YOLANDA RECONSTRUCTION
PROGRAM
QUESTIONNAIRE TO DECIDE SUITABILITY OF PROJECT
September 2014
A. BASIC DATA
A.1
Name of LGU
A.2
Address
A.3
Contact Person
A.4
Telephone Number
A.5
Email Address
bprocia@yahoo.com
A.6
Is there presently a PMU in the LGU dealing with the Yolanda projects?
Yes
A.6.1
If YES, please give the contract details of the Head of the PMU.
Mr. BENITO C. PROCIA
MPDC
Team Leader
If NO, the LGU will need to set up a PMU If the project is selected.
B.2
B.3
Why does the LGU consider this as a priority project? In Appendix 1 please all location map
and photographs.
Geographically, Capoocan is a a long-stretched town consisting of 21 barangays, thirteen
(13) of which are located along the coast of Carigara Bay and the remaining eight (8)
barangays are mountainous which are proximatrely located along the riverbanks. The
Philippine Fault Line (main) also aggravates town's disaster vulnerability. Prevailing concern
on the relocation or resettlement of affected residents dwelling along the coastal barangays
(on the issue of 40-meter unsafe zone) situates local leaders into a state of quandary due to
the town's catastrophic-proned location.
Breakwater construction reduces the intensity of wave action and reduces coastal erosion.
As of the 2014 geo-hazard monitoring results of the Mines and Geosciences Bureau (MGB),
the municipal proper of Capoocan, Leyte is potentially exposed to the possibility of land
disappearance due to high possibility of sea waters infiltration aggravated by the climatic
factors resulting to coastal erosions, storm surges and other catasprohic events.
Aside from protecting its constituents, it is an instinct characteristic of the local patriots to
protect the area where the seat of central government is located. Therefore, the
breakwater construction not only ensures the protection of lives, properties, livelihoods,
and the welfare of the future generation but also an opportunity to give due consideration
on the tenets of sustainable develpment benefitting the entire community of Capoocan.
B.4
B.5
How long does the LGU think it will take to complete the project?
32
MONTHS
40 Million
C.2
PESO
C.3
Is the LGU capable of preparing the detailed design, cost estimate, and drawing?
YES
If YES, please answer question C.4
If NO, please see C.5
C.4
How long will be needed if the project is selected for the LGU to prepare the detailed
design, cost estimate, drawing, etc.?
2.5
C.5
MONTHS
If selected then assistance can be given to the LGU concerning the design.
1
2
3
4
5
6
7
Description
VAT
EWT
Technical Preparation of DED
Australian Aid AVID
Overhead Expenses
Cash
Heavy Equipment (Dump Truck)
TOTAL
Amount
1,785,714.29
357,142.86
2,200,000.00
128,000.00
1,500,000.00
1,500,000.00
529,142.85
8,000,000.00
E. OTHER CONDITIONS
E.1
E.2
E.3
If YES to questions E.1 or E.2 please explain why and how these will be done before the
projects starts
F. OTHER INFORMATION
F.1
Projects
Rehab of Civic Center, Mun. Hall, Poublic Market and
DILG-Project Ray/DOHmajor facilities in the 12 brgys., Rehab of Mun. Health
Quick Fix Project
Office and 4 brgy. Health centers
DSWD-KALAHI CIDDS
Rehabilitation of Damaged Facilities in the Barangays
NCDDP
Australia Aid AVID
Technical Assistance to RAY Project
Save the Children
Rehab of Day Care Centers in 5 barangays
PDRRN
Repair of 2 School Buildings
F.2
Please give an estimate of how many contractors / suppliers are in your LGU that could
carry out the projects.
NONE
G. PROCUREMENT
G.1
G.2
Is the LGU capable to undertake the tendering, evalaution of tenders and prepare a tender evaluation repo
YES
H.
TECHNICAL SUPERVISION
H.1
If the project is selected does the LGU think it needs full time supervision?
YES
If YES, please answer question H.2 and H.3.
If NO, please answer question H.4, H.5, and H.6
H.2
If YES how many people do you think will be required? Please give details by position.
Project Manager
Site Supervising Engineer
H.3
If YES does the LGU have these people available for the supervision?
NO
H.3.1
If NO will the LGU be able to quickly recruit the people if the project is selected?
NO
H.4
It requires technical expertise on the project construction. There is a need for the LGU to
tap technical support of Gauff and Schema for a successful implementation of the project.
H.5
How many people do you think are needed for the part time supervision?
6
H.6
H.6.1
Does the LGU have these people available for part time supervision.
YES
If NO will the LGU be able to quickly recruit the people if the projec t is selected?