Description

Planned Planned
Start
Finish
Total Cumulative achieved Balance Scope as % Completion as Date
Date
UOM
Scope up to Status Date
on Status Date on Status Date
Duration
Actual Actual
in days

Block Masonry Works


Upto Sill Level including band
3
No's
Upto Lintel Level
1F-2S 2
No's
Lintels & Chajjas Casting
2F-3S
No's
Above lintel packing
3F-4S
No's
Parpet Wall including faltform for water tank
1S-5S
No's
Fixing of structrual Steel Railing for Terrace &
Staircase
1S-6S
No's
Doors & Window Frame Fixing & applying wood
primer
4F-7S
No's
Electrical Conduiting including Metal box fixing
4F-8S
No's
Plumbing conduiting including internal sewer lines inculding testing
4F-9S
No's
Plastering Works
Ceiling - 8mm thk plaster
9F-10S
No's
Internal Wall - 12mm thk plaster
10F-11S
No's
Shelves
11F-12S
No's
External Wall - 18mm thk plaster (Two coats)
9F-13S
No's
Dry Finishing Works
Primer Coat for Ceiling (after curing period)
11F-14S
No's
Wall Putty (lappam) - 1st coats for internal Walls (After curing period)
14F-15S
No's
Wall Putty (lappam) - 2nd coats for internal Walls 20F-16S
Door & Window shutter fixing including hardware & applying wood putty
15F-17S
No's
Window Grill Fixing
17F-18S
No's
Door & Window shutter wood putty
18F-19S
Electrical Wiring
17F-20S
No's
Flooring Works
Fixing of IWC for common toilet
11F-21S
Dadoing tiles for Kitchen & Toilets Walls
21F-22S
No's
Vetrified tile flooring for all rooms including skirting
22F-23S
Non skid ceramic tiles for Toilets flooring
22F-24S
No's
Fixing of Granite for Kitchen Flat form
24F-25S
No's
Dry Finishing Works
Single Coat Primer for Internal Walls
24F-26S
No's
Single Coat Wood Primer for Doors & Windows 26S-27S
No's
Internal wall Painting - 1st Coat Acrylic Emulsion Paint
27F-28S
No's
Fixing of Modular switch boards and switches
28F-29S
No's
Fixing of Chrome Plated Fittings (CP Fittings) and Sanitary Fittings
29S-30S
No's
Painting for Doors & Windows - Enamel Paint 1st Coat
28F-31S
No's
Painting for Doors & Windows - Enamel Paint 2nd Coat
31F-32S
No's
External Works
Plumbing Works
Fixing of rainwater pipe
No's
Laying of Inlet and outlet pipe line for sweet water
No's
Sewer pipe line
No's
Other structures & ultities
Construction of UG Sump
47F-36S
No's
Construction of Rain Water harvesting Pit
47F-37S
No's
Construction of Sewer line Chamers
47F-38S
No's
Construction of wash area flat form including dadoing of Tiles
13F-39S
No's
Construction of CRS in bwt back to back houses 13F-40S
No's
Constrcution of Compound Wall
No's
Construction of Ramp and laying of parking tiles
Waterproofing for Terrace
No's
IPS Flooring for Stairs
No's
Fxing of Main Gate
No's
External Dry Finishing Works
External Painting Work - Primer single coat
39F-46S
No's
External Painting Work - 1st Coats
46F-47S
No's
External Painting Work - 2nd Coats
Glass Fixing for Windows, Ventilator and Elevation Windows
47F-49S
No's
Main Door Polishing Final
No's
Internal wall Painting - Final Coat Acrylic Emulsion Paint
No's

200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200

200
200
200
200
200
200
200
200
200
200

200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200

Asking Rate

S.No.

30-Sep-16
31-Dec-16
Balance Duration

Date of Completion
EOT

Remarks