OPERATING SEQUENCE
The following flow chart pertains to typical operation of a Frame 6 gas turbine unit designed
for generator drive application. The differences from unit to unit (which are based on the
specific requirements of each unit) are not discussed here. Refer to the project or unit
specific documentation for more details.
Operational information includes startup and shutdown sequencing in the auto mode of
operation. This is intended to cover normal operation and assumes that initial startup,
calibration and checkouts have been completed and that the turbine is in the stand by mode
ready for operation with ac and dc power available for all equipment, and all annunciators
are cleared.
The following flow chart lists operator control system and machine actions or events in the
starting sequence of the gas turbine.
Page 1 of 11
NORMAL START
Auto Start
Startup Statust
Shutdown Status
Off Select
}
} Displays
}
}
All Trip functions are checked to be in the Not Tripped and reset
Page 2 of 11
Page 3 of 11
On
Liquid?
No
Page 4 of 11
On Gas?
No
Turbine Air Inlet separator Motor (88TA) started (if used)
Turbine accelerates to minimum firing speed (14HM)
Crank
Select?
End of Sequence
No
Auxiliary Turbine Vent timer energized (2TV)
Ignition relay is energized after time out (2TVX)
Spark plugs are energized (95SP)
60 second Firing timer is started (2TF)
No
On
Liquid ?
Yes
Fuel Stroke Reference (FSR) is set to Firing Value, which in turn is FSR
OUT for Gas and FQROUT for liquid
Page 5 of 11
Flame is
detected in 2 out
of 4 scanned
Yes
Flame is steady
for 2 sec before
firing timer
Times out
Yes
Fire
Select?
End of
Sequence
No
No
Page 6 of 11
Turbine accelerates
Turbine reaches acceleration set point (14HA) at approximately 50% speed
Between 55 to 60% speed, diesel engine torque into turbine becomes low and the
jaw clutch disengages as detected by the limit switch (33CS) and the diesel engine
cool down timer starts. Diesel engine accelerating solenoid de-energizes and the
diesel engine will idle until the cool down timer times out (5 minutes)
Turbine accelerates further
Yes
On
Gas?
Page 7 of 11
Is Generator
Synchronizing
Selector in
AUTO
End of Sequence
Page 8 of 11
Loading displayed
Speed control displayed
Pre-selected
load is
selected?
Base
Select
End of Sequence
Spinning
Reserve
displayed
End of Sequence
Page 9 of 11
Normal Shutdown
On
Liquid
Atomizing Air
bypass solenoid
de-energizes
Yes
Turbine decelerates below the acceleration speed set point (14HA).
At about 20% speed shutdown command is given to close fuel valves
Page 10 of 11
No
On
Liquid
End of Sequence
Page 11 of 11