Professional Documents
Culture Documents
Reference Cable Schedule - JGS 320 - Non-Grid Synchronization
Reference Cable Schedule - JGS 320 - Non-Grid Synchronization
Sr. No.
Cable Identification
Cable Specifications
Cable Type
Cable Description
Emergency stop
2 W.E1.A
5 core, 10 sqmm
3 W.E12.B
Voltage Matching
4 W.E12.C
5 core, 4 sqmm
5 W.E13.C
1 core, 16 sqmm
earthing cable
6 W.M120.A
7 W.E33.A
CAN-BUS Cable
GEJ Supplied
8 W.I4.A
X2X
GEJ Supplied
PLC communication
2 W.E89.A
3 W.E90.A
4 W.E72.A
water pump
2 W.E11A
Electrical TCV
3 W.E92.A
pressure switch
2 W.E144.A
3 W.E29.A
Gas Counter
4 W.E30.A
Gas Counter
2 W.E20.A
Generator current
2 W.SSL13
Generator Voltage
3 W.SSL75
Busbar Voltage
W.SSL78.1
4 W.SSL78.2
W.SSL79
W.SSL80
GCB Close
W.SSL81
GCB Open
W.SSL82
GCB Ready
W.SSL84
GCB OL / SC
Rotation Light
2 W.SSL34
Horn
5 core, 25 sqmm
Battery +
2 W.E6.A
Battery -
Power Cables
Single Core, PVC/PVC 300 Sqmm Power Cables (Copper Conductor): 5 Cables/Phase, 3 Cable for Neutral & 2 Cables for Star Point
Note:
All cables, to be terminated in GEJ Control Panels should be flexible and copper conductor cables.
This cable schedule is only for reference.