page 120 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Ast Req
Ast Prov
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
21771 mm^2
26540 mm^2
> Ast req, Hense OK
Project
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
8.7
8.7.1
DC-SLS-SC-1
Dia. of section
Radius of section
fck
fy
f permis.concrete
=
=
=
=
f tensile permis.steel
Ec
Creep Coeff q for 1 year
Ec eff (effective E mod for Conc)
Es
Modular ratio
Vertical Load
=
Bending Moment
=
Effective Cover
=
Ast.provided
=
N.A.assumed
=
Ar
C
c.g.
Ixx
Aeff.
e
e'
e - e'
Ieff
Dist. Of N.A.
Stress in Con. =
=
=
=
=
=
=
=
=
=
=
=
Stress in R/f. =
Compressive stress in concrete
35 Mpa
500 Mpa
=0.5 fck
=0.75 fy
IS:456 Cl 6.2.5.1
Ec eff=Ec/(1+q)
=ES/Ec eff
278.42 T
249.35 tm
10.30 cm
cm2
cm
deg
cm2
cm
cm
cm4
8523.34 cm2
89.56
16.69
72.87
7047486
11.35
157 kg/cm2
-2256 kg/cm2
157 kg/cm2
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
120
60
350
5000
175
cm
cm
kg/cm2
kg/cm3
kg/cm2
3750 kg/cm3
29500 Mpa
1.1
14048 Mpa
200000 Mpa
14.23728814
265.40
54.66
169.71
5010.14
119.52
28.40
1043386
0
2.96 rad
5.34 5.34
<
175 kg/cm3
OK
PILE LSD Page 122 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Tensile stress in steel
2256 kg/cm3
<
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
3750 kg/cm4
Sheet
OK
Project
Calculations
for
8.7.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
For Design Case
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
DC-SLS-SC-2
Dia. of section
=
Radius of section
=
fck
=
fy
=
f permis.concrete
f tensile permis.steel
Ec
Creep Coeff q for 1 year
Ec eff (effective E mod for Conc)
Es
Modular ratio
Vertical Load
=
Bending Moment
=
Effective Cover
=
Ast.provided
=
N.A.assumed
=
Discipline
=
=
=
=
=
=
=
=
=
=
=
Ar
C
c.g.
Ixx
Aeff.
e
e'
e - e'
Ieff
Dist. Of N.A.
Stress in Con. =
Stress in R/f. =
Compressive stress in concrete
Tensile stress in steel
35 Mpa
500 Mpa
=0.5 fck
=0.75 fy
IS:456 Cl 6.2.5.1
Ec eff=Ec/(1+q)
=ES/Ec eff
193.91 T
78.86 tm
10.30 cm
265.40
73.47
205.86
7252.56
116.96
18.38
2734013
10765.76
40.67
12.38
28.29
7872720
25.85
51
-359
51
359
120
60
350
5000
175
3750
29500
1.1
14048
200000
14.23728814
cm2
cm
deg
cm2
cm
cm
cm4
cm2
cm
cm
kg/cm2
kg/cm3
kg/cm2
kg/cm3
Mpa
Mpa
Mpa
0
3.59 rad
-13.47 -13.47
kg/cm2
kg/cm2
kg/cm2
kg/cm3
<
<
175 kg/cm3
3750 kg/cm4
OK
OK
PILE LSD Page 124 of 365
Project
Calculations
for
8.7.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
For Design Case
DC-SLS-SC-3
Dia. of section
Radius of section
fck
fy
f permis.concrete
=
=
=
=
f tensile permis.steel
Ec
Creep Coeff q for 1 year
Ec eff (effective E mod for Conc)
Es
Modular ratio
Vertical Load
=
Bending Moment
=
Effective Cover
=
Ast.provided
=
N.A.assumed
=
=
=
=
=
=
=
=
=
=
=
=
Ar
C
c.g.
Ixx
Aeff.
e
e'
e - e'
Ieff
Dist. Of N.A.
Stress in Con. =
Stress in R/f. =
Compressive stress in concrete
35 Mpa
500 Mpa
=0.5 fck
=0.75 fy
IS:456 Cl 6.2.5.1
Ec eff=Ec/(1+q)
=ES/Ec eff
38.65 T
235.06 tm
10.30 cm
265.40
43.90
148.80
3742.40
115.58
34.38
501345
7255.60
608.14
17.73
590.41
6982304
1.63
143
-3062
143
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
120
60
350
5000
175
cm
cm
kg/cm2
kg/cm3
kg/cm2
3750 kg/cm3
29500 Mpa
1.1
14048 Mpa
200000 Mpa
14.23728814
cm2
cm
deg
cm2
cm
cm
cm4
cm2
0
2.60 rad
16.10 16.10
kg/cm2
kg/cm2
kg/cm2
<
175 kg/cm3
OK
PILE LSD Page 125 of 365
Project
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Tensile stress in steel
8.7.3
Ar
C
c.g.
Ixx
Aeff.
e
e'
e - e'
Ieff
Dist. Of N.A.
Stress in Con. =
MGC
File No.
Calc by
HB
Date
Checked by
OK
SB
Date
Sheet
3750 kg/cm4
DC-SLS-SC-4
Dia. of section
=
Radius of section
=
fck
=
fy
=
f permis.concrete
f tensile permis.steel
Ec
Creep Coeff q for 1 year
Ec eff (effective E mod for Conc)
Es
Modular ratio
Vertical Load
=
Bending Moment
=
Effective Cover
=
Ast.provided
=
N.A.assumed
=
<
3062 kg/cm3
Discipline
=
=
=
=
=
=
=
=
=
=
=
35 Mpa
500 Mpa
=0.5 fck
=0.75 fy
IS:456 Cl 6.2.5.1
Ec eff=Ec/(1+q)
=ES/Ec eff
42.49 T
244.63 tm
10.30 cm
265.40
43.99
148.99
3753.30
115.63
34.33
504983
120
60
350
5000
175
3750
29500
1.1
14048
200000
14.23728814
cm2
cm
deg
cm2
cm
cm
cm4
7266.50 cm2
575.80
17.73
558.07
6982334
1.72
16.01 16.01
149 kg/cm2
cm
cm
kg/cm2
kg/cm3
kg/cm2
kg/cm3
Mpa
Mpa
Mpa
0
2.60 rad
Project
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Stress in R/f. =
Compressive stress in concrete
-3177 kg/cm2
149 kg/cm2
3177 kg/cm3
8.8
8.8.1
<
<
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
175 kg/cm3
3750 kg/cm4
Sheet
OK
OK
=
=
=
=
f permis.concrete
f tensile permis.steel
Ec
Creep Coeff q for 1 year
Ec eff (effective E mod for Conc)
Es
Modular ratio
Vertical Load
=
Bending Moment
=
Effective Cover
=
Ast.provided
=
N.A.assumed
=
Ar
C
c.g.
Ixx
Aeff.
e
=
=
=
=
=
=
=
35 Mpa
500 Mpa
=0.5 fck
=0.75 fy
IS:456 Cl 6.2.5.1
Ec eff=Ec/(1+q)
=ES/Ec eff
65.51 T
92.72 tm
10.30 cm
265.40
49.75
160.27
4427.30
118.23
31.10
763136
7940.50
141.54
cm2
cm
deg
cm2
cm
cm
cm4
120
60
350
5000
cm
cm
kg/cm2
kg/cm3
175 kg/cm2
3750 kg/cm3
29500 Mpa
1.1
14048 Mpa
200000 Mpa
14.23728814
0
2.80 rad
cm2
Project
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
e'
=
e - e'
=
Ieff
=
Dist. Of N.A.
=
Stress in Con. =
Stress in R/f. =
Compressive stress in concrete
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
17.34
124.20
6997145
7.10
10.25 10.25
58 kg/cm2
-992 kg/cm2
58 kg/cm2
992 kg/cm3
75
12
32
103
33
94.629
1200
1097
99.242
200000.000
fs/ES
deprh of NA
Strain in extreem fibre ignoring tension stiffining
=(h-x)/(d-x)*s
mm
mm
mm
mm
mm
mm
N/mm^2
N/mm^3
0.0004962121
497.530 mm
0.0005814705
1200 mm
672.28267864 mm
83.936447188
35.100297294
90.979987012
15.163331169
68.591328541
24.13
T
T
T
T
Tm
Tm
PILE LSD Page 128 of 365
Project
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
The strain at level being considered after allowing the tension stiffening effects is given by eqn 25 of IRS Concrete Bridge code
dc
=x
497.530 mm
As
11815 mm^2
m
0.000581188
SECTION CRACKED>>CRACK WIDTH CALCULATION FOLLOWS
Calculation of crack width
acr distance of point considered to the surfaco of nearest bar
Design Crack width =
8.8.1
97.347439219 mm
0.1595782956 mm
DC-SLS-CW-2
Ar
C
c.g.
=
=
=
=
35 Mpa
500 Mpa
=0.5 fck
=0.75 fy
IS:456 Cl 6.2.5.1
Ec eff=Ec/(1+q)
=ES/Ec eff
75.49 T
122.81 tm
10.30 cm
265.40
48.71
158.25
4304.58
117.84
31.68
cm2
cm
deg
cm2
cm
cm
120
60
350
5000
175
3750
29500
1.1
14048
200000
14.23728814
cm
cm
kg/cm2
kg/cm3
kg/cm2
kg/cm3
Mpa
Mpa
Mpa
0
2.76 rad
Project
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Ixx
=
Aeff.
=
e
=
e'
=
e - e'
=
Ieff
=
Dist. Of N.A.
=
Stress in Con. =
Stress in R/f. =
Compressive stress in concrete
711094
7817.78
162.68
17.44
145.24
6991799
6.16
76
-1362
76
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
cm4
cm2
11.29 11.29
kg/cm2
kg/cm2
kg/cm2
1362 kg/cm3
75
12
32
103
33
94.629
1200
1097
136.155
200000.000
fs/ES
mm
mm
mm
mm
mm
mm
N/mm^2
N/mm^3
deprh of NA
0.0006807741
487.129 mm
0.0007957488
1200 mm
672.28267864 mm
96.621025767 T
35.100297294 T
102.79909285 T
PILE LSD Page 130 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Hor Force per pile due to permanent load
Mg
Moment at section due to PL
Mq
Moment at section due to LL
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
17.133182141 T
77.501949417 Tm
45.30 Tm
The strain at level being considered after allowing the tension stiffening effects is given by eqn 25 of IRS Concrete Bridge code
dc
=x
487.129 mm
As
11667 mm^2
m
0.000795615
SECTION CRACKED>>CRACK WIDTH CALCULATION FOLLOWS
Calculation of crack width
acr distance of point considered to the surfaco of nearest bar
Design Crack width =
97.347439219 mm
0.2186449174 mm
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
9.0
9.1
9.1.1
Description
VP max (front)
MGC
File No.
HB
Date
SB
Date
Sheet
VP max (rear)
7.2
Normal Case One - Track Loaded Condiition ie transverse maximum moment case
7.2.1
7.2.2
7.2.3
7.2.4
7.3
Normal Case Two- Track Loaded Condiition ie Longitudinal maximum moment case
7.3.1
7.3.2
7.3.3
7.3.4
7.5
7.5.1
7.5.2
7.6
7.6.1
7.6.2
7.7
7.7.1
7.7.2
7.8
7.8.1
355.311
268.110
343.205
343.838
143.915
128.461
145.446
130.618
398.612
271.685
378.842
379.086
110.181
125.025
117.340
102.916
337.346
358.794
82.023
99.831
340.504
377.346
81.223
86.813
326.440
350.273
150.249
153.132
327.667
156.526
Project
9.1.2
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
7.8.2
Case no
7.9
7.9.1
7.9.2
7.10
7.10.1
7.10.2
Description
Vert Seismic Case One - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Vert Seismic Case Two - Track Loaded Condiition
ULS-2c Horizontal and Vertical Loads in Pile
ULS-2d Horizontal and Vertical Loads in Pile
Maximum
MGC
File No.
HB
Date
SB
Date
Sheet
367.317
145.644
VP max (front)
VP max (rear)
318.075
343.738
132.978
139.639
320.691
361.867
398.612
132.835
127.135
156.526
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Distance of the critical section from the face of the pier(deff distance)
Distance of the critical section from the rear Row of Pile
Total Reaction
Shear Due to self wt of Pile acting against Reaction
Load Factor For Self weight
Factored SW shear
Net ULS Shear
Net ULS Shear per m width
9.1.3
Discipline
1.693
1.408
469.578
114.221
1.250
142.777
326.802
29.709
MGC
File No.
HB
Date
SB
Date
Sheet
m
m
T
T
T
T
T/m
Mu
b
D
fck
fy
Clear Cover
Max Dia of Main bars
Dia of Distribution Bars
From Equation 2 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997
the effective depth d required is given as
d=
Required Effective Depth
Effective Deprh Provided
873.358 KN/m
1.000 m
1.800 m
35.000
35000.000
500.000
75.000
25.000
20.000
N/mm^2
KN/m^2
N/mm^2
mm
mm
mm
Mu
0 . 15. f ck b
dreq
0.408 m
dprov
1.693 m
#NAME?
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
Assume As requored
1199.605 mm^2
From Equation 5 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 the lever arm z is given as
z= 1
1.1f y As
d> 0. 95 d
f ck bd
z
1673.649 mm
From Equation 1 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 Area of steel reqired is given by
A s=
As calculated
Diff From assumed
Provide
Rein.provided
Mu
0 . 87 f y z
1200 mm^2
0.000 Goal seek this to zero
@
@
=
200
c/c
200
c/c
4025 mm2/m
Placed Alternatively
>
1200 o.k.
4025 mm2/m
1000.000 mm
1692.500 mm
3385.000 mm^2
>
3385 o.k.
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
Secondary Reinforcement
As per Clause 15.9.4.2 the minmum reinf shall be 0.12 % b*d
b
d
Min Ast req
Provide
Provide Ast
9.1.4
1000.000 mm
1692.500 mm
1015.500 mm^2
@
125
c/c
2513.274 mm2/m
>
1015.500 o.k.
297.093
1000.000
1692.500
4025
KN/m
mm
mm
mm^2
0.737
35.000 N/mm^2
{ }{
0 .27 100 A s
vc =
m
bw d
f ck }
Project
Calculations
for
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
1
1
Checked by
0 .27 100 A s 3 Pile 3Cap)
vc =
f
{
ck }
m
bw d
{ }
vc
0.438 N/mm^2
svc
0.323 N/mm^2
9.2
9.2.1
Description
0.176 N/mm^2
<
0.323
VP max (front)
MGC
File No.
HB
Date
SB
Date
Sheet
VP max (rear)
7.2
Normal Case One - Track Loaded Condiition ie transverse maximum moment case
7.2.5
7.2.6
7.2.7
7.2.8
7.3
Normal Case Two- Track Loaded Condiition ie Longitudinal maximum moment case
7.3.5
7.3.6
7.3.7
7.3.8
7.5
7.5.3
7.5.4
249.055
193.912
249.477
248.990
111.678
101.777
115.412
104.724
276.139
196.033
274.559
273.761
90.441
99.737
95.388
85.022
245.477
264.967
81.046
79.571
Project
9.2.2
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
7.6
7.6.3
7.6.4
7.7
7.7.3
Case no
7.7.4
Description
SLS-2d Horizontal and Vertical Loads in Pile
7.8
7.8.3
7.8.4
7.9
7.9.3
7.9.4
7.10
7.10.3
7.10.4
239.158
278.421
MGC
File No.
HB
Date
SB
Date
Sheet
72.253
70.079
230.368
115.395
VP max (front)
VP max (rear)
258.150
122.213
231.135
270.398
119.318
117.143
225.140
252.922
104.601
111.418
226.775
266.038
278.421
104.511
102.336
122.213
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Unit weight
Moment Due to Self weight acting agains pile reaction
Load Factor For SW
Factored SW moment
Net SLS Moment
Net SLS Moment per m width
9.2.3
Discipline
2.500
396.000
1.000
396.000
740.578
67.325
MGC
File No.
HB
Date
SB
Date
Sheet
T/m
T-m
T-m
Tm
Tm
Tm/m
Ms =
P =
s =
f1 =
673.253
0.000
100.000
kNm/m
kN
mm
25.000
mm
fs =
f2 =
0.000
mm
0.000
mm
nc =
Lbar
75.000
mm
20.000
1000.000
1800.000
mm
mm
mm
1000.000
mm
b =
h =
bt =
fck,28 =
fy =
fc perm =
fs perm =
Ec,28 =
35.000
N/mm2
500.000
17.500
375.000
N/mm2
N/mm2
N/mm2
29500.000
N/mm2
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Es = 200000.000
As = 4025.166
p =
0.0024
IS 456 : CL : 6.2.5.1
E eff= Ec / (1+q)
9.3.1
9.3.2
Description
Date
SB
Date
Sheet
N/mm2
mm2
mm
Eeff =
m =
m*p =
k = x/d =
x =
z =
fs =
14047.619
8.000
0.019
0.177
299.519
1592.660
N/mm2
mm
mm
105.020
N/mm2
<
375.000 N/mm2
OK
2.823
N/mm
<
17.500
OK
N/mm
VP max (rear)
7.2
Normal Case One - Track Loaded Condiition ie transverse maximum moment case
7.2.5
7.3
Normal Case Two- Track Loaded Condiition ie Longitudinal maximum moment case
7.3.5
249.055
276.139
276.139
HB
1692.500
1.100
fcb =
VP max (front)
File No.
d =
q =
MGC
111.678
90.441
111.678
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Critical section For moment is face of pedestal
Maximum Reaction For Front Row of Pile
Total Reaction For 3 piles
Distance of Reart Row of Pile from Pier Face
SLS Moment at Pier Face Due to this
Width of Pile Cap
Height
Unit weight
Moment Due to Self weight acting agains pile reaction
Load Factor For SW
Factored SW moment
Net SLS Moment
Net SLS Moment per m width
9.3.3
Discipline
111.67769
335.033069
3.1
1038.60251
11
1.8
2.5
396.000
1
396
642.603
58.4184103
MGC
File No.
HB
Date
SB
Date
Sheet
T
T
m
T-m
m
m
T/m
T-m
T-m
Tm
Tm
Tm/m
d
m
m
m
ec=(fs/Ec)
h
s
Cmin
fs/Es
acr
e1
Strain Diagram
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Serviciability State Moment,
Serviciability State Axial Force
C/C bar Spacing of Tension Reinforcement
Diameter of Tension Reinforcement Bars 1st Layer
Diameter of Spacer Bar
Diameter of Tension Reinforcement Bars 2 Layer
nd
IS 456 : CL : 6.2.5.1
E eff= Ec / (1+q)
m = 280/fck
MGC
File No.
HB
Date
SB
Date
Ms =
P =
s =
f1 =
584.184
0.000
100.000
kNm/m
kN
mm
25.000
mm
fs =
f2 =
0.000
mm
0.000
mm
nc =
Lbar
75.000
mm
20.000
1000.000
1800.000
1800.000
mm
mm
mm
mm
75.000
mm
1000.000
mm
b =
h =
a =
cmin =
bt =
fck,28 =
fy =
35.000
N/mm2
500.000
N/mm2
Ec,28 = 29500.000
Es = 200000.000
As = 4025.166
Sheet
N/mm2
N/mm2
mm2
p =
0.0024
d =
q =
1692.500
1.100
mm
Eeff =
m =
m*p =
14047.619
8.000
0.019
N/mm2
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Ratio of Neutral axis depth to Eff. Depth
x/d=[pm+2(mp)]-m*p
Depth to neutral axis
x=k*d
Lever arm
z = d-x/3
Stress in tension steel
f s=[Ms / (As*z)] should be < 0.8*fy
k = x/d
x
z
fs
MGC
File No.
HB
Date
SB
Date
=
=
=
0.177
299.519
1592.660
91.126
N/mm2
fcb =
2.449
N/mm2
e1 =
0.0004908
e2 =
0.0000000
e'1 =
0.0004908
max' crack width occurs midway between the bars on tension face
acr =
88.278
Sheet
mm
mm
mm
OK
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
Project
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
Date
SB
Date
Sheet
Sin ( + ) . Sin ( + )
Cos .Cos ( ) 1
Cos ( ) . Cos ( )
2
Ka
=
=
rad
rad
rad
rad
F
Cos2 ( + )
Kp=
10.3
HB
10.2
File No.
2.6
10.1
MGC
1.6m
4.143
2 T/m3
21.545
308.096
0.867
303.415
53.500
T/m^2
T
m
T
T
Project
MGC
File No.
HB
Date
SB
Date
Sheet
Case No
Description
7.2
Normal Case One - Track Loaded Condiition ie transverse maximum moment case
SLS-1
SLS-2a
SLS-2b
SLS-3
7.3
113.856447
85.7949472
112.994947
141.116447
Normal Case Two- Track Loaded Condiition ie Longitudinal maximum moment case
SLS-1
SLS-2a
SLS-2b
SLS-3
153.469026
100.338026
152.018026
178.281026
178.281026
Maximum
Horizontal Force
Resisting Force
Factor of safety against slifing
10.4
10.4.1
178.281025767 T
303.415 T
1.70 >1.5
303.415
1.733
525.919
1.7
894.063117256
11.000
81.278
Hense Ok
T
m
T-m
m
T-m
m
Tm/m
Project
MGC
File No.
HB
Date
SB
Date
Sheet
Project
MGC
File No.
HB
Date
SB
Date
Sheet
Mu
b
D
fck
fy
Clear Cover
Max Dia of Main bars
Dia of Distribution Bars
From Equation 2 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997
the effective depth d required is given as
d=
Required Effective Depth
812.785 KN/m
1.000 m
1.600 m
35.000
35000.000
500.000
75.000
20.000
12.000
N/mm^2
KN/m^2
N/mm^2
mm
mm
mm
Mu
0 . 15. f ck b
dreq
0.393 m
dprov
1.503 m
#NAME?
Assume As requored
1259.753 mm^2
From Equation 5 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 the lever arm z is given as
z= 1
z
1.1f y As
d> 0. 95 d
f ck bd
1483.204 mm
Project
A s=
As calculated
Diff From assumed
Provide
Rein.provided
MGC
File No.
HB
Date
SB
Date
Sheet
Mu
0 . 87 f y z
1260 mm^2
0.000 Goal seek this to zero
@
@
=
200
c/c
200
c/c
3142 mm2/m
Placed Alternatively
>
1260 o.k.
3142 mm2/m
1000.000 mm
1503.000 mm
3006.000 mm^2
>
3006 o.k.
Secondary Reinforcement
As per Clause 15.9.4.2 the minmum reinf shall be 0.12 % b*d
b
d
Min Ast req
Provide
Provide Ast
1000.000 mm
1503.000 mm
901.800 mm^2
@
100
c/c
1131 mm2/m
>
901.800 o.k.
Project
468.914
1000.000
1503.000
3142
MGC
File No.
HB
Date
SB
Date
Sheet
KN/m
mm
mm
mm^2
0.759
35.000 N/mm^2
vc=
{ }
0 .27 100 A s
m
bw d
{ f ck }
vc
0.419 N/mm^2
svc
0.318 N/mm^2
10.5
10.5.1
0.312 N/mm^2
<
0.318
303.415
1.733
525.919
1
525.919480739
11.000
47.811
T
T
m
T-m
m
m
T/m
Shear Key Design LSD Page 150 of 365
Project
IS 456 : CL : 6.2.5.1
E eff= Ec / (1+q)
fs = ###
f2 = ###
nc = ###
Lbar
12.000
b =
h =
bt =
fck,28 =
fy =
Date
Sheet
Date
mm
mm
1000.000
1600.000
mm
mm
mm
mm
1000.000
mm
35.000
N/mm2
500.000
N/mm2
fc perm =
17.500
fs perm = 375.000
Ec,28 = ###
Es = ###
N/mm2
N/mm2
N/mm2
N/mm2
As =
p =
3141.593
0.0021
mm2
d =
q =
1503.000
1.100
mm
Eeff = 14047.619
m =
8.000
m*p =
0.017
k = x/d =
0.167
x = 250.876
z = 1419.375
fs = 107.221
File No.
N/mm2
mm
mm
N/mm2
<
375.000 N/mm2
OK
Project
fcb =
2.685
MGC
File No.
HB
Date
SB
Date
N/mm2
<
17.500
N/mm2
Sheet
OK
Project
MGC
File No.
HB
Date
SB
Date
Sheet
d
m
m
m
ec=(fs/Ec)
h
s
fs/Es
Cmin
acr
e1
Strain Diagram
Ms =
P =
s =
f1 =
478.109
0.000
100.000
kNm/m
kN
mm
20.000
mm
fs =
f2 =
nc =
0.000
mm
0.000
mm
75.000
mm
12.000
1000.000
1600.000
1600.000
mm
mm
mm
mm
75.000
mm
1000.000
mm
Lbar
cmin =
bt =
b =
h =
a =
fck,28 =
fy =
35.000
N/mm2
500.000
N/mm2
Shear Key Design LSD Page 153 of 365
Project
IS 456 : CL : 6.2.5.1
E eff= Ec / (1+q)
p =
0.0021
d =
q =
1503.000
1.100
Eeff = 14047.619
m =
8.000
m*p =
0.017
k = x/d =
0.167
x = 250.876
z = 1419.375
fs = 107.221
fcb =
2.685
e1 = 0.0005776
e2 = 0.0000000
e'1 = 0.0005776
e'1 = e1 - e2
MGC
File No.
HB
Date
SB
Date
Sheet
N/mm2
N/mm2
mm2
mm
N/mm2
mm
mm
N/mm2
N/mm2
max' crack width occurs midway between the bars on tension face
88.615
mm
em = -0.0001935
OK
Project
MGC
File No.
HB
Date
SB
Date
Sheet
Project
11.0
11.1
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
rad
rad
rad
rad
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
###
2
Cos ( )
Ka=
Cos . Cos ( + ) 1+
=
=
Sin ( + ) . Sin ( )
Cos ( + ) . Cos ( )
0.308
2 T/m3
2
Ka
Sheet
Calculations
for
11.1.1
1.329
15.758
0.718
15.518
2.736
Moment at base
11.147 Tm
P
T/m^2
T
m
T
T
Project
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Parapet Height
Parapet Thk
Weight of unit width
Nr
Weight of Both
2.1
0.3
1.575
2
3.15
m
m
T/m
###
T/m
F
Weight of Rail + Pads
Weight of Cables
Weight of Cable Through Cells
Weight of Hand Rails
Weight of Track Plinths
Weight of Misc (OCS, Signalling)
0.3
0.1
0.7
0.1
2.8
0.4
T/m
T/m
T/m
T/m
T/m
T/m
h
2
11.1.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
P
All the above weight are for unit length Perpendicular to abutment
Total Weight
Weight per Sqm
= 15.800 / 11.000 =
Height
h=
Width
=
Pressure For Surcharge
Force F
This force act at Height
Horizontal Component
Vertical Component
= 1.436 x 0.308 =
= 0.443 x 2.155 x 11.000 =
H
= 2.155 / 2 =
15.8 T/m
1.436 T/m^2
2.155
11
0.443
10.503
1.078
10.343
1.824
Calculations
for
m
m
T/m^2
T
m
T
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment at base
11.1.3
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
11.145 Tm
2.267
13.7 T/m
25 T
Track Slab
0.3
0.3
0.3
2.867
2.100
Since Method given in IRS Sub structure Code Clause 5.8.2 is for the case when track
centreline and abutment centreline concide.
In our case the track centre line of Indivisual track is eccentric to abutment centreline hence
the method given in Clause 5.8.2 is not applicable
6.1665
6.1665
1.4335 1.4335
2.867
1.9665
1.9665
Hence we analize below the effects following the same fundamental principles of Clause 5.8.2.
2.155
A. One Track Loded Condition
Height
LL Surcharge at top
Distribution length at Formation Level
Distribution length at Bottom of Pile Cap Level = B+h
Pressure at Bottom P1
Pressure at Top P2
h
S
B
2.155
9.316
2.867
5.022
m
T/m
m
m
1.002 T/m^2
0.572 T/m^2
B+
Strip Thk dx
x
1.0775
5.022
2.867
1.0775
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
SB
5.500
Date
Checked by
5.500
Px = P2 + (P1-P2)*x/h
Pressure at any height x from base
Width of strip of thickness dx at height x W=B+h-x
Fdx = Px.(B+h-x)dx
Force at This section on strip thk dx
11.000
F=
###
Sheet
0.1995869217 x2dx
P1
0.1995869217 h3/3
6.52565975 T
Px
Let the force act at a height H from base This height is calculated below
###
Calculations
for
Mdx = Fdxx
Mdx =
2.874 xdx +
0.43010982 x2dx Integrating This in range 0 To h we get Total Moment M
M=
2.874 h2/2 +
0.43010982 h3/3 -
0.1995869217 x3dx
0.1995869217 h4/4
M=
7.03139838 Tm
H=M/F
1.0775 m
Horizontal Component
Vertical Component
For Two Track Loaded
Horizontal Component
Vertical Component
Moment at base
H
6.427 T
1.133 T
P2
12.85 T
2.27 T
13.849 Tm
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Total Moment at Base due to earth Pressure
Total Moment at Base due to earth Pressure per m width
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
36.142 Tm
3.286 Tm/m width
0.1
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
7.765 degrees
9.462 degrees
rad
rad
rad
rad
###
11.2
Discipline
0.136 rad
0.165 rad
( 1 v ) Cos 2 ( )
Ca=
Sin ( + ) . Sin ( )
Cos . Cos . .Cos ( ++ ) 1+
Cos ( ) .Cos ( ++ )
2
Ca=
Calculations
for
0.441
11.2.1
P
2
Ca=
0.383
Max of two Ca=
0.441
Ca-Ka
=
0.132
=
2 T/m3
Dyn. Inc. of Earth Pres. on Dirt wall
h
=
2.155 m
width
=
11 m
= h(Ca- Ka)
Pressure Intensity at dirt wall base P
= 2.000 x 2.155 x 0.132 =
Force on Dirt Wall F
= 0.500 x 0.570 x 2.155 x 11.000 =
This force act at Height
H
= 2.155 / 2 =
Horizontal Component
Vertical Component
0.570
6.758
1.078
6.656
1.174
T/m^2
T
m
T
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment at Base
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
7.171 Tm
0.300 m
11 m
8.25 T/m
Parapet Height
Parapet Thk
Weight of unit width
Nr
Weight of Both
2.1
0.3
1.575
2
3.15
m
m
T/m
0.3
0.1
0.7
0.1
2.8
0.4
T/m
T/m
T/m
T/m
T/m
T/m
###
T/m
15.8 T/m
1.436 T/m^2
h
2
11.2.2
Discipline
Calculations
for
H
Height
h=
Width
=
Pressure For Surcharge
Force F
= 1.436 x 0.132 =
= 0.190 x 2.155 x 11.000 =
2.155
11
0.190
4.505
m
m
T/m^2
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
This force act at Height
Horizontal Component
Vertical Component
= 2.155 * 0.66 =
Moment at base
11.2.3
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
1.422 m
4.436 T
0.782 T
6.309 Tm
2.267
13.7 T/m
25 T
Track Slab
0
2.267
0.000
Since Method given in IRS Sub structure Code Clause 5.8.2 is for the case when track
centreline and abutment centreline concide.
In our case the track centre line of Indivisual track is eccentric to abutment centreline hence
the method given in Clause 5.8.2 is not applicable
-1.1335
-1.1335
1.1335 1.1335
2.267
-1.1335
-1.1335
Hence we analize below the effects following the same fundamental principles of Clause 5.8.2.
2.155
A. One Track Loded Condition
Height
LL Surcharge at top
Distribution length at Formation Level
h
S
B
2.155 m
9.316 T/m
2.267 m
B+
Strip Thk dx
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Distribution length at Bottom of Pile Cap Level = B+h
Pressure at Bottom P1
Pressure at Top P2
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
4.422 m
Sheet
0.544 T/m^2
0.279 T/m^2
4.422
2.267
1.0775
1.0775
0.000
0.000
Px = P2 + (P1-P2)*x/h
0.000
###
0.1229430858 x2dx
P1
0.1229430858 h3/3
2.86102717 T
Px
Let the force act at a height H from base This height is calculated below
###
Calculations
for
Mdx = Fdxx
Mdx =
1.232 xdx +
0.26494235 x2dx Integrating This in range 0 To h we get Total Moment M
M=
1.232 h2/2 +
0.26494235 h3/3 M=
3.08275678 Tm
Hcal=M/F
1.0775 m
Horizontal Component
Vertical Component
Two Track Loded Condition
0.1229430858 x3dx
0.1229430858 h4/4
1.32
1.422
2.818 T
0.497 T
H
P2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Horizontal Component
Vertical Component
Moment at Base
11.3
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
5.635 T
0.994 T
8.015 Tm
21.496 Tm
1.954 Tm/m width
3.4 T
3.06 T
6.46 T
Moment at Base
Moment Per m width
11.4
13.92 Tm
1.266 Tm/m width
38.715
16.727
6.46
61.902
36.142
21.496
13.92
71.558
ULS-1
F
FH
1.7
0
1.75
92.578 T
98.055 Tm
FM
65.815
0.000
11.305
77.120
F
61.441 1.7
0.000 1.6
24.362 0
85.803
ULS-2c
ULS-2d
FH
FM
F
FH
FM
65.8151 61.4406 1.7 65.8151 61.4406
26.7628 34.393 1.25 20.9085 26.8696
0
0
0.7
4.522 9.74491
92.578 95.8336
91.2456 98.055
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
LC
Earth Pressure
Dynamic Incriment
Braking & Trachtive
Total
SLS-1
38.715
16.727
6.460
61.902
36.142
21.496
13.921
71.558
FH
1
0
1.1
11.5.1
Mu
b
D
fck
fy
Clear Cover
Max Dia of Main bars
Dia of Distribution Bars
From Equation 2 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997
the effective depth d required is given as
d=
38.715
0.000
7.106
45.821
36.142
0.000
15.313
51.455
64.598 Tm
51.455 Tm
11.5
FM
F
1
1
0
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
SLS-2c
FH
FM
F
38.7148 36.1415 1
16.7268 21.4956 1
0
0
0.5
55.4415 57.6371
Sheet
Date
SLS-2d
FH
38.7148
16.7268
3.23
58.6715
FM
36.1415
21.4956
6.96065
64.5978
89.141 KNm/m
1.000 m
0.300 m
35.000
35000.000
500.000
75.000
16.000
10.000
N/mm^2
KN/m^2
N/mm^2
mm
mm
mm
Mu
0 . 15. f ck b
dreq
0.130 m
dprov
0.207 m
#NAME?
Dirt Wall LSD Page 165 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Assume As requored
1042.063 mm^2
From Equation 5 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 the lever arm z is given as
z= 1
1.1f y As
d> 0. 95 d
f ck bd
z
196.650 mm
From Equation 1 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 Area of steel reqired is given by
A s=
As calculated
Diff From assumed
Provide
Rein.provided
Mu
0 . 87 f y z
1042 mm^2
0.000 Goal seek this to zero
@
@
=
300
c/c
300
c/c
1340 mm2/m
Placed Alternatively
>
1042 o.k.
1340 mm2/m
1000.000 mm
207.000 mm
414.000 mm^2
>
414 o.k.
Secondary Reinforcement
As per Clause 15.9.4.2 the minmum reinf shall be 0.12 % b*d
b
d
Min Ast req
1000.000 mm
207.000 mm
124.200 mm^2
Dirt Wall LSD Page 166 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Provide
Provide Ast
11.5.2
150
c/c
524 mm2/m
>
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
124.200 o.k.
8.416
1000.000
207.000
1340
KN/m
mm
mm
mm^2
1.247
35.000 N/mm^2
{ }
0 .27 100 A s
vc=
m
bw d
vc
{ f ck }
0.611 N/mm^2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
svc
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
0.762 N/mm^2
11.6
Discipline
0.041 N/mm^2
<
0.762
Ms
P
s
f1
=
=
=
5.873
0.000
100.000
kNm/m
kN
mm
=
fs =
f2 =
16.000
mm
0.000
mm
0.000
mm
nc =
Lbar
75.000
mm
10.000
1000.000
300.000
mm
mm
mm
1000.000
mm
b =
h =
bt =
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Characteristic strength of concrete, 28 day cube strength
Characteristic strength of reinforcement bar
Permissible Compressive stress in concrete 0.5fck
Permissible Tensile stress in steel 0.75fy
Young modulus of concrete
Young modulus of steel
Area of Tension Reinforcement
Tension reinforcement proportion i.e.
p=As/(b*d)
Eff. Depth of Tension Reinf., d=h-nc-L bar-f1/2 OR d=h-nc-Lbar-f1-fs/2
Creep coefficient
IS 456 : CL : 6.2.5.1
Eff. Modulus of the concrete,
E eff= Ec / (1+q)
Modular ratio, for cracked section
m = 280/fck
therefore
Ratio of Neutral axis depth to Eff. Depth
x/d=[pm+2(mp)]-m*p
Depth to neutral axis
x=k*d
Lever arm
z = d-x/3
Stress in tension steel
f s=[Ms / (As*z)]
Compressive Stress in concrete fcb=2Ms/(z*b*x)
fck,28 =
fy =
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
35.000
N/mm
500.000
17.500
375.000
N/mm2
N/mm2
N/mm2
fc perm =
fs perm =
Ec,28 = 29500.000
Es = 200000.000
N/mm2
N/mm2
As =
p =
1340.413
0.0065
mm2
d =
q =
207.000
1.100
mm
Eeff
m
m*p
k = x/d
x
z
fs
Sheet
= 14047.619
=
8.000
=
0.052
=
0.274
=
56.763
= 188.079
N/mm2
mm
mm
23.294
N/mm2
<
375.000 N/mm2
OK
fcb =
1.100
N/mm
<
17.500
OK
N/mm
Project
11.7
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
d
m
m
m
ec=(fs/Ec)
h
s
fs/Es
Cmin
acr
e1
Strain Diagram
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Serviciability State Moment,
Serviciability State Axial Force
C/C bar Spacing of Tension Reinforcement
Diameter of Tension Reinforcement Bars 1st Layer
Diameter of Spacer Bar
Diameter of Tension Reinforcement Bars 2nd Layer
Nominal Cover to 1 layer of reinforcement
st
IS 456 : CL : 6.2.5.1
E eff= Ec / (1+q)
Ms
P
s
f1
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
=
=
=
4.678
0.000
100.000
kNm/m
kN
mm
16.000
mm
fs =
f2 =
0.000
mm
0.000
mm
nc =
Lbar
75.000
mm
10.000
1000.000
300.000
300.000
mm
mm
mm
mm
75.000
mm
1000.000
mm
b =
h =
a =
cmin =
bt =
fck,28 =
fy =
35.000
N/mm2
500.000
N/mm2
Ec,28 = 29500.000
Es = 200000.000
As = 1340.413
p =
0.0065
d =
q =
207.000
1.100
Eeff = 14047.619
m =
8.000
m*p =
0.052
k = x/d =
0.274
x =
56.763
z = 188.079
fs =
18.555
Sheet
N/mm2
N/mm2
mm2
mm
N/mm2
mm
mm
N/mm2
Dirt Wall LSD Page 171 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
fcb =
e1 = 0.0001502
e2 = 0.0000000
0.876
e'1 = 0.0001502
max' crack width occurs midway between the bars on tension face
acr =
88.897
Sheet
N/mm
mm
em = -0.0003395
OK
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Project
12.0
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
ka = 0.325
b = 2.455
Calculations
for
Q1=ka*SHt
= 2.00
1.20 m
Q2=ka**b
The end return wall has been designed as a plate fixed on its two faces i.e. at the base and on one of its vertical sides.
( Refer Table 26 of Formula of Stress & Strain by Roark & Young ).
S.NO.
1
Height of Length of
return wall return wall
(m) "b"
(m) "a"
2.455
3.24
"a/b"
1.320
Q1 (t/m2)
0.779
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
"a/b"
1.320
Q2
(t/m2)
1.594
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
ULS F
Total Moment in Vertical Direction =
Total Moment in Horizontal Direction =
Discipline
2.50 tm/m
2.02 tm/m
1.7
1.7
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
12.1
12.1.1
Mu
b
D
fck
fy
Clear Cover
Max Dia of Main bars
Dia of Distribution Bars
From Equation 2 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997
the effective depth d required is given as
d=
Required Effective Depth
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
42.462 KNm/m
1.000 m
0.200 m
35.000
35000.000
500.000
75.000
16.000
12.000
N/mm^2
KN/m^2
N/mm^2
mm
mm
mm
Mu
0 . 15. f ck b
dreq
0.090 m
dprov
0.105 m
#NAME?
Assume As requored
978.594 mm^2
From Equation 5 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 the lever arm z is given as
z= 1
1.1f y As
d> 0. 95 d
f ck bd
z
99.750 mm
From Equation 1 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 Area of steel reqired is given by
Return Wall LSD Page 192 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
A s=
As calculated
Diff From assumed
Provide
Rein.provided
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Mu
0 . 87 f y z
979 mm^2
0.000 Goal seek this to zero
@
@
=
300
c/c
300
c/c
1340 mm2/m
Placed Alternatively
>
979 o.k.
1340 mm2/m
1000.000 mm
105.000 mm
210.000 mm^2
>
210 o.k.
Secondary Reinforcement
As per Clause 15.9.4.2 the minmum reinf shall be 0.12 % b*d
b
d
Min Ast req
Provide
Provide Ast
1000.000 mm
105.000 mm
63.000 mm^2
@
150
c/c
754 mm2/m
>
63.000 o.k.
Project
12.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Stress Check For Screen Wall for Serviceability Limit State Vertical Direction
Ms
P
s
f1
=
=
=
24.978
0.000
100.000
kNm/m
kN
mm
=
fs =
f2 =
16.000
mm
0.000
mm
0.000
mm
nc =
Lbar
b =
h =
bt =
75.000
mm
12.000
1000.000
200.000
mm
mm
mm
1000.000
mm
fck,28 =
fy =
35.000
N/mm2
500.000
17.500
375.000
N/mm2
N/mm2
N/mm2
fc perm =
fs perm =
Ec,28 = 29500.000
Es = 200000.000
N/mm2
N/mm2
Return Wall LSD Page 194 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Area of Tension Reinforcement
Tension reinforcement proportion i.e.
p=As/(b*d)
Eff. Depth of Tension Reinf., d=h-nc-L bar-f1/2 OR d=h-nc-Lbar-f1-fs/2
Creep coefficient
Eff. Modulus of the concrete,
IS 456 : CL : 6.2.5.1
E eff= Ec / (1+q)
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
As =
p =
1340.413
0.0128
mm
d =
q =
105.000
1.100
mm
Eeff = 14047.619
m =
8.000
m*p =
0.102
k = x/d =
0.361
x =
37.927
z =
92.358
fs = 201.765
fcb =
14.261
Sheet
N/mm2
mm
mm
N/mm2
<
375.000 N/mm2
OK
N/mm
<
17.500
OK
N/mm
Project
12.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Design of Screen Wall for Serviceability Limit State of Cracking Vertical Direction
b
x
d
m
m
m
ec=(fs/Ec)
h
s
Cmin
fs/Es
acr
e1
Strain Diagram
Ms =
P =
s =
f1 =
24.978
0.000
100.000
kNm/m
kN
mm
16.000
mm
fs =
f2 =
0.000
mm
0.000
mm
Return Wall LSD Page 196 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Nominal Cover to 1 layer of reinforcement
st
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
nc =
Lbar
b =
h =
a =
cmin =
75.000
mm
12.000
1000.000
200.000
200.000
mm
mm
mm
mm
75.000
mm
bt =
1000.000
mm
fck,28 =
fy =
35.000
N/mm2
500.000
N/mm2
Ec,28 = 29500.000
Es = 200000.000
As = 1340.413
p =
0.0128
d =
q =
105.000
1.100
Eeff
m
m*p
k = x/d
x
z
fs
Sheet
N/mm2
N/mm2
mm2
mm
= 14047.619
=
8.000
=
0.102
=
0.361
=
37.927
=
92.358
N/mm2
mm
mm
201.765
N/mm2
fcb =
14.261
N/mm2
e1 = 0.0024377
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
e2 = 0.00000000
e'1 = 0.0024377
e'1 = e1 - e2
Sheet
max' crack width occurs midway between the bars on tension face
88.897
mm
12.4
12.4.1
Mu
b
D
fck
fy
Clear Cover
Max Dia of Main bars
Dia of Distribution Bars
From Equation 2 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997
the effective depth d required is given as
d=
Required Effective Depth
em = 0.0019507
mm > 0.2 mm
34.349 KNm/m
1.000 m
0.200 m
35.000
35000.000
500.000
75.000
16.000
12.000
N/mm^2
KN/m^2
N/mm^2
mm
mm
mm
Mu
0 . 15. f ck b
dreq
0.081 m
Return Wall LSD Page 198 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
dprov
0.105 m
#NAME?
Assume As requored
791.620 mm^2
From Equation 5 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 the lever arm z is given as
z= 1
1.1f y As
d> 0. 95 d
f ck bd
z
99.750 mm
From Equation 1 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 Area of steel reqired is given by
A s=
As calculated
Diff From assumed
Provide
Rein.provided
Mu
0 . 87 f y z
792 mm^2
0.000 Goal seek this to zero
@
@
=
300
c/c
300
c/c
1340 mm2/m
Placed Alternatively
>
792 o.k.
1340 mm2/m
1000.000 mm
105.000 mm
210.000 mm^2
>
210 o.k.
Secondary Reinforcement
As per Clause 15.9.4.2 the minmum reinf shall be 0.12 % b*d
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
b
d
Min Ast req
Provide
Provide Ast
12.5
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
1000.000 mm
105.000 mm
63.000 mm^2
@
150
c/c
754 mm2/m
>
63.000 o.k.
Stress Check For Screen Wall for Serviceability Limit State HORIzontal Direction
Ms
P
s
f1
=
=
=
20.206
0.000
100.000
kNm/m
kN
mm
=
fs =
f2 =
16.000
mm
0.000
mm
0.000
mm
nc =
Lbar
75.000
mm
12.000
mm
Return Wall LSD Page 200 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Width of Section
Total depth of member
Width of section at centroid of tension reinforcement
Characteristic strength of concrete, 28 day cube strength
Characteristic strength of reinforcement bar
Permissible Compressive stress in concrete 0.5fck
Permissible Tensile stress in steel 0.75fy
Young modulus of concrete
Young modulus of steel
Area of Tension Reinforcement
Tension reinforcement proportion i.e.
p=As/(b*d)
Eff. Depth of Tension Reinf., d=h-nc-L bar-f1/2 OR d=h-nc-Lbar-f1-fs/2
Creep coefficient
IS 456 : CL : 6.2.5.1
Eff. Modulus of the concrete,
E eff= Ec / (1+q)
Modular ratio, for cracked section
m = 280/fck
therefore
Ratio of Neutral axis depth to Eff. Depth
x/d=[pm+2(mp)]-m*p
Depth to neutral axis
x=k*d
Lever arm
z = d-x/3
Stress in tension steel
f s=[Ms / (As*z)]
Compressive Stress in concrete fcb=2Ms/(z*b*x)
b =
h =
bt =
fck,28 =
fy =
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
1000.000
mm
200.000
mm
Date
1000.000
mm
35.000
N/mm2
500.000
17.500
375.000
N/mm2
N/mm2
N/mm2
fc perm =
fs perm =
Ec,28 = 29500.000
Es = 200000.000
N/mm2
N/mm2
As =
p =
1340.413
0.0128
mm2
d =
q =
105.000
1.100
mm
Eeff = 14047.619
m =
8.000
m*p =
0.102
k = x/d =
0.361
x =
37.927
z =
92.358
fs = 163.215
fcb =
11.537
Sheet
N/mm2
mm
mm
N/mm2
<
375.000 N/mm2
OK
N/mm
<
17.500
OK
N/mm
Project
12.6
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Design of Screen Wall for Serviceability Limit State of Cracking Horizontal Direction
b
x
d
m
m
m
ec=(fs/Ec)
h
s
fs/Es
Cmin
acr
Return Wall LSD Page 202 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Cmin
Pile Cap)
acr
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
e1
Strain Diagram
Serviciability State Moment,
Serviciability State Axial Force
C/C bar Spacing of Tension Reinforcement
Diameter of Tension Reinforcement Bars 1st Layer
Diameter of Spacer Bar
Diameter of Tension Reinforcement Bars 2 Layer
nd
IS 456 : CL : 6.2.5.1
E eff= Ec / (1+q)
m = 280/fck
x/d=[pm+2(mp)]-m*p
Ms
P
s
f1
=
=
=
20.206
0.000
100.000
kNm/m
kN
mm
=
fs =
f2 =
16.000
mm
0.000
mm
0.000
mm
nc =
Lbar
b =
h =
a =
cmin =
75.000
mm
12.000
1000.000
200.000
200.000
mm
mm
mm
mm
75.000
mm
bt =
1000.000
mm
fck,28 =
fy =
35.000
N/mm2
500.000
N/mm2
Ec,28 = 29500.000
Es = 200000.000
As = 1340.413
p =
0.0128
d =
q =
105.000
1.100
Eeff
m
m*p
k = x/d
= 14047.619
=
8.000
=
0.102
=
0.361
N/mm2
N/mm2
mm2
mm
N/mm2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Depth to neutral axis
Lever arm
Stress in tension steel
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
37.927
mm
92.358
mm
Date
x=k*d
z = d-x/3
f s=[Ms / (As*z)] should be < 0.8*fy
x =
z =
fs =
163.215
N/mm2
fcb =
11.537
N/mm2
e1 = 0.0019719
e2 = 0.00000000
e'1 = 0.0019719
e'1 = e1 - e2
Sheet
max' crack width occurs midway between the bars on tension face
88.897
mm
em = 0.0014850
> 0.2 mm
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Project
13.0
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
ka = 0.308
b = 2.455
Calculations
for
Q1=ka*SHt
= 2.00
1.20 m
Q2=ka**b
The end return wall has been designed as a plate fixed on its two faces i.e. at the base and on one of its vertical sides.
( Refer Table 26 of Formula of Stress & Strain by Roark & Young ).
S.NO.
1
Height of Length of
return wall return wall
(m) "b"
(m) "a"
2.455
1.86
"a/b"
0.758
Q1 (t/m2)
0.740
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
"a/b"
0.758
Q2
(t/m2)
1.515
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Varying load due to earth pressure over entire plate
(at x=a & z=0) (at x=0 & z=0.8b)
1
2
1
2
Mb2 (t-m/m)
Ma1 (t-m/m)
0.328
0.200
0.483 0.195
-0.50
-0.30
ULS F
Total Moment in Vertical Direction =
Total Moment in Horizontal Direction =
Discipline
0.968 tm/m
0.774 tm/m
1.7
1.7
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
13.1
13.1.1
Mu
b
D
fck
fy
Clear Cover
Max Dia of Main bars
Dia of Distribution Bars
From Equation 2 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997
the effective depth d required is given as
d=
Required Effective Depth
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
16.460 KNm/m
1.000 m
0.200 m
35.000
35000.000
500.000
75.000
16.000
12.000
N/mm^2
KN/m^2
N/mm^2
mm
mm
mm
Mu
0 . 15. f ck b
dreq
0.056 m
dprov
0.105 m
#NAME?
Assume As requored
379.349 mm^2
From Equation 5 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 the lever arm z is given as
z= 1
1.1f y As
d> 0. 95 d
f ck bd
z
99.750 mm
From Equation 1 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 Area of steel reqired is given by
A s=
Mu
0 . 87 f y z
Screen Wall LSD Page 223 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Mu
Pile Cap)
A s=
0 . 87 f y z
As calculated
Diff From assumed
Provide
Rein.provided
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
379 mm^2
0.000 Goal seek this to zero
@
@
=
300
c/c
300
c/c
1340 mm2/m
Placed Alternatively
>
379 o.k.
1340 mm2/m
1000.000 mm
105.000 mm
210.000 mm^2
>
210 o.k.
Secondary Reinforcement
As per Clause 15.9.4.2 the minmum reinf shall be 0.12 % b*d
b
d
Min Ast req
Provide
Provide Ast
1000.000 mm
105.000 mm
63.000 mm^2
@
150
c/c
754 mm2/m
>
63.000 o.k.
Project
13.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Stress Check For Screen Wall for Serviceability Limit State Vertical Direction
9.683
0.000
100.000
kNm/m
kN
mm
16.000
mm
fs =
f2 =
0.000
mm
0.000
mm
nc =
Lbar
75.000
mm
12.000
1000.000
200.000
mm
mm
mm
1000.000
mm
b =
h =
bt =
fck,28 =
fy =
35.000
N/mm2
500.000
17.500
375.000
N/mm2
N/mm2
N/mm2
fc perm =
fs perm =
Ec,28 = 29500.000
Es = 200000.000
Ms =
P =
s =
f1 =
p=As/(b*d)
As =
p =
1340.413
0.0128
N/mm2
N/mm2
mm2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Eff. Depth of Tension Reinf., d=h-nc-L bar-f1/2 OR d=h-nc-Lbar-f1-fs/2
Creep coefficient
IS 456 : CL : 6.2.5.1
Eff. Modulus of the concrete,
E eff= Ec / (1+q)
Modular ratio, for cracked section
m = 280/fck
therefore
Ratio of Neutral axis depth to Eff. Depth
x/d=[pm+2(mp)]-m*p
Depth to neutral axis
x=k*d
Lever arm
z = d-x/3
Stress in tension steel
f s=[Ms / (As*z)]
Compressive Stress in concrete fcb=2Ms/(z*b*x)
d =
q =
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
105.000
1.100
Eeff = 14047.619
m =
8.000
m*p =
0.102
k = x/d =
0.361
x =
37.927
z =
92.358
fs =
78.213
fcb =
5.528
Sheet
mm
N/mm2
mm
mm
N/mm2
<
375.000 N/mm2
OK
N/mm
<
17.500
OK
N/mm
Project
13.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Design of Screen Wall for Serviceability Limit State of Cracking Vertical Direction
b
x
d
m
m
m
ec=(fs/Ec)
h
s
fs/Es
Cmin
acr
e1
Strain Diagram
Ms =
P =
s =
f1 =
9.683
0.000
100.000
kNm/m
kN
mm
16.000
mm
fs =
f2 =
0.000
mm
0.000
mm
nc =
Lbar
b =
75.000
mm
12.000
1000.000
mm
mm
Screen Wall LSD Page 227 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Total depth of member
Dist' from comp' face to the point at which the crack is being cal'd, Usually 'h' if crack
Minimum clear cover to tension reinforcement
Width of section at centroid of tension reinforcement
Characteristic strength of concrete, 28 day cube strength
Characteristic strength of reinforcement bar
Young modulus of concrete
Young modulus of steel
Area of Tension Reinforcement
Tension reinforcement proportion i.e.
p=As/(b*d)
Eff. Depth of Tension Reinf., d=h-nc-L bar-f1/2 OR d=h-nc-Lbar-f1-fs/2
Creep coefficient
IS 456 : CL : 6.2.5.1
Eff. Modulus of the concrete,
E eff= Ec / (1+q)
Modular ratio, for cracked section
m = 280/fck
therefore
Ratio of Neutral axis depth to Eff. Depth
x/d=[pm+2(mp)]-m*p
Depth to neutral axis
x=k*d
Lever arm
z = d-x/3
Stress in tension steel
f s=[Ms / (As*z)] should be < 0.8*fy
Compressive Stress in concrete fcb=2Ms/(z*b*x) should be<0.45fck
h =
a =
cmin =
bt =
fck,28 =
fy =
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
200.000
mm
200.000
mm
Date
75.000
mm
1000.000
mm
35.000
N/mm2
500.000
N/mm2
Ec,28 = 29500.000
Es = 200000.000
As = 1340.413
p =
0.0128
d =
q =
105.000
1.100
Eeff = 14047.619
m =
8.000
m*p =
0.102
k = x/d =
0.361
x =
37.927
z =
92.358
fs =
78.213
fcb =
5.528
e1 = 0.0009450
e2 = 0.00000000
e'1 = 0.0009450
e'1 = e1 - e2
Sheet
N/mm2
N/mm2
mm2
mm
N/mm2
mm
mm
N/mm2
N/mm2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
max' crack width occurs midway between the bars on tension face
88.897
mm
13.4
13.4.1
Mu
b
D
fck
fy
Clear Cover
Max Dia of Main bars
Dia of Distribution Bars
From Equation 2 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997
the effective depth d required is given as
d=
Required Effective Depth
Effective Deprh Provided
em = 0.0004580
mm=< 0.2mm OK
13.163 KNm/m
1.000 m
0.200 m
35.000
35000.000
500.000
75.000
16.000
12.000
N/mm^2
KN/m^2
N/mm^2
mm
mm
mm
Mu
0 . 15. f ck b
dreq
0.050 m
dprov
0.105 m
#NAME?
Assume As requored
301.810 mm^2
From Equation 5 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 the lever arm z is given as
Screen Wall LSD Page 229 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
z= 1
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
1.1f y As
d> 0. 95 d
f ck bd
z
100.257 mm
From Equation 1 Clause 15.4.2.2.1 of IRS Concrete Brifdge Code 1997 Area of steel reqired is given by
A s=
As calculated
Diff From assumed
Provide
Rein.provided
Mu
0 . 87 f y z
302 mm^2
0.000 Goal seek this to zero
@
@
=
300
c/c
300
c/c
1340 mm2/m
Placed Alternatively
>
302 o.k.
1340 mm2/m
1000.000 mm
105.000 mm
210.000 mm^2
>
210 o.k.
Secondary Reinforcement
As per Clause 15.9.4.2 the minmum reinf shall be 0.12 % b*d
b
d
Min Ast req
Provide
Provide Ast
1000.000 mm
105.000 mm
63.000 mm^2
@
150
c/c
754 mm2/m
>
63.000 o.k.
Screen Wall LSD Page 230 of 365
Project
13.5
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Stress Check For Screen Wall for Serviceability Limit State HORIzontal Direction
Ms =
P =
s =
f1 =
7.743
0.000
100.000
kNm/m
kN
mm
16.000
mm
fs =
f2 =
0.000
mm
0.000
mm
nc =
Lbar
75.000
mm
12.000
1000.000
200.000
mm
mm
mm
1000.000
mm
b =
h =
bt =
fck,28 =
35.000
N/mm2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Characteristic strength of reinforcement bar
Permissible Compressive stress in concrete 0.5fck
Permissible Tensile stress in steel 0.75fy
Young modulus of concrete
Young modulus of steel
Area of Tension Reinforcement
Tension reinforcement proportion i.e.
p=As/(b*d)
Eff. Depth of Tension Reinf., d=h-nc-L bar-f1/2 OR d=h-nc-Lbar-f1-fs/2
Creep coefficient
IS 456 : CL : 6.2.5.1
Eff. Modulus of the concrete,
E eff= Ec / (1+q)
Modular ratio, for cracked section
m = 280/fck
therefore
Ratio of Neutral axis depth to Eff. Depth
x/d=[pm+2(mp)]-m*p
Depth to neutral axis
x=k*d
Lever arm
z = d-x/3
Stress in tension steel
f s=[Ms / (As*z)]
Compressive Stress in concrete fcb=2Ms/(z*b*x)
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
fy = 500.000
fc perm =
17.500
fs perm = 375.000
Ec,28 = 29500.000
Es = 200000.000
N/mm
N/mm2
N/mm2
2
N/mm2
N/mm2
As =
p =
1340.413
0.0128
mm2
d =
q =
105.000
1.100
mm
Eeff
m
m*p
k = x/d
x
z
fs
Sheet
= 14047.619
=
8.000
=
0.102
=
0.361
=
37.927
=
92.358
N/mm2
mm
mm
62.543
N/mm2
<
375.000 N/mm2
OK
fcb =
4.421
N/mm
<
17.500
OK
N/mm
Project
13.6
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Design of Screen Wall for Serviceability Limit State of Cracking Horizontal Direction
b
x
d
m
m
m
ec=(fs/Ec)
h
s
fs/Es
Cmin
acr
e1
Strain Diagram
Ms =
7.743
kNm/m
Screen Wall LSD Page 233 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Serviciability State Axial Force
C/C bar Spacing of Tension Reinforcement
Diameter of Tension Reinforcement Bars 1st Layer
Diameter of Spacer Bar
Diameter of Tension Reinforcement Bars 2nd Layer
Nominal Cover to 1 layer of reinforcement
st
P =
s =
f1 =
fs =
f2 =
nc =
Lbar
b
h
a
cmin
=
=
=
=
bt =
fck,28 =
fy =
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
0.000
kN
100.000
mm
Date
16.000
mm
0.000
mm
0.000
mm
75.000
mm
12.000
1000.000
200.000
200.000
mm
mm
mm
mm
75.000
mm
1000.000
mm
35.000
N/mm2
500.000
N/mm2
Ec,28 = 29500.000
Es = 200000.000
As = 1340.413
p =
0.0128
d =
q =
105.000
1.100
Eeff
m
m*p
k = x/d
x
z
fs
N/mm2
N/mm2
mm2
mm
= 14047.619
=
8.000
=
0.102
=
0.361
=
37.927
=
92.358
mm
mm
N/mm2
62.543
Sheet
N/mm2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
fcb =
e1 = 0.0007556
e2 = 0.00000000
4.421
e'1 = 0.0007556
max' crack width occurs midway between the bars on tension face
acr =
88.897
Sheet
N/mm
mm
em = 0.0002687
=< 0.2mm OK
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
1.200m
5.400m
11.000m
1.800m
11.000m
11.000m
6
0.000m
267.3t
0.0t
=
=
345.6
3.100
11.000
11.000
97.41
21.62
75.79
t
m
m
m
tm/m
tm/m
t-m/m
MGC
File No.
HB
Date
SB
Date
Sheet
M35
Fe 500
2.4
Permissible stresses:
st =
bc =
###
1167t/m^2
t/m3
st/bc
=
10
m/(m+r)
=
1-k/3
=
0.5*cbc*k*j =
deff reqd
=
=
deff provd
20.57
0.327
0.891
###
sqrt(75.79/(170.01*1.0))
0.668 m
{(1.8*1000)-75-20-20/2}
667.7 mm
=
###
20 f
mm
20
mm
75
mm
### m2
2091 mm2
20.91 cm2/m
Thus O.K
Provide
Rein.provided
@
@
=
200
200
31.4 cm2/m
=
=
Provide
Rein.provided
@
@
=
c/c
(In One Layers at bottom in long directions)
c/c
0.06%
>
of Cross-sectional area.
(0.0006*1.8*1.0*1000000)
1080 mm2
10.8 cm2
150
200
20.91 o.k.
c/c
c/c (In One Layers at top in long directions)
13.4 cm2/m
>
10.80 o.k.
1695
mm
Distance of the Maximum Reaction Force from the Face of the pier
3100
mm
= (3,100-1,695)
=
1405
mm
345.65
0000
0000
345.65
31.42
% of steel,
100*As/bd
=
=
0.185 %
0.209 Mpa
21.36 t/m2
T/m
100*(100*31.42)/(1000*1695)
(21.36*1.0*1,695)/1000=
36.20
t/m
o.k.
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
7.0
7.1
Normal Case One - Track Loaded Condiition ie transverse maximum moment case
S.No
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
4.1
4.1.1
4.1.2
4.1.3
4.2
4.2.1
4.2.2
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
1.700
Superimposed Dead Load (SIDL)
106.128
1.700
Live Load (LL)
94.127
1.700
Walkway Live Load
7.832
1.700
Long Welded Rail Force
-2.703
1.700
Breaking and Tractive Force
-2.453
1.700
Raking Force
0.000
0.000
Transverse Wind Force on Coach
0.000
0.000
Longitudinal Wind Force on Coach
-0.288
1.700
Trans. Wind Force on Superstructure
0.000
0.000
Load from Substructure
Dead Load of Pedestals
1.504
1.700
Dead Load of Dirt Wall
20.254
0.690
Dead Load of Dirt Wall Bracket
3.713
0.407
Dead Load of Return Wall
4.971
-1.080
Dead Load of Screen Wall
2.854
1.770
Dead Load of Pile Cap
267.300
0.000
Weight of Soil Above Pile Cap
174.992
-1.080
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
Dead Load Surcharge on Dirt wall
3.347
-2.700
Live Load Surcharge on Dirt wall
2.237
-2.700
Earth Pressure in Transverse Direction (Behind Return Wall)
Earth Pressure on Return wall
1.044
-1.080
Dead Load Surcharge on Return wall
0.696
-1.080
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
0.000
0.000
2.100
4.978
0.000
2.100
0.000
0.000
2.100
0.000
0.000
0.000
0.000
0.000
29.980
27.200
0.000
0.000
1.859
0.000
0.000
0.000
0.000
0.000
2.105
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
0.000
5.996
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
160.017
13.315
58.512
53.086
0.000
0.000
3.423
0.000
0.000
0.000
197.668
38.985
0.000
-5.151
27.923
43.528
-0.604
31.743
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
0.000
0.000
2.100
52.269
18.983
12.685
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
5.200
5.200
0.000
0.000
0.000
0.000
4.773
3.181
2.518
2.878
44.024
28.501
19.045
0.000
-1.127
-0.751
0.000
0.000
4.697
0.000
17.446
12.771
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Live Load Surcharge on Return wall
0.165
-1.080
5.200
Vertical Reaction & Eccn
S.No
Descrioption
eL (m)
eT (m)
V (T)
4.3
Earth Pressure in Transverse Direction (On Screen Wall)
4.3.1
Earth Pressure on Screen wall
0.697
1.620
-5.500
4.3.2
Earth Pressure on Pile cap
3.494
0.000
-5.500
4.3.3
Dead+Live Load Surch. on Screen wall
0.463
0.000
-5.500
TOTAL WITH LWR FORCES
910.313359
TOTAL WITHOUT LWR FORCES
913.017
A. With LWR Forces
eL
Vertical Load V
910.313359 T
Pile Id
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
0.000
0.000
0.754
2.044
-0.178
2.400
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
0.000
0.000
0.000
142.9749472
112.9949472
eT
0.000
0.000
0.000
3.955
19.813
2.624
56.3108213
56.3108213
eL2
eT2
2.618
0.820
0.473
V/n
1.130
0.000
0.000
746.376214
687.864
ML.eL/eL2
6.519
-2.977
-1.305
385.02037
385.02037
MT.eT/eT2
Vp
142.974947 T
1.8
-3.6
3.24
12.96
56.311 T
746.376214 Tm
2
3
1.8
1.8
0
3.6
3.24
3.24
0
12.96
151.718893 69.1089087
0
220.827802
151.718893 69.1089087 26.7375257 247.565327
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
VP max
VP min
385.020 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
247.565 T
55.872 T
Total
Hor Load On Pile in Long Dir HPL
23.829 T
913.016855 T
eL
19.44
51.84
910.313359 2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
9.385 T
910.313359
Pile Id
eT
eL2
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
112.994947 T
1.8
-3.6
3.24
12.96
56.311 T
1.8
3.24
687.864 Tm
1.8
3.6
3.24
12.96
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
385.020 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
215.860611
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
VP max
242.598 T
VP min
61.741 T
7.2
Total
Hor Load On Pile in Long Dir HPL
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
19.44
51.84
913.016855
Horizontal Force on Pile in Trans Dir HPT
18.832 T
Sheet
913.016855
9.385 T
Normal Case Two- Track Loaded Condiition ie Longitudinal maximum moment case
S.No
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.1.9
3.1.10
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
4.1
4.1.1
4.1.2
4.1.3
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
1.700
Superimposed Dead Load (SIDL)
106.128
1.700
Live Load (LL)
188.255
1.700
Walkway Live Load
15.665
1.700
Long Welded Rail Force
-2.703
1.700
Breaking and Tractive Force
-4.660
1.700
Raking Force
0.000
0.000
Transverse Wind Force on Coach
0.000
0.000
Longitudinal Wind Force on Coach
-0.576
1.700
Trans. Wind Force on Superstructure
0.000
0.000
Load from Substructure
Dead Load of Pedestals
1.504
1.700
Dead Load of Dirt Wall
20.254
0.690
Dead Load of Dirt Wall Bracket
3.713
0.407
Dead Load of Return Wall
4.971
-1.080
Dead Load of Screen Wall
2.854
1.770
Dead Load of Pile Cap
267.300
0.000
Weight of Soil Above Pile Cap
174.992
-1.080
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
Dead Load Surcharge on Dirt wall
3.347
-2.700
Live Load Surcharge on Dirt wall
4.473
-2.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
29.980
51.680
0.000
0.000
3.717
0.000
0.000
0.000
0.000
0.000
2.105
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
0.000
11.992
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
320.033
26.630
58.512
100.864
0.000
0.000
6.846
0.000
0.000
0.000
0.000
0.000
0.000
0.000
55.847
43.528
0.000
31.743
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
0.000
0.000
0.000
52.269
18.983
25.369
1.318
1.978
1.978
0.000
0.000
0.000
0.000
0.000
0.000
44.024
28.501
38.090
0.000
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
eL (m)
eT (m)
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
4.3
4.3.1
4.3.2
4.3.3
1.620
0.000
0.000
-5.500
-5.500
-5.500
eL
eT
3.24
12.96
3.24
3.24
0
12.96
168.669062 91.6623188
0
260.331381
168.669062 91.6623188 12.315926 272.647307
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
1.8
2
3
1.8
1.8
4
5
6
VP min
64.691 T
1.130
6.519
0.000
-2.977
0.000
-1.305
989.953043 177.349335
931.441 177.349335
0
3.6
62.307 T
989.953043 Tm
272.647 T
2.618
0.820
0.473
-3.6
181.998026 T
VP max
3.955
19.813
2.624
62.3068213
62.3068213
eT2
1012.01437 T
177.349 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
0.000
0.000
0.000
eL2
Vertical Load V
Horizontal Load Longitudinal HL
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
0.000
0.000
0.000
181.9980258
152.0180258
Total
Hor Load On Pile in Long Dir HPL
30.333 T
1014.71787 T
eL
V/n
19.44
51.84
1012.01437
Horizontal Force on Pile in Trans Dir HPT
ML.eL/eL2
MT.eT/eT2
Vp
89.322669
1012.01437
MT.eT/eT2
Vp
10.384 T
Pile Id
eT
eL2
eT2
152.018026 T
1.8
-3.6
3.24
12.96
62.307 T
1.8
3.24
931.441 Tm
1.8
3.6
3.24
12.96
V/n
ML.eL/eL2
255.36419
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
VP max
70.559 T
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
267.680 T
VP min
7.3
177.349 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
Discipline
Total
Hor Load On Pile in Long Dir HPL
19.44
51.84
1014.71787 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
10.384 T
25.336 T
1014.71787
VP max
VP min
HPL
HPT
Description
1 One Track Loaded without LWR Forces
242.598
61.741
18.832
9.385
2 Two Track Loaded without LWR Forces
267.680
70.559
25.336
10.384
Max (Min in case of VP min)
267.680
61.741
25.336
10.384
267.680 T
61.741 T
27.382 T
<
>
>
284 T
0 T
13.9 T
Hp
21.041
27.382
27.382
OK
OK (NO TENSION)
NOT OK
The Pile Cannot Take the Horizontal Forces in the system for 5 mm deflection
We Provide Shear Key in Longitudinal and Transverse Direction to Take This load
However The Piles will be designed for Moment Due to these Forces
Description
1 One Track Loaded with LWR Forces
3 TwoTrack Loaded with LWR Forces
Max (Min in case of VP min)
VP max
VP min
HPL
HPT
247.565
272.647
55.872
64.691
23.829
30.333
9.385
10.384
Hp
25.611
32.061
272.647
55.872
30.333
10.384
32.061
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Max Vertical Load in Pile
MIN Vertical Load in Pile
Max Horizontal Load in Pile
7.4
272.647 T
55.872 T
32.061 T
<
>
>
326.6 T
0 T
13.9 T
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
OK
OK (NO TENSION)
NOT OK
The Pile Cannot Take the Horizontal Forces in the system for 5 mm deflection
We Provide Shear Key in Longitudinal and Transverse Direction to Take This load
However The Piles will be designed for Moment Due to these Forces
Descrioption
V (T)
Loads From Superstructure
Dead Load of Girder + Slab
210.724
1.700
Superimposed Dead Load (SIDL)
106.128
1.700
Live Load (LL)
47.064
1.700
Walkway Live Load
3.916
1.700
Breaking and Tractive Force
-1.226
1.700
Raking Force
0.000
0.000
Transverse Wind Force on Coach
0.000
0.000
Longitudinal Wind Force on Coach
-0.288
1.700
Trans. Wind Force on Superstructure
0.000
0.000
Load from Substructure
Dead Load of Pedestals
1.504
1.700
Dead Load of Dirt Wall
20.254
0.690
Dead Load of Dirt Wall Bracket
3.713
0.407
Dead Load of Return Wall
4.971
-1.080
Dead Load of Screen Wall
2.854
1.770
Dead Load of Pile Cap
267.300
0.000
Weight of Soil Above Pile Cap
174.992
-1.080
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
0.000
0.000
2.100
4.978
2.100
0.000
0.000
2.100
0.000
0.000
0.000
0.000
0.000
13.600
0.000
0.000
1.859
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
2.998
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
80.008
6.657
26.543
0.000
0.000
3.423
0.000
0.000
0.000
98.834
19.493
-2.575
13.962
43.528
-0.604
31.743
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
0.000
52.269
1.318
0.000
0.000
44.024
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Dead Load Surcharge on Dirt wall
3.347
-2.700
0.000
18.983
1.978
0.000
0.000
28.501
0.000
Live Load Surcharge on Dirt wall
2.237
-2.700
2.100
12.685
1.978
0.000
0.000
19.045
4.697
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
eL (m)
eT (m)
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
889.343341 T
3.494
0.463
863.263
18.896
7.184
889.343
0.000
0.000
96.541 T
968.47402 Tm
369.285 Tm
6
= V / n + ML.eL/eL2 + MT.eT/eT2
263.542 T
32.906 T
eL
Pile Id
301.787578 T
-5.500
-5.500
0.000
0.000
99.395
166.394
35.999
301.788
eT
19.813
2.624
53.313
38.746
4.482
96.541
eL2
eT2
0.820
0.473
V/n
0.000
0.000
574.655
331.286
62.533
968.474
ML.eL/eL2
-2.977
-1.305
255.308
106.322
7.655
369.285
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
2
3
1.8
1.8
0
3.6
3.24
3.24
0
12.96
148.22389 89.6735203
0
237.897411
148.22389 89.6735203 25.6448117 263.542222
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Total
Hor Load On Pile in Long Dir HPL
0.000
0.000
50.298 T
19.44
51.84
889.343341 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
16.090 T
889.343341
Project
7.5
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
Loads From Superstructure
Dead Load of Girder + Slab
Superimposed Dead Load (SIDL)
Live Load (LL)
Walkway Live Load
Breaking and Tractive Force
Raking Force
Transverse Wind Force on Coach
Longitudinal Wind Force on Coach
Trans. Wind Force on Superstructure
Load from Substructure
Dead Load of Pedestals
Dead Load of Dirt Wall
Dead Load of Dirt Wall Bracket
Dead Load of Return Wall
Dead Load of Screen Wall
Dead Load of Pile Cap
Weight of Soil Above Pile Cap
V (T)
210.724
106.128
94.127
7.832
-2.330
0.000
0.000
-0.288
0.000
1.700
1.700
1.700
1.700
1.700
0.000
0.000
1.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.100
0.000
0.000
0.000
0.000
0.000
25.840
0.000
0.000
1.859
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
5.996
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
160.017
13.315
50.432
0.000
0.000
3.423
0.000
0.000
0.000
0.000
0.000
0.000
27.923
43.528
-0.604
31.743
1.504
20.254
3.713
4.971
2.854
267.300
174.992
1.700
0.690
0.407
-1.080
1.770
0.000
-1.080
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
-188.992
0.000
0.000
0.000
26.713
-15.335
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
0.000
52.269
1.318
0.000
0.000
44.024
0.000
Dead Load Surcharge on Dirt wall
3.347
-2.700
0.000
18.983
1.978
0.000
0.000
28.501
0.000
Live Load Surcharge on Dirt wall
2.237
-2.700
2.100
12.685
1.978
0.000
0.000
19.045
4.697
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
eL (m)
eT (m)
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
Earth Pressure on Pile cap
3.494
0.000
-5.500
0.000
0.000
19.813
0.820
0.000
-2.977
Dead+Live Load Surch. on Screen wall
0.463
0.000
-5.500
0.000
0.000
2.624
0.473
0.000
-1.305
Total without Seismic Effects
913.139
111.635
56.311
685.210
153.519
Long Seismic Case-Two Track Loded
19.925
166.394
38.746
333.035
114.173
Long Dyn. Inc. Case-Two Track Loded
8.143
35.999
4.482
74.143
5.641
Total with Seismic Effects
941.207
314.028
99.539
1092.388
273.332
Vertical Load V
Horizontal Load Longitudinal HL
Horizontal Load Transverse HT
Moment Longitudinal ML
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
941.207499 T
314.027578 T
99.539 T
1092.3881 Tm
273.332 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
VP max
276.996 T
VP min
36.739 T
eL
Pile Id
eT
eT2
V/n
ML.eL/eL2
MT.eT/eT2
Vp
1.8
-3.6
3.24
12.96
2
3
1.8
1.8
0
3.6
3.24
3.24
0
12.96
156.867916 101.147047
0
258.014963
156.867916 101.147047 18.9813984 276.996361
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Total
Hor Load On Pile in Long Dir HPL
eL2
52.338 T
19.44
51.84
941.207499 2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
16.590 T
941.207499
Project
7.6
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
Loads From Superstructure
Dead Load of Girder + Slab
Superimposed Dead Load (SIDL)
Live Load (LL)
Walkway Live Load
Breaking and Tractive Force
Raking Force
Transverse Wind Force on Coach
Longitudinal Wind Force on Coach
Trans. Wind Force on Superstructure
Load from Substructure
Dead Load of Pedestals
Dead Load of Dirt Wall
Dead Load of Dirt Wall Bracket
Dead Load of Return Wall
Dead Load of Screen Wall
V (T)
210.724
106.128
47.064
3.916
-1.226
0.000
0.000
-0.288
0.000
1.700
1.700
1.700
1.700
1.700
0.000
0.000
1.700
0.000
0.000
0.000
2.100
4.978
2.100
0.000
0.000
2.100
0.000
0.000
0.000
0.000
0.000
13.600
0.000
0.000
1.859
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
2.998
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
80.008
6.657
26.543
0.000
0.000
3.423
0.000
0.000
0.000
98.834
19.493
-2.575
13.962
43.528
-0.604
31.743
1.504
20.254
3.713
4.971
2.854
1.700
0.690
0.407
-1.080
1.770
0.000
0.000
0.000
5.373
-5.373
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
-5.369
5.051
0.000
0.000
0.000
26.713
-15.335
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
eL
File No.
Calc by
HB
Date
Sheet
eL2
eT2
-3.6
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
148.497539 64.9447557
0
213.442294
148.497539 64.9447557 43.2836566 256.725951
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
160.112737 T
1.8
192.262 T
701.403361 Tm
2
3
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
Pile Id
eT
890.985233 T
VP min
MGC
Checked by
SB
Date
Dead Load of Pile Cap
267.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Weight of Soil Above Pile Cap
174.992
-1.080
0.000
0.000
0.000
0.000
0.000
-188.992
0.000
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
0.000
52.269
1.318
0.000
0.000
44.024
0.000
Dead Load Surcharge on Dirt wall
3.347
-2.700
0.000
18.983
1.978
0.000
0.000
28.501
0.000
Live Load Surcharge on Dirt wall
2.237
-2.700
2.100
12.685
1.978
0.000
0.000
19.045
4.697
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
e
(m)
e
(m)
H
(T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
L
T
L
Earth Pressure on Pile cap
3.494
0.000
-5.500
0.000
0.000
19.813
0.820
0.000
-2.977
Dead+Live Load Surch. on Screen wall
0.463
0.000
-5.500
0.000
0.000
2.624
0.473
0.000
-1.305
Total without Seismic Effects
863.263
99.395
53.313
574.655
255.308
Trans Seismic Case-One Track Loded
23.030
49.918
124.010
108.325
348.569
Trans Dyn. Inc. Case-One Track Loded
4.692
10.800
14.939
18.423
19.408
Total with Seismic Effects
890.985
160.113
192.262
701.403
623.285
Vertical Load V
Horizontal Load Longitudinal HL
VP max
Discipline
623.285 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
256.726 T
40.269 T
Total
Hor Load On Pile in Long Dir HPL
26.685 T
V/n
ML.eL/eL2
MT.eT/eT2
19.44
51.84
890.985233 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
32.044 T
Vp
890.985233
Project
7.7
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Descrioption
Loads From Superstructure
Dead Load of Girder + Slab
Superimposed Dead Load (SIDL)
Live Load (LL)
Walkway Live Load
Breaking and Tractive Force
Raking Force
Transverse Wind Force on Coach
Longitudinal Wind Force on Coach
Trans. Wind Force on Superstructure
Load from Substructure
Dead Load of Pedestals
Dead Load of Dirt Wall
Dead Load of Dirt Wall Bracket
V (T)
210.724
106.128
94.127
7.832
-2.330
0.000
0.000
-0.288
0.000
1.700
1.700
1.700
1.700
1.700
0.000
0.000
1.700
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.100
0.000
0.000
0.000
0.000
0.000
25.840
0.000
0.000
1.859
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
5.996
6.710
0.000
8.505
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
160.017
13.315
50.432
0.000
0.000
3.423
0.000
0.000
0.000
0.000
0.000
0.000
27.923
43.528
-0.604
31.743
1.504
20.254
3.713
1.700
0.690
0.407
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.557
13.975
1.510
0.000
0.000
0.000
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Dead Load of Return Wall
4.971
-1.080
5.373
0.000
0.000
0.000
0.000
-5.369
26.713
Dead Load of Screen Wall
2.854
1.770
-5.373
0.000
0.000
0.000
0.000
5.051
-15.335
Dead Load of Pile Cap
267.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Weight of Soil Above Pile Cap
174.992
-1.080
0.000
0.000
0.000
0.000
0.000
-188.992
0.000
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
0.000
52.269
1.318
0.000
0.000
44.024
0.000
Dead Load Surcharge on Dirt wall
3.347
-2.700
0.000
18.983
1.978
0.000
0.000
28.501
0.000
Live Load Surcharge on Dirt wall
2.237
-2.700
2.100
12.685
1.978
0.000
0.000
19.045
4.697
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
eL (m)
eT (m)
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
Earth Pressure on Pile cap
Dead+Live Load Surch. on Screen wall
Total without Seismic Effects
Trans Seismic Case-Two Track Loded
Trans Dyn. Inc. Case-Two Track Loded
Total with Seismic Effects
3.494
0.463
913.139
24.059
4.979
942.178
0.000
0.000
-5.500
-5.500
eL
0.820
0.473
0.000
0.000
685.210
110.074
-0.370
794.914
3.24
12.96
1.8
1.8
0
3.6
3.24
3.24
0
12.96
157.029652 73.6031285
0
230.632781
157.029652 73.6031285 38.3403252 268.973106
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
1.8
200.404 T
794.913788 Tm
2
3
V/n
ML.eL/eL2
-2.977
-1.305
153.519
379.779
18.803
552.101
-3.6
173.984793 T
552.101 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
19.813
2.624
56.311
129.154
14.939
200.404
eT2
942.177914 T
Nr of Piles n
Vertical Load on Pile VP
0.000
0.000
eL2
Pile Id
eT
Vertical Load V
Horizontal Load Longitudinal HL
Moment Transverse MT
0.000
0.000
111.635
49.918
12.432
173.985
MT.eT/eT2
Vp
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
VP max
268.973 T
VP min
45.086 T
7.8
Total
Hor Load On Pile in Long Dir HPL
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
19.44
51.84
942.177914
Horizontal Force on Pile in Trans Dir HPT
28.997 T
Sheet
0
33.401 T
Descrioption
Loads From Superstructure
Dead Load of Girder + Slab
Superimposed Dead Load (SIDL)
Live Load (LL)
Walkway Live Load
Breaking and Tractive Force
Raking Force
Transverse Wind Force on Coach
Longitudinal Wind Force on Coach
Trans. Wind Force on Superstructure
Load from Substructure
V (T)
210.724
106.128
47.064
3.916
-1.226
0.000
0.000
-0.288
0.000
1.700
1.700
1.700
1.700
1.700
0.000
0.000
1.700
0.000
0.000
0.000
0.000
0.000
13.600
0.000
0.000
1.859
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
4.657
6.487
0.000
3.733
358.231
180.418
80.008
6.657
26.543
0.000
0.000
3.423
0.000
0.000
0.000
98.834
19.493
-2.575
13.962
43.528
-0.604
31.743
942.177914
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Dead Load of Pedestals
1.504
1.700
0.000
0.000
0.000
0.000
0.000
2.557
0.000
Dead Load of Dirt Wall
20.254
0.690
0.000
0.000
0.000
0.000
0.000
13.975
0.000
Dead Load of Dirt Wall Bracket
3.713
0.407
0.000
0.000
0.000
0.000
0.000
1.510
0.000
Dead Load of Return Wall
4.971
-1.080
5.373
0.000
0.000
0.000
0.000
-5.369
26.713
Dead Load of Screen Wall
2.854
1.770
-5.373
0.000
0.000
0.000
0.000
5.051
-15.335
Dead Load of Pile Cap
267.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Weight of Soil Above Pile Cap
174.992
-1.080
0.000
0.000
0.000
0.000
0.000
-188.992
0.000
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
0.000
52.269
1.318
0.000
0.000
44.024
0.000
Dead Load Surcharge on Dirt wall
3.347
-2.700
0.000
18.983
1.978
0.000
0.000
28.501
0.000
Live Load Surcharge on Dirt wall
2.237
-2.700
2.100
12.685
1.978
0.000
0.000
19.045
4.697
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
e
(m)
e
(m)
H
(T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
L
T
L
Earth Pressure on Pile cap
Dead+Live Load Surch. on Screen wall
Total without Seismic Effects
Vert Seismic Case-One Track Loded
Vert. Dyn. Inc. Case-One Track Loded
Total with Seismic Effects
3.494
0.463
863.263
80.902
2.740
946.906
0.000
0.000
-5.500
-5.500
eL
Pile Id
0.000
0.000
99.395
49.918
10.800
160.113
eT
Vertical Load V
Horizontal Load Longitudinal HL
946.905545 T
160.112737 T
1.8
94.998 T
731.460216 Tm
2
3
1.8
1.8
0.000
0.000
19.813
2.624
53.313
37.203
4.482
94.998
0.820
0.473
0.000
0.000
574.655
138.123
18.682
731.460
eL2
eT2
-3.6
3.24
12.96
0
3.6
3.24
3.24
0
12.96
157.817591 67.7277978
0
225.545389
157.817591 67.7277978 25.9522845 251.497673
V/n
ML.eL/eL2
-2.977
-1.305
255.308
112.160
6.245
373.713
MT.eT/eT2
Vp
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment Transverse MT
Nr of Piles n
Vertical Load on Pile VP
VP max
VP min
7.9
373.713 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
251.498 T
64.138 T
Discipline
Total
Hor Load On Pile in Long Dir HPL
19.44
51.84
946.905545 -2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
15.833 T
26.685 T
Descrioption
Loads From Superstructure
Dead Load of Girder + Slab
Superimposed Dead Load (SIDL)
Live Load (LL)
Walkway Live Load
Breaking and Tractive Force
Raking Force
Transverse Wind Force on Coach
V (T)
210.724
106.128
94.127
7.832
-2.330
0.000
0.000
1.700
1.700
1.700
1.700
1.700
0.000
0.000
0.000
0.000
0.000
0.000
25.840
0.000
0.000
0.000
0.000
0.000
0.000
2.105
0.000
0.000
0.000
0.000
0.000
0.000
0.000
4.657
6.487
358.231
180.418
160.017
13.315
50.432
0.000
0.000
0.000
0.000
0.000
0.000
0.000
27.923
43.528
946.905545
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Sheet
Checked by
SB
Date
Longitudinal Wind Force on Coach
-0.288
1.700
2.100
1.859
2.105
0.000
0.000
3.423
-0.604
Trans. Wind Force on Superstructure
0.000
0.000
0.000
0.000
0.000
8.505
3.733
0.000
31.743
Load from Substructure
Dead Load of Pedestals
1.504
1.700
0.000
0.000
0.000
0.000
0.000
2.557
0.000
Dead Load of Dirt Wall
20.254
0.690
0.000
0.000
0.000
0.000
0.000
13.975
0.000
Dead Load of Dirt Wall Bracket
3.713
0.407
0.000
0.000
0.000
0.000
0.000
1.510
0.000
Dead Load of Return Wall
4.971
-1.080
5.373
0.000
0.000
0.000
0.000
-5.369
26.713
Dead Load of Screen Wall
2.854
1.770
-5.373
0.000
0.000
0.000
0.000
5.051
-15.335
Dead Load of Pile Cap
267.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Weight of Soil Above Pile Cap
174.992
-1.080
0.000
0.000
0.000
0.000
0.000
-188.992
0.000
Earth Pressure in Longitudinal Direction (Behind Dirt Wall)
Earth Pressure on Dirt wall
9.216
-2.700
0.000
52.269
1.318
0.000
0.000
44.024
0.000
Dead Load Surcharge on Dirt wall
3.347
-2.700
0.000
18.983
1.978
0.000
0.000
28.501
0.000
Live Load Surcharge on Dirt wall
2.237
-2.700
2.100
12.685
1.978
0.000
0.000
19.045
4.697
Earth Pressure in Transverse Direction (Behind Return Wall)
0.000
0.000
Earth Pressure on Return wall
1.044
-1.080
5.200
0.000
0.000
4.773
2.518
-1.127
17.446
Dead Load Surcharge on Return wall
0.696
-1.080
5.200
0.000
0.000
3.181
2.878
-0.751
12.771
Live Load Surcharge on Return wall
0.165
-1.080
5.200
0.000
0.000
0.754
2.044
-0.178
2.400
Earth Pressure in Transverse Direction (On Screen Wall)
Earth Pressure on Screen wall
0.697
1.620
-5.500
0.000
0.000
3.955
2.618
1.130
6.519
Vertical Reaction & Eccn
Hor Force Long & Height Hor ForceTrans & Height Mom ent at Pile Cap Base
Descrioption
eL (m)
eT (m)
HL (T)
ev (m)
HT (T)
ev (m)
ML (T.m)
MT (T.m)
V (T)
Earth Pressure on Pile cap
Dead+Live Load Surch. on Screen wall
Total without Seismic Effects
Vert Seismic Case-Two Track Loded
Vert Dyn. Inc. Case-Two Track Loded
Total with Seismic Effects
Vertical Load V
Horizontal Load Longitudinal HL
1000.49883 T
173.984793 T
3.494
0.463
913.139
84.331
3.028
1000.499
0.000
0.000
-5.500
-5.500
eL
Pile Id
1
0.000
0.000
111.635
49.918
12.432
173.985
eT
1.8
-3.6
0.000
0.000
19.813
2.624
56.311
38.746
4.482
99.539
eL2
eT2
3.24
12.96
0.820
0.473
V/n
0.000
0.000
685.210
143.953
22.165
851.328
ML.eL/eL2
-2.977
-1.305
153.519
114.969
5.641
274.129
MT.eT/eT2
Vp
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
99.539 T
851.327946 Tm
274.129 Tm
6
2
= V / n + ML.eL/eL + MT.eT/eT2
264.613 T
VP min
68.886 T
7.10
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
2
3
1.8
1.8
0
3.6
3.24
3.24
0
12.96
166.749805 78.8266617
0
245.576467
166.749805 78.8266617 19.0367067 264.613173
4
5
-1.8
-1.8
-3.6
0
3.24
3.24
12.96
0
-1.8
3.6
3.24
12.96
Total
Hor Load On Pile in Long Dir HPL
19.44
51.84
1000.49883 2.842E-014
0
Horizontal Force on Pile in Trans Dir HPT
16.590 T
28.997 T
Case no
7.4
7.5
7.6
7.7
7.8
7.9
Sheet
VP max
VP min
Description
Long Seismic Case One - Track Loaded Condiition
263.542
Long Seismic Case Two - Track Loaded Condiition
276.996
Trans Seismic Case One - Track Loaded Condiition
256.726
Trans Seismic Case Two - Track Loaded Condiition
268.973
Vert Seismic Case One - Track Loaded Condiition
251.498
Vert Seismic Case Two - Track Loaded Condiition
264.613
HPL
32.906
36.739
40.269
45.086
64.138
68.886
50.298
52.338
26.685
28.997
26.685
28.997
HPT
16.0901303
16.589797
32.0436453
33.4006706
15.833
16.590
Hp
52.809
54.904
41.700
44.232
31.029
33.408
1000.49883
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Max (Min in case of VP min)
7.11
276.996
276.996 T
32.906 T
54.904 T
32.906
<
>
>
HL (T)
HT (T)
Description
1 One Track Loaded without LWR Forces
112.995
56.311
2 Two Track Loaded without LWR Forces
152.018
62.307
Max
152.018
62.307
Description
1 One Track Loaded with LWR Forces
2 Two Track Loaded with LWR Forces
Max
HL (T)
HT (T)
142.975
56.311
181.998
62.307
181.998
62.307
C Seismic Case
Case no
7.4
7.5
7.6
7.7
7.8
7.9
HL (T)
HT (T)
Description
Long Seismic Case One - Track Loaded Condiition
301.788
96.541
Long Seismic Case Two - Track Loaded Condiition
314.028
99.539
Trans Seismic Case One - Track Loaded Condiition
160.113
192.262
Trans Seismic Case Two - Track Loaded Condiition
173.985
200.404
Vert Seismic Case One - Track Loaded Condiition
160.113
94.998
Vert Seismic Case Two - Track Loaded Condiition
173.985
99.539
314.028
200.404
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
52.338 33.4006706
355 T
0 T
13.9 T
Sheet
54.904
OK
OK (NO TENSION)
NOT OK
The Pile Cannot Take the Horizontal Forces in the system for 5 mm deflection
We Provide Shear Key in Longitudinal and Transverse Direction to Take This load
However The Piles will be designed for Moment Due to these Forces
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
8.0
DESIGN OF PILE
8.1
Data
Dia Of Pile
Length Of Pile
Free Length L1
Length of Fixity
Moment Reduction Factor
8.2
Discipline
1.2
25
0
10.9
0.83
Grade Of Concrete
Fck
Modulus of Elasticity
M35
Reinforcement Grade
fy
Fe-500
m
m
m
m
35 Mpa
29500
500 Mpa
Minimum Reinf
Crossectional Area of Pile
Minimum Reinforcement Percentage
Min Reinf
Provide
17
nos
Provide
16
nos
Ast
32
32
1.131 m2
0.40 %
45.239 cm2
dia Reinforcement.
dia Reinforcement.
265.402 cm2
> min. rein, Hense OK
MGC
File No.
HB
Date
SB
Date
Sheet
Project
8.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
Stress Check - Normal Case Without LWR Forces
Dia. of section
Radius of section
Modular ratio
=
=
=
Vertical Load
=
=
=
=
Horizontal Load
Bending Moment
Effective Cover
Ast.provided
N.A.assumed
Ar
C
c.g.
Ixx
Aeff.
e
e'
e - e'
Ieff
Dist. Of N.A.
Stress in Con. =
=
=
=
=
=
=
=
=
=
=
=
=
=
=
120 cm
60 cm
10
61.74 T
27.382 T
123.86 tm
10.1 cm
265.40
43.57
148.16
2.59
3704.74
115.40
34.56
488903.65
6093.35
200.62
21.02
179.60
5197820
4.75
16.27
Stress in R/f. =
Perm. Stress in Con. =
93
-1412
117
kg/cm2
kg/cm2
kg/cm2
-2400
kg/cm2
cm2
cm
deg
rad
cm2
cm
cm
cm4
cm2
-16415
(Min e=30)
16.43
MGC
File No.
HB
Date
SB
Date
Sheet
Project
8.3
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
=
=
=
Vertical Load
=
=
=
=
Horizontal Load
Bending Moment
Effective Cover
Ast.provided
N.A.assumed
Ar
C
c.g.
Ixx
Aeff.
e
e'
e - e'
Ieff
Dist. Of N.A.
=
=
=
=
=
=
=
=
=
=
=
=
=
=
120 cm
60 cm
10
55.87 T
32.061 T
145.03 tm
10.1 cm
265.40
42.46
145.95
2.55
3577.44
114.74
35.19
448275.88
5966.05
259.57
21.10
238.47
5195724
3.65
17.45
Stress in Con. =
Stress in R/f. =
Perm. Stress in Con. =
109
-1727
135
kg/cm2
kg/cm2
kg/cm2
-2760
kg/cm2
cm
cm
deg
rad
cm2
cm
cm
cm4
cm2
2
-8793
(Min e=30)
17.54
MGC
File No.
HB
Date
SB
Date
Sheet
Project
8.4
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
=
=
=
Vertical Load
=
=
=
=
Horizontal Load
Bending Moment
Effective Cover
Ast.provided
N.A.assumed
Ar
C
c.g.
Ixx
Aeff.
e
e'
e - e'
Ieff
Dist. Of N.A.
=
=
=
=
=
=
=
=
=
=
=
=
=
=
120 cm
60 cm
10
276.00 T
54.904 T
248.36 tm
10.1 cm
265.40
50.80
162.29
2.83
4550.93
118.57
30.52
817949.55
6939.55
89.99
20.02
69.97
5251259
10.82
9.20
Stress in Con. =
Stress in R/f. =
Perm. Stress in Con. =
187
-2173
176
kg/cm2
kg/cm2
kg/cm2
-3600
kg/cm2
cm2
cm
deg
rad
cm2
cm
cm
cm4
cm2
(Min e=30)
9.20
MGC
File No.
HB
Date
SB
Date
Sheet
Project
Discipline
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile, Calc by
Pile Cap)
Checked by
MGC
File No.
HB
Date
SB
Date
Sheet
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
10.0
10.1
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
Cos ( + )
Sin ( + ) . Sin ( + )
2
Cos .Cos ( ) 1
Cos ( ) . Cos ( )
Ka
10.2
10.3
=
=
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
rad
rad
rad
rad
2.4
1.7m
4.143
2 T/m3
MGC
Kp=
Discipline
Calculations
for
19.888
262.519
0.800
258.531
45.586
T/m^2
T
m
T
T
181.99802577 T
258.531 T
Shear Key Design Page 302 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Factor of safety against slifing
10.4
1.42 >1.5
Discipline
MGC
File No.
Calc by
HB
Date
SB
Date
Checked by
Hense Ok
Sheet
11.000m
1.700m
413.64991 T
M35
Fe 500
2.4
37.60 t-m/m
Permissible stresses:
st =
bc =
###
1167t/m^2
t/m3
st/bc
=
10
m/(m+r)
=
1-k/3
=
0.5*cbc*k*j =
deff reqd
=
=
20.57
0.327
0.891
###
sqrt(37.60/(170.01*1.0))
0.470 m
470.3 mm
Project
MGC
File No.
Calc by
HB
Date
Checked by
Thus O.K
SB
Date
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
deff provd
{(1.7*1000)-75-12-20/2}
20 f
mm
12
mm
75
mm
Provide
Rein.provided
@
@
=
200
200
@
@
1097 mm2
10.97 cm2/m
c/c
(In One Layers at bottom in long directions)
c/c
0.06%
>
10.97 o.k.
of Cross-sectional area.
(0.0006*1.7*1.0*1000000)
1020 mm2
10.2 cm2
100
200
0.001097 m2
31.4 cm2/m
Provide
###
Sheet
c/c
c/c (In One Layers at top in long directions)
Shear Key Design Page 304 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Rein.provided
11.3 cm2/m
>
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
10.20 o.k.
Shear Force
258.53
23.50
% of steel,
100*As/bd
0.213 Mpa
21.71 t/m2
T/m
100*(100*31.42)/(1000*1603)
0.196 %
(21.71*1.0*1,603)/1000=
34.79
t/m
o.k.
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Project
11.0
11.1
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
rad
rad
rad
rad
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
###
2
Cos ( )
Ka=
Cos . Cos ( + ) 1+
=
=
Sin ( + ) . Sin ( )
Cos ( + ) . Cos ( )
0.308
2 T/m3
2
Ka
Sheet
Calculations
for
11.1.1
1.329
15.758
0.718
15.518
2.736
Moment at base
11.147 Tm
P
T/m^2
T
m
T
T
Project
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Parapet Height
Parapet Thk
Weight of unit width
Nr
Weight of Both
2.1
0.3
1.575
2
3.15
m
m
T/m
###
T/m
F
Weight of Rail + Pads
Weight of Cables
Weight of Cable Through Cells
Weight of Hand Rails
Weight of Track Plinths
Weight of Misc (OCS, Signalling)
0.3
0.1
0.7
0.1
2.8
0.4
T/m
T/m
T/m
T/m
T/m
T/m
h
2
11.1.2
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
P
All the above weight are for unit length Perpendicular to abutment
Total Weight
Weight per Sqm
= 15.800 / 11.000 =
Height
h=
Width
=
Pressure For Surcharge
Force F
This force act at Height
Horizontal Component
Vertical Component
= 1.436 x 0.308 =
= 0.443 x 2.155 x 11.000 =
H
= 2.155 / 2 =
15.8 T/m
1.436 T/m^2
2.155
11
0.443
10.503
1.078
10.343
1.824
Calculations
for
m
m
T/m^2
T
m
T
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment at base
11.1.3
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
11.145 Tm
2.267
13.7 T/m
25 T
Track Slab
0.3
0.3
0.3
2.867
2.100
Since Method given in IRS Sub structure Code Clause 5.8.2 is for the case when track
centreline and abutment centreline concide.
In our case the track centre line of Indivisual track is eccentric to abutment centreline hence
the method given in Clause 5.8.2 is not applicable
6.1665
6.1665
1.4335 1.4335
2.867
1.9665
1.9665
Hence we analize below the effects following the same fundamental principles of Clause 5.8.2.
2.155
A. One Track Loded Condition
Height
LL Surcharge at top
Distribution length at Formation Level
Distribution length at Bottom of Pile Cap Level = B+h
Pressure at Bottom P1
Pressure at Top P2
h
S
B
2.155
9.316
2.867
5.022
m
T/m
m
m
1.002 T/m^2
0.572 T/m^2
B+
Strip Thk dx
x
1.0775
5.022
2.867
1.0775
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
SB
5.500
Date
Checked by
5.500
Px = P2 + (P1-P2)*x/h
Pressure at any height x from base
Width of strip of thickness dx at height x W=B+h-x
Fdx = Px.(B+h-x)dx
Force at This section on strip thk dx
11.000
F=
###
Sheet
0.1995869217 x2dx
P1
0.1995869217 h3/3
6.52565975 T
Px
Let the force act at a height H from base This height is calculated below
###
Calculations
for
Mdx = Fdxx
Mdx =
2.874 xdx +
0.43010982 x2dx Integrating This in range 0 To h we get Total Moment M
M=
2.874 h2/2 +
0.43010982 h3/3 -
0.1995869217 x3dx
0.1995869217 h4/4
M=
7.03139838 Tm
H=M/F
1.0775 m
Horizontal Component
Vertical Component
For Two Track Loaded
Horizontal Component
Vertical Component
Moment at base
H
6.427 T
1.133 T
P2
12.85 T
2.27 T
13.849 Tm
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Total Moment at Base due to earth Pressure
Total Moment at Base due to earth Pressure per m width
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
36.142 Tm
3.286 Tm/m width
0.1
30
10
0
0
degrees
degrees
degrees
degrees
0.524
0.175
0.000
0.000
7.765 degrees
9.462 degrees
rad
rad
rad
rad
###
11.2
Discipline
0.136 rad
0.165 rad
( 1 v ) Cos 2 ( )
Ca=
Sin ( + ) . Sin ( )
Cos . Cos . .Cos ( ++ ) 1+
Cos ( ) .Cos ( ++ )
2
Ca=
Calculations
for
0.441
11.2.1
P
2
Ca=
0.383
Max of two Ca=
0.441
Ca-Ka
=
0.132
=
2 T/m3
Dyn. Inc. of Earth Pres. on Dirt wall
h
=
2.155 m
width
=
11 m
= h(Ca- Ka)
Pressure Intensity at dirt wall base P
= 2.000 x 2.155 x 0.132 =
Force on Dirt Wall F
= 0.500 x 0.570 x 2.155 x 11.000 =
This force act at Height
H
= 2.155 / 2 =
Horizontal Component
Vertical Component
0.570
6.758
1.078
6.656
1.174
T/m^2
T
m
T
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Moment at Base
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
7.171 Tm
0.300 m
11 m
8.25 T/m
Parapet Height
Parapet Thk
Weight of unit width
Nr
Weight of Both
2.1
0.3
1.575
2
3.15
m
m
T/m
0.3
0.1
0.7
0.1
2.8
0.4
T/m
T/m
T/m
T/m
T/m
T/m
###
T/m
15.8 T/m
1.436 T/m^2
h
2
11.2.2
Discipline
Calculations
for
H
Height
h=
Width
=
Pressure For Surcharge
Force F
= 1.436 x 0.132 =
= 0.190 x 2.155 x 11.000 =
2.155
11
0.190
4.505
m
m
T/m^2
T
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
This force act at Height
Horizontal Component
Vertical Component
= 2.155 * 0.66 =
Moment at base
11.2.3
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
1.422 m
4.436 T
0.782 T
6.309 Tm
2.267
13.7 T/m
25 T
Track Slab
0
2.267
0.000
Since Method given in IRS Sub structure Code Clause 5.8.2 is for the case when track
centreline and abutment centreline concide.
In our case the track centre line of Indivisual track is eccentric to abutment centreline hence
the method given in Clause 5.8.2 is not applicable
-1.1335
-1.1335
1.1335 1.1335
2.267
-1.1335
-1.1335
Hence we analize below the effects following the same fundamental principles of Clause 5.8.2.
2.155
A. One Track Loded Condition
Height
LL Surcharge at top
Distribution length at Formation Level
h
S
B
2.155 m
9.316 T/m
2.267 m
B+
Strip Thk dx
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Distribution length at Bottom of Pile Cap Level = B+h
Pressure at Bottom P1
Pressure at Top P2
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
4.422 m
Sheet
0.544 T/m^2
0.279 T/m^2
4.422
2.267
1.0775
1.0775
0.000
0.000
Px = P2 + (P1-P2)*x/h
0.000
###
0.1229430858 x2dx
P1
0.1229430858 h3/3
2.86102717 T
Px
Let the force act at a height H from base This height is calculated below
###
Calculations
for
Mdx = Fdxx
Mdx =
1.232 xdx +
0.26494235 x2dx Integrating This in range 0 To h we get Total Moment M
M=
1.232 h2/2 +
0.26494235 h3/3 M=
3.08275678 Tm
Hcal=M/F
1.0775 m
Horizontal Component
Vertical Component
Two Track Loded Condition
0.1229430858 x3dx
0.1229430858 h4/4
1.32
1.422
2.818 T
0.497 T
H
P2
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Horizontal Component
Vertical Component
Moment at Base
11.3
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
5.635 T
0.994 T
8.015 Tm
21.496 Tm
1.954 Tm/m width
11.4
3.4 T
3.06 T
6.46 T
13.92 Tm
1.266 Tm/m width
Seismic Case
For seismic case LL surcharge and Breaking and Tractive to be taken as 50%
Earth Pressure
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Dynamic Increment
Braking and Tractive
Total for Normal Case
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Design Moment
Design Shear
10.4
Discipline
11.000m
0.300m
M35
Fe 500
2.4
4.60 t-m/m
Permissible stresses:
st =
bc =
###
1167t/m^2
t/m3
st/bc
10
m/(m+r)
20.57
0.327
Dirt Wall Page 321 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
1-k/3
=
0.5*cbc*k*j =
deff reqd
Rein.provided
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
sqrt(4.60/(170.01*1.0))
0.164 m
164.5 mm
{(0.3*1000)-50-10-16/2}
###
16 f
mm
10
mm
50
mm
Provide
MGC
0.891
###
=
deff provd
Discipline
@
@
=
300
300
0.000927 m2
927 mm2
9.27 cm2/m
c/c
c/c
13.4 cm2/m
=
Thus O.K
0.06%
>
9.27 o.k.
of Cross-sectional area.
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
=
Provide
Rein.provided
@
@
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
(0.0006*0.3*1.0*1000000)
180 mm2
1.8 cm2
150
200
c/c
c/c
7.5 cm2/m
Discipline
>
1.80 o.k.
100*As/bd
=
=
T/m
100*(100*13.40)/(1000*232)
=
(As Per Table 12B of IRC-21,2000)
Permissible Shear Stress , c
=
4.49
0.578 %
0.335 Mpa
Dirt Wall Page 323 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
=
Shear carried by concrete, Vc
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
34.17 t/m2
(34.17*1.0*232)/1000=
7.93
t/m
o.k.
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Project
12.0
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
ka = 0.325
b = 2.455
Calculations
for
Q1=ka*SHt
= 2.00
1.20 m
Q2=ka**b
The end return wall has been designed as a plate fixed on its two faces i.e. at the base and on one of its vertical sides.
( Refer Table 26 of Formula of Stress & Strain by Roark & Young ).
S.NO.
1
Height of Length of
return wall return wall
(m) "b"
(m) "a"
2.455
3.24
"a/b"
1.320
Q1 (t/m2)
0.779
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
"a/b"
1.320
12.1
Q2
(t/m2)
1.594
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
-2.50 tm/m
-2.02 tm/m
Depth
0.300m
M35
Fe 500
2.4
2.50 t-m/m
Permissible stresses:
st =
bc =
###
1167t/m^2
t/m3
Project
r=
m=
k=
j =
q =
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
st/bc
=
10
m/(m+r)
=
1-k/3
=
0.5*cbc*k*j =
deff reqd
=
=
deff provd
Rein.provided
Calc by
HB
Date
Checked by
SB
Date
Sheet
sqrt(2.50/(170.01*1.0))
0.121 m
121.3 mm
{(0.3*1000)-50-10-16/2}
###
16 f
mm
10
mm
50
mm
File No.
0.327
0.891
###
@
@
MGC
20.57
Provide
Discipline
300
300
Thus O.K
0.000504 m2
504 mm2
5.04 cm2/m
c/c
c/c
13.4 cm2/m
>
5.04 o.k.
Return Wall Page 340 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
0.06%
Provide
Rein.provided
12.1
@
@
=
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
of Cross-sectional area.
(0.0006*0.3*1.0*1000000)
180 mm2
1.8 cm2
150
200
c/c
c/c
7.5 cm2/m
>
1.80 o.k.
Depth
0.300m
M35
Fe 500
2.4
2.02 t-m/m
Permissible stresses:
st =
bc =
###
1167t/m^2
t/m3
Return Wall Page 341 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
st/bc
=
10
m/(m+r)
=
1-k/3
=
0.5*cbc*k*j =
deff reqd
=
=
deff provd
20.57
0.327
0.891
###
sqrt(2.02/(170.01*1.0))
0.109 m
109.0 mm
{(0.3*1000)-50-10-16/2}
16 f
mm
10
mm
50
mm
Provide
###
@
@
300
300
Thus O.K
0.000403 m2
403 mm2
4.03 cm2/m
c/c
c/c
Return Wall Page 342 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Rein.provided
13.4 cm2/m
=
0.06%
Provide
Rein.provided
@
@
=
>
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
4.03 o.k.
of Cross-sectional area.
(0.0006*0.3*1.0*1000000)
180 mm2
1.8 cm2
150
200
c/c
c/c
7.5 cm2/m
>
1.80 o.k.
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Project
12.0
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
ka = 0.308
b = 2.455
Calculations
for
Q1=ka*SHt
= 2.00
1.20 m
Q2=ka**b
The end return wall has been designed as a plate fixed on its two faces i.e. at the base and on one of its vertical sides.
( Refer Table 26 of Formula of Stress & Strain by Roark & Young ).
S.NO.
1
Height of Length of
return wall return wall
(m) "b"
(m) "a"
2.455
1.86
"a/b"
0.758
Q1 (t/m2)
0.740
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
"a/b"
0.758
12.1
Q2
(t/m2)
1.515
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
-0.97 tm/m
-0.77 tm/m
Depth
0.300m
M35
Fe 500
2.4
0.97 t-m/m
Permissible stresses:
st =
bc =
###
1167t/m^2
t/m3
Project
r=
m=
k=
j =
q =
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
st/bc
=
10
m/(m+r)
=
1-k/3
=
0.5*cbc*k*j =
deff reqd
=
=
deff provd
Rein.provided
Calc by
HB
Date
Checked by
SB
Date
Sheet
sqrt(0.97/(170.01*1.0))
0.076 m
75.5 mm
{(0.3*1000)-50-10-16/2}
###
16 f
mm
10
mm
50
mm
File No.
0.327
0.891
###
@
@
MGC
20.57
Provide
Discipline
300
300
Thus O.K
0.000202 m2
202 mm2
2.02 cm2/m
c/c
c/c
13.4 cm2/m
>
2.02 o.k.
Screen Wall Page 354 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
0.06%
Provide
Rein.provided
12.1
@
@
=
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
of Cross-sectional area.
(0.0006*0.3*1.0*1000000)
180 mm2
1.8 cm2
150
200
c/c
c/c
7.5 cm2/m
>
1.80 o.k.
Depth
0.300m
M35
Fe 500
2.4
0.77 t-m/m
Permissible stresses:
st =
bc =
###
1167t/m^2
t/m3
Screen Wall Page 355 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
st/bc
=
10
m/(m+r)
=
1-k/3
=
0.5*cbc*k*j =
deff reqd
=
=
deff provd
20.57
0.327
0.891
###
sqrt(0.77/(170.01*1.0))
0.067 m
67.3 mm
{(0.3*1000)-50-10-16/2}
16 f
mm
10
mm
50
mm
Provide
###
@
@
300
300
Thus O.K
0.000161 m2
161 mm2
1.61 cm2/m
c/c
c/c
Screen Wall Page 356 of 365
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)
Rein.provided
13.4 cm2/m
=
0.06%
Provide
Rein.provided
@
@
=
>
Discipline
MGC
File No.
Calc by
HB
Date
Checked by
SB
Date
Sheet
1.61 o.k.
of Cross-sectional area.
(0.0006*0.3*1.0*1000000)
180 mm2
1.8 cm2
150
200
c/c
c/c
7.5 cm2/m
>
1.80 o.k.
Project
Design of Substructure (Dirt Wall, Pedestals, Return Wall) and Pile Foundation (Pile,
Pile Cap)