Distance from
bank (m)
0
2
4
6
8
10
12
15
0
1
1.4
2.1
3.2
2.2
1.3
0
0
23
35
48
60
50
25
36
48
42
28
-SolutionV = a + bN
where a = 0.05
b = 0.8
q = V.A
A2=2.8 m2
CE374-Final Project
Page 1
V3=0.61 m/s,
A3=4.2 m2
V4=0.77 m/s,
A4=6.4 m2
Q= q = 13.48 m3/s
-Solution-
CE374-Final Project
Page 2
A:
B:
i2 = (2 + 2 + 3) / 3 = 2.33 mm/hr
i3 = (0 + 3 + 0) / 3 = 0 mm/hr
C:
CE374-Final Project
Page 3
-SolutionQ = 0.278.C.I.A
CE374-Final Project
Page 4
= 60 m3
= 56 m3
= 55 m3
Page 5
-Solution0.27
0.265
0.32
0.295
0.275
0.26
0.25
0.28
0.26
0.245
0.22
0.277
0.26
5
18.9
74.1
89.1
121.5 52.5
24.75
22.943
14.56
4.158 19.6365
36.45
6.435
25
875
Q=105.0525 m3/s
90/75 90/84 90/70 = 1.653 > 1.1
0.22
0.265
0.2575
0.3
0.2
d Veloc
0.2 0.6 ity at
05
d depth
0.8 (m/s)
d
0.2
V mean
05
(m/s)
4.2 Area (m2)
0.8
Qi (m3/s)
61
So, we cannot use Arithmetic Method and we will apply Normal Ratio
Method.
Pest = 1/3 ((8.590/75) + (6.790/84) + (990/70)) = 9.67 cm / month
CE374-Final Project
Page 6
-Solution-
Sample of calculation:
V1= 0.05+0.3*(12/60) = 0.11 m/s
V1= 0.05+0.3*(50/60) = 0.3 m/s
at depth 0.6 m
V2 =0.05+0.3*(38/60)=0.24 m/s
at depth 0.2 m
at depth 0.2 m
at depth 0.8 m
at depth 0.8 m
CE374-Final Project
Page 7
1.8 t +32
100
p,
F=
(1.820)+32
9.70 = 6.6
100
CE374-Final Project
Page 8
Alfaalfa
Sugar
beet
Beans
Citrus
k1
0.85
0.70
0.65
0.8
k2
1.14
2.42
0.37
0.98
0.969
1.694
0.240
0.784
6.6
U mm/month
162.44
283.98
40.233
131.429
% area
60
20
15
UC
97.464
14.199
8.04
19.714
UC(mm/month)
139.417
Center: (100,100).
CE374-Final Project
-Solution-
5
(100,70)
102.2
(130,100 (100,140
(70,100)
)
)
146.4
CE374-Final Project
95.3
135.2
Page 10
1
(30,80)
85.0
station
coordinat
es
Precipitati
on
Weighted
P(cm)
(col. 4*col.5)
---36.86
19.53
39.91
25.54
121.84
Rainfall
85.0
135.2
95.3
146.4
102.2
----
Fraction
of total
area
---0.2726
0.2049
0.2726
02499
1.000
area
(km2)
---2141
1609
2141
1963
7854
Boundary
of area
station
---abcd
dce
ecbf
fba
----
1
2
3
4
5
Total
Problem 9: At the beginning of July the surface area of the lake was 3.2
km2 and the volume of the water in the lake was 18.8 x 106 m3. During
July, the average inflow is 0.68 m3/s while the pumped outflow for
irrigation is 1.1 m3/s. At the end of July, the surface area of 2.9 km2 and
the volume of 16.2 x 106 m3
are measured. Considering the seepage loss of 37 mm through the bottom
of this lake, calculate the
total evaporation height from the lake surface in mm for zero precipitation
during July.
-SolutionJuly 31 day
A1=3.2Km2
I=0.86m3/sec
V1=18.8*10^6m2
A2=2.9km2
V2=16.2*10^6m2
s = I (t) - Q(t)
t
V2 V1 = 16,2*10^6 -18,8 *10^6
CE374-Final Project
Page 11
O=1.1m3/sec
86400 sec
I = 0,68 m3/sec * 1 day
* 31 day = 1,821,312 m3
1m
1000
(2.9+2.3)
* 106 m2 = 115,900 m3
2
Problem 10: The isohyetal maps of two storms of equal duration are given
below for a particular basin. Determine
(a) Areal mean precipitation depth and
(b) the depth-area curve for this basin for the specific storm duration of 90
minutes using the data given below table.
CE374-Final Project
Page 12
storm 1
80
70
60
50
d(mm)
40
30
20
10
0
0
10
20
30
40
50
60
Area(Km^2)
CE374-Final Project
Page 13
70
80
90
100
Acc.prec
.vol
(mm.km)
Precip.vol.
Betw.isoh.
(mm.km2)
Acc.
Area
(KM2)
Area
bet
Mean
Depth
(mm)
Isohyet
Limits
(mm)
74
222
222
74
>70
66.8
1002
780
15
12
65
70-60
60.9
1827
30
15
55
60-50
54.9
2637
810
48
18
45
50-40
48.7
3407
770
70
22
35
40-30
43.4
3907
500
90
20
25
30-20
42.3
3979
72
94
18
<20
825
Pmin=14mm)
CE374-Final Project
Page 14
storm2
80
70
60
50
d(mm)
40
30
20
10
0
0
10
20
30
40
50
60
70
80
90
100
Area(Km^2)
Isohyet
Limits
(mm)
Mean
Depth
(mm)
Area
bet
Acc.
Area
(KM2)
>70
70-60
60-50
50-40
40-30
30-20
<20
75
65
55
45
35
25
17
6
14
16
14
15
16
13
6
20
36
50
65
81
94
CE374-Final Project
Precip.vol Acc.prec
.
.vol
Betw.isoh. (mm.km)
(mm.km2)
450
450
910
1360
880
2240
630
2870
325
3395
400
3795
221
4016
Page 15
P Mean
75
68
62.2
57.4
52.2
46.9
42.7