Design Stages
Design Stages
RIBA Stage
Inception
Feasibility
Outline Proposals
B
Budget
C
Cost Plan
Definition
Techniques
Used
Preliminary Estimate:
Unit, Cube, Superficial.
Production
Information /
Working
Drawings
D
E
F
Cost Plan / Cost Plan Updation / Cost Checking
Detail
Design
Bills of
Quantities
Tender Action
Elemental Estimating.
Objectives
From Client
From Designer /
Architect
From Structural
Engineer
From Services
Engineer
Prepare cost
Bid evaluation.
analysis.
Information Requirements
Page 1 of 2
Bills of
Quantities
Tender Action
Inception
Feasibility
Outline Proposals
B
Budget
C
Cost Plan
From QS to
Client (in report
format)
From QS to
Design Team
From QS to
Other
Consultants
Such quantity and quality parameters as relate to Such quantity and quality parameters as relate to
their area of design.
their area of design.
RIBA Stage
Methods of
Preparation
Quantity
Quality
Notes:
1
Cost checking is the process of calculating the costs of specific design proposals and comparing them with the cost plan during the whole design prcess ( Design Stages D-F). The objectives of cost checking are:- 1. To confirm that as the design develops, the cost remains
within the budget 2. To reduce the abortive design work and lost time causde through proceeding too far in the design process before realisation that the budget will gbe exceeded. 1. The methods will vary according to the stage reached in the design process. Normally, however,
this takes the form of measurement of approximate quantities from the consultant's drawings to provide a check on the quantity and quality of parameters set down in the appropriate cost plan. The GFA should always be the first check at any stage.
Controlling Changes to the Cost Plan - Should a change be propose to the outline cost plan, or to the scope of the work, the following procedures should be implemented: 1. All relevant members of the design team should be informed 2. The designer should confirm his
agreement, in principle, to the proposal 3. No proposal should be incorporated into the cost plan without the agreement of the quantity surveyor, and his confirmation or otherwise that the proposal can be met within the elemental target 4. Where the proposal involved additional
cost over the elemental target, or would cause the total budget to be exceeded, the quantity surveyor should identify to the design team alternative savings that are available in order to maintain the overall budget 5. The QS should take into account, when considering a proposed
change, any likely effect on the design & construction programme 6. In all considerations of alternative proposals, the use of consultants for additional work should take into account any consequential addition to professional fees. In particular, this applies to consulting engineers,
whose fees are calculated only on specific parts of the project 7. Upon the determination of a proposed change, the QS should communicate to the client and all members of the design team, the effects of such change and provide an updated cost plan.
Inflation - 1. The prediction of future inflation may not be necessary for some clients, and a statement of cost at current prices may be adequate. Where an assessment of inflation is required, a range of probable inflation is best provided. This can be calculated using predictions
published. The assumptions upon which the prediction is made should be stated. 2. Some clients, particularly in the public sector, have their own inflation controls. Where a client requies that a particular level of inflation be included in the budget, the quantity surveyor should
inform the client if he or she belives it to be unrealistic. 3. Any change in inflation forecasts should be reported periodically.
Cost Reporting - If at any time during the deign process it becomes apparent that the agreed budget is likelt to be exceeded without the brief being changed, the client should bge informed and instructions requested. Likewise, if it becomes apparent that the whole of the agreed
budget will not be required, the client should be informed.