HAYRAT PROJECT
OFFER
February 2015
Building:
Phase:
Subject:
Date:
MAIN MAJILIS
1
4.
ELECTRICAL INSTALLATIONS
5.
MECHANICAL INSTALLATIONS
TOTAL
12.765.973
670.310
1.731.640
15.167.923
GUEST LOUNGE
1
435.067
4.
ELECTRICAL INSTALLATIONS
51.600
5.
MECHANICAL INSTALLATIONS
152.070
TOTAL
638.737
SERVANT QUARTER
1
311.158
4.
ELECTRICAL INSTALLATIONS
47.000
5.
MECHANICAL INSTALLATIONS
155.000
TOTAL
513.158
OUTDOOR ARRANGEMENT
977.109
TOTAL:
1.585.490
18.882.417
OPTIONS
MAIN MAJILIS
GUEST LOUNGE
SERVANT QUARTER
ZUNANJA UREDITEV
2.014.786
65.800
46.361
819.861
TOTAL OPTIONS:
2.946.808
1/58
OFFER
February 2015
Building:
Phase:
Subject :
Date:
CONSTRUCTION WORKS
3.909.487
B.
2.752.145
Bi.
C.
FACADE CLADDING
D.
ELEVATOR
TOTAL OF CONSTRUCTION WORKS, FINISHING WORKS, FACADE
CLADDING, AND ELEVATOR
928.000
5.060.341
116.000
12.765.973
4.
ELECTRICAL INSTALLATIONS
4.1.
4.2.
4.3.
471.490
128.820
70.000
670.310
5.
MECHANICAL INSTALLATIONS
5.1.
5.2.
212.900
1.518.740
1.731.640
OPTIONS
A
B
Bi.
C
4.
285.000
93.800
853.350
179.920
1.412.070
602.716
2.014.786
2/58
OFFER
M-construction
February 2015
Unit
Pos.
Description
Price
measures Quantity
A.
A1.
EARTH WORKS
unit
Total
m3
8.500,00
4,0
34.000
m3
710,00
20,0
14.200
m3
2.400,00
10,0
24.000
m3
6.100,00
15,0
91.500
A2.
16.370
DEEP FOUNDATION
128,00
2.500,0
A3.
320.000
32.000
140,00
100,0
14.000
m3
560,00
400,0
224.000
1.345,00
400,0
538.000
2.299,00
1.860,00
420,00
400,0
400,0
400,0
919.600
744.000
168.000
b.
c.
d.
e.
3/58
OFFER
M-construction
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
70,00
190,0
13.300
200,00
16,5
3.300
A4.
262.420
m2
m2
500,00
165,00
28,0
65,0
14.000
10.725
m2
45,00
27,0
1.215
m2
1.450,00
14,0
20.300
3.870,00
12,0
46.440
3.030,00
23,0
69.690
m2
245,00
17,0
4.165
m1
245,00
9,0
2.205
m2
830,00
13,0
10.790
m2
400,00
8,0
3.200
18.273
4/58
OFFER
M-construction
February 2015
Unit
Pos.
A5.
Description
Price
measures Quantity
unit
Total
1.240,00
4,5
5.580
m3
14.250,00
15,0
213.750
m3
2.850,00
15,0
42.750
m3
152,10
9,0
1.369
26.345
3.909.487
DEEP FOUNDATION
pc
114,00
2.500,0
285.000
285.000
5/58
OFFER
M-Finish const.works
February 2015
Unit
Pos.
Description
Price
measures Quantity
B.
B1.
unit
Total
71.000,00
3,00
213.000
kg
38.000,00
3,00
114.000
kg
42.250,00
3,00
126.750
4.800,00
3,00
14.400
5.800,00
3,00
17.400
71.000,00
0,55
39.050
kg
kg
B2.
52.460
m1
2,00
550,00
1.100
m1
11,00
300,00
3.300
m1
65,00
32,00
2.080
kg
29.100,00
3,00
87.300
kg
34.000,00
3,00
102.000
m1
45,00
255,00
11.475
m1
50,00
97,00
4.850
B2.4 Metal profiles with anti-corrosive protection, as the substructure for the hanging of interior ceiling claddings
B2.5 Metal profiles with anti-corrosive protection, as the substructure for the hanging of interior wall claddings
B3.
21.211
JOINERY WORKS
OFFER
M-Finish const.works
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
b.
c.
d.
10,00
15.000,00
150.000
pc
8,00
4.500,00
36.000
pc
11,00
3.600,00
39.600
3,00
19.845,00
59.535
3,00
1.610,00
4.830
B4
28.997
CEMENT ESTRICHS
1.220,00
14,00
17.080
2.700,00
11,00
29.700
m2
4.678
7/58
OFFER
M-Finish const.works
February 2015
Unit
Pos.
B5
Description
Price
measures Quantity
unit
Total
m2
9.000,00
30,00
270.000
B6
SUSPENDED CEILINGS
m2
240,00
65,00
15.600
m2
3.950,00
98,00
387.100
B6.2 Torn-up interior suspended ceiling of gypsumcardboard panels, on galvanized sub-structure, floor
area 2910 m2. Price per m2 of developed area
B7
40.270
655,00
48,00
31.440
m2
95,00
64,00
6.080
m2
320,00
50,00
16.000
m2
900,00
65,00
58.500
m1
97,00
22,00
2.134
m1
312,00
28,00
8.736
B8
12.289
m2
1.880,00
215,00
404.200
m1
795,00
40,00
31.800
8/58
OFFER
M-Finish const.works
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
m1
60,00
195,00
11.700
m2
15,00
215,00
3.225
m1
50,50
195,00
9.848
B9
46.077
PAINTING WORKS
8.340,00
9,60
80.064
- acrylic primer
- 1x puttying and polishing of gypsum-cardboard
suspended ceilings
- 2x painting of gypsum-cardboard suspended ceilings
together with preliminary coating
m2
Price per m2
3.950,00
8,35
32.983
Price per m2
B9.3 Preparing the base and painting of gypsum-cardboard
suspended ceilings, the item comprises:
11.305
65.000
2.752.145
9/58
OFFER
M-Finish const.works
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
CEMENT ESTRICHS
m2
3.350,00
28,00
Bi.
Bi1
DECORATIONS OF CEILINGS
Decorations on the suspended ceiling in combination
plaster and polyurethane foam in a higher level
interierskih treatments together with the final painting.
Price per m2 developed area of the ceiling
Bi2
Bi3
93.800
93.800
m2
1.800,00
120,00
216.000
m2
3.300,00
190,00
627.000
pc
50,00
1.700,00
85.000
TOTAL OF
928.000
10/58
OFFER
M-Finish const.works
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
Bi2
Bi3
Bi4
Bi5
50,00
700,00
35.000
150.000
3.100,00
150,00
465.000
m2
1.800,00
60,00
31.350
m2
2.150,00
80,00
172.000
TOTAL OF OPTIONS
853.350
11/58
OFFER
M-Facade cladding
February 2015
Unit
Pos.
Description
C.
C1.
Price
measures Quantity
unit
Total
23,00
5.595,00
128.685
32,00
7,00
13,00
4,00
4.340,00
1.475,00
1.440,00
690,00
138.880
10.325
18.720
2.760
6,00
3,00
8.030,00
8.510,00
48.180
25.530
12/58
OFFER
M-Facade cladding
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
1,00
22.200,00
22.200
m2
19,40
775,00
15.035
pc
1,00
15.000,00
15.000
b.
C2.
42.532
Facade panels
C2.1. Facade cladding with decorative relief glass fiber
concrete facade panels, the item comprises:
- metal galvanized sub-structure for the mechanical
fixing of facade panels
- thermal insulation is covered in a separate item
- glass fiber concrete relief panels, joining with
dilatation joints with overlapping, with the drain pipe on
the horizontal exterior edge
- stainless fixing and anchoring material and joining
material
Price per m2 of developed area
a.
b.
c.
d.
e.
f.
g.
h.
m2
m2
1.535,00
2.870,00
245,00
235,00
376.075
674.450
m2
m2
590,00
48,00
220,00
230,00
129.800
11.040
m2
m2
330,00
800,00
220,00
220,00
72.600
176.000
m2
m2
990,00
104,00
220,00
220,00
217.800
22.880
6,00
737,00
4.422
45,00
385,00
17.325
68,00
737,00
50.116
13/58
OFFER
M-Facade cladding
February 2015
Unit
Pos.
d.
Description
Price
measures Quantity
unit
Total
pc
500,00
97,00
48.500
pc
8,00
152,00
5.896
8,00
9,00
105,00
737,00
250,00
90,00
2.000
2.250
9.450
710,00
300,00
213.000
485,00
220,00
106.700
m2
740,00
220,00
162.800
m2
152,00
330,00
50.160
81,60
220,00
17.952
140,00
330,00
46.200
63,00
330,00
20.790
21.700,00
3,55
77.035
e.
f.
g.
h.
Decorative wreaths
C2.4 Profiled decorative wreaths of glass fiber concrete, the
item comprises:
- metal galvanized sub-structure for the mounting of
wreaths
- wreaths of glass fiber concrete with stainless
anchors, mounted on the metal sub-structure
- stainless fixing and anchoring material and joining
material
Price per m2
a.
b.
c.
d.
e.
f.
g.
kg
14/58
OFFER
M-Facade cladding
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
Balustrade railing
C2.5 Balustrade railing of glass fiber concrete, the item
comprises:
- stainless anchors for the mounting of railing
- balustrade railing, made of base plate - base, round
stays and top shelf
Price per m1
m1
m1
m1
238,00
120,00
94,00
1.100,00
1.100,00
1.100,00
261.800
132.000
103.400
378,00
255,00
96.390
m2
270,00
220,00
59.400
Decorative elements
C2.8 Decorative element of glass fiber concrete, total height
126 cm, ball of the diameter 67,5 cm on the socle,
dimension 125x125 cm, mounted on the top of the
pc
decorative socle
35,00
800,00
28.000
a.
b.
c.
pc
1,00
3.250,00
3.250
pc
32,00
300,00
9.600
Thermal insulation
C2.11 Thermal insulation thickness 5 cm, mineral wool plates
m2
laminated with glass fleece
2.200,00
13,00
28.600
11.900,00
13,50
160.650
m2
15/58
OFFER
M-Facade cladding
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
C3.
339.833
m2
1.350,00
35,00
C4.
Total
47.250
4.725
m2
705,00
215,00
151.575
m1
265,00
195,00
51.675
m1
45,00
235,00
10.575
C5.
21.383
BUILDING ROOF
Flat roof
C5.1 Flat roof layers, the item includes:
- inclination concrete
- 2-times cold bituminous coating
- single-layer bituminous hydro-insulations, thickness =
4mm, welded on the base
- thermal insulation, thickness 5 cm, extruded
polystyrene
- dividing layer
- floor concrete slabs, thickness = 50 mm
m2
Price per m2
2.515,00
71,00
178.565
OFFER
M-Facade cladding
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
1.270,00
25,00
31.750
m1
70,00
150,00
10.500
Covering of cupolas
C5.4 Covering of cupolas on the roof, the item includes:
- 2-times cold bituminous coating
- single-layer bituminous hydro-insulations, thickness =
4mm, welded on the base
- thermal insulation, thickness 5 cm, extruded
polystyrene
- metal galvanized sub-structure for the mounting of
roof covering
- roof covering of the aluminum painted sheet, of
rhomboid shape, with flaps
- stainless fixing and anchoring material and sealing
material
Price per m2 of developed area for 6 cupolas
m2
805,00
300,00
241.500
200,00
210,00
42.000
m1
494,00
21,00
10.374
pc
6,00
150,00
900
C5.7 Roof intake pipes, mounted in the flat roof, for the
drainage of meteoric waters
C5.8 Unforeseen works. Estimate of 10 % of the value of
the foreseen works for roof
51.559
5.060.341
17/58
OFFER
M-Facade cladding
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
pc
32,00
2.560,0
81.920
2.800,00
35,0
98.000
BUILDING ROOF
a.
179.920
18/58
OFFER
M-electrical
February 2015
Unit
Pos.
4.
Description
measures
Quantity
Price
unit
Total
ELECTRICAL INSTALLATIONS
BUILDING MAJLS
4.1.
4.1.5.11.1
4.1.5.11.2
4.1.5.11.4
4.1.5.11.5
4.1.5.11.6
4.1.5.11.7
4.1.5.11.9
4.1.5.11.10
260.000
17.300
75.580
24.620
13.100
5.840
14.070
471.490
60.980
4.2.
4.2.5.12.1
4.2.5.11.2
4.2.5.12.4
4.2.5.12.5
4.2.5.12.6
27.170
16.060
35.860
18.100
25.660
4.2.5.12.7
4.3.
1.5
128.820
1.1
1.2
1.3
1.4
5.970
DIESEL GENERATOR
MV BLOCK (10kV)
TRANSFORMER EQUIPMENT
VIDEO SURVEILLANCE OUTSIDE- 10 CAMERAS
MULTIMEDIA -ESTIMATE UP TO 75000
TOTAL OPTIONS FOR ELECTRICAL INSTALLATIONS
70.000
670.310
176.986
120.000
73.920
61.770
64.270
30.770
75.000
602.716
19/58
OFFER
M-Water
February 2015
Unit
Pos.
5.1.
Description
Price
measures Quantity
unit
Total
3545
pc
pc
pc
pc
pc
pc
3
7
20
2
4
36
pc
pc
6
1
pc
pc
1
1
212.900
20/58
Pos.
5.2.
OFFER
M-Hvac
February 2015
Description
Unit
measures Quantity
Price
unit
Total
1.
2.
3.
4.
5.
6.
set
set
450
9800
set
14
set
set
14
7.
8.
9.
Pos.
Description
Unit
measures Quantity
OFFER
M-Hvac
February 2015
set
kg
7.800
5.
m2
550
6.
set
7.
set
Centrifugal outlet radial fan for the outlet of air from the
kitchen
V= 3000 m3/h
including the self-closing valve, electric control cabinet,
set
mounting material
set
set
4
5
set
kg
1700
5.
m2
6.
set
7.
set
4.
8.
Total
set
3.
Price
unit
2.
3.
4.
22/58
Pos.
8.
OFFER
M-Hvac
February 2015
Description
Unit
measures Quantity
Price
unit
Total
55
3.
set
4.
set
5.
set
12
set
32
2.
23/58
Pos.
OFFER
M-Hvac
February 2015
Description
Unit
measures Quantity
Price
unit
Total
2.
3.
set
set
set
kg
14.800
m2
650
set
set
set
1
1
set
2.
3.
3.
4.
5.
24/58
OFFER
SERVANT QUARTER
February 2015
CONSTRUCTION WORKS
B.
C.
FACADE CLADDING
128.035
311.158
4.
ELECTRICAL INSTALLATIONS
5.
MECHANICAL INSTALLATIONS
5.1.
5.2.
HEATING/COOLING
TOTAL OBJEKT SERVANT QUARTER :
43.605
47.000
36.600
118.400
513.158
OPTIONS:
5.236
41.125
46.361
25/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
A.
A1.
EARTH WORKS
unit
Total
m3
510,00
4,0
2.040
m3
170,00
20,0
3.400
m3
100,00
10,0
1.000
m3
410,00
15,0
6.150
A3.
1.259
27,00
100,0
2.700
m3
127,00
400,0
50.800
m3
m3
23,00
52,00
400,0
400,0
9.200
20.800
m2
6,00
16,5
99
A4.
8.090
m2
350,00
28,0
9.800
m2
525,00
14,0
7.350
m2
250,00
12,0
3.000
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
410,00
23,0
9.430
m2
19,00
17,0
323
29,00
9,0
261
A5.
3.016
m2
202,00
3,6
727
73
139.518
B.
B2.
m1
8,00
32,00
256
B3.
26
JOINERY WORKS
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
pc
2,00
1.980,00
3.960
B.4
396
CEMENT ESTRICHS
m2
183,00
14,00
2.562
m2
19,00
23,00
437
B6
300
SUSPENDED CEILINGS
m2
67,00
60,00
4.020
m2
120,00
30,00
3.600
m2
14,50
75,00
1.088
B7.
762
m2
160,00
48,00
7.680
m2
199,00
50,00
9.950
28/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
m1
108,00
unit
22,00
B9
Total
2.376
2.001
PAINTING WORKS
m2
280,00
9,60
2.688
m2
134,50
8,35
1.123
381
43.605
C.
C1.
a.
b.
pc
pc
7,00
3,00
2.700,00
700,00
18.900
2.100
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
pc
5,00
2.090,00
10.450
b.
pc
1,00
1.880,00
1.880
C2.
3.333
a.
b.
c.
19,00
220,00
4.180
m2
3,50
70,00
245
m2
22,00
220,00
4.840
91,00
220,00
20.020
1.200,00
3,55
4.260
30/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
m2
135,50
13,50
1.829
C3.
m2
388,00
42,00
C4.
16.296
1.630
12,00
195,00
2.340
C5.
234
BUILDING ROOF
m2
256,00
71,00
18.176
31/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
84,00
75,00
6.300
m1
83,00
21,00
1.743
C5.7 Roof intake pipes, mounted in the flat roof, for the drainage
pc
of meteoric waters
3,00
150,00
450
C6.
2.667
FACADE SCAFFOLD
m2
375,00
ELECTRICAL INSTALLATIONS
SERVANT QUARTER
m2
235,00
47.000
5.1.
2.625
128.035
4.
7,00
3,00
3,00
3,00
9,00
36.600
32/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
5.2
Description
Price
measures Quantity
unit
Total
1.
2.
3.
4.
set
1,00
set
5,00
set
1,00
kg
950,00
5.
m2
100,00
6.
set
1,00
7.
set
1,00
set
1,00
8.
2.
Centrifugal outlet radial fan for the outlet of air from the
kitchen
V= 1350 m3/h
including the self-closing valve, electric control cabinet,
mounting material
Radial fan for the outlet of air from the sanitary premises,
including the self-closing valve, electrical switch, sound
silencer
33/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
set
3,00
set
1,00
kg
350,00
5.
m2
2,50
6.
set
1,00
7.
set
1,00
set
1,00
V= 120 m3/h
3.
4.
8.
unit
Total
2.
10,00
3.
set
1,00
4.
set
1,00
5.
1,00
1,00
34/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
1,00
set
5,00
set
1,00
set
1,00
set
1,00
kg
260,00
2.
m2
8,00
3.
set
8,00
set
1,00
set
1,00
5.
set
5.2
2.
3.
3.
4.
118.400
35/58
OFFER
SERVANT QUARTER
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
B4
CEMENT ESTRICHS
187,00
28,00
5.236
5.236
C2.
Fasadni paneli
C2.1. Facade cladding with decorative glass fiber concrete
facade panels, the item comprises:
- metal galvanized sub-structure for the mechanical fixing
of facade panels
- thermal insulation, thickness = 5 cm
- glass fiber concrete panels, joining with dilatation joints
with overlapping, with the drain pipe on the horizontal
exterior edge
- painting glass fiber concrete facade panels
- stainless fixing and anchoring material and joining
material
Price per m2 of developed area
175,00
235,00
41.125
41.125
36/58
OFFER
GUEST LOUNGE
February 2015
CONSTRUCTION WORKS
B.
C.
FACADE CLADDING
191.862
435.067
84.737
51.600
4.
ELECTRICAL INSTALLATIONS
5.
MECHANICAL INSTALLATIONS
5.1.
5.2.
HEATING/COOLING
120.570
638.737
31.500
OPTIONS
B
5.768
Bi.
21.150
65.800
TOTAL OPTIONS
92.718
SERVANT QUARTER :
37/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
A.
A1.
EARTH WORKS
unit
Total
m3
510,00
4,0
2.040
m3
185,00
20,0
3.700
m3
85,00
10,0
850
m3
425,00
15,0
6.375
A3.
1.297
33,00
100,0
3.300
m3
150,00
400,0
60.000
m3
m3
m3
m3
26,00
58,00
5,00
400,0
400,0
400,0
10.400
23.200
2.000
7,00
16,5
116
A4.
9.902
MASONRY WORK
375,00
28,0
10.500
m2
630,00
14,0
8.820
285,00
12,0
3.420
38/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
335,00
23,0
7.705
m2
28,00
17,0
476
m1
43,00
9,0
387
A5.
3.131
m2
175,00
3,6
630
m2
32,00
4,5
144
77
158.469
B.
B1.
STEEL CONSTRUCTION
kg
700,00
3,00
2.100
B2.
210
m1
12,00
32,00
384
kg
320,00
3,00
960
kg
700,00
3,00
2.100
B2.4 Metal profiles with anti-corrosive protection, as the substructure for the hanging of interior ceiling claddings
B2.5 Metal profiles with anti-corrosive protection, as the substructure for the hanging of interior wall claddings
39/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
B3.
344
JOINERY WORKS
pc
4,00
2.090,00
8.360
b.
pc
4,00
1.880,00
7.520
B.4
1.588
CEMENT ESTRICHS
102,00
14,00
1.428
122,00
11,00
1.342
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
m2
28,00
unit
Total
23,00
644
B5
341
m2
75,00
30,00
2.250
B6
SUSPENDED CEILINGS
m2
28,00
60,00
1.680
m2
177,00
30,00
5.310
m2
45,00
98,00
4.410
m2
5,00
75,00
375
B6.3. Torn-up interior suspended ceiling of gypsumcardboard panels, on galvanized sub-structure, floor
area 32 m2. Price per m2 of developed area
B7.
1.178
m2
112,00
48,00
5.376
m2
130,00
50,00
6.500
m1
75,00
22,00
1.650
B8
1.353
m2
75,00
215,00
16.125
41/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
m1
60,00
unit
Total
40,00
B9
2.400
1.853
PAINTING WORKS
440,00
9,60
4.224
- acrylic primer
- 1x puttying and polishing of gypsum-cardboard
suspended ceilings
- 2x painting of gypsum-cardboard suspended ceilings
together with preliminary coating
m2
Price per m2
227,00
8,35
1.895
Price per m2
B9.2 Preparing the base and painting of gypsum-cardboard
suspended ceilings, the item comprises:
612
C.
C1.
84.737
a.
b.
c.
1,00
23.250,00
23.250
6,00
4,00
2.700,00
700,00
16.200
2.800
42/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
pc
2,00
3.650,00
C2.
2.113
4.436
Facade panels
C2.1. Facade cladding with decorative glass fiber concrete
facade panels, the item comprises:
- metal galvanized sub-structure for the mechanical
fixing of facade panels
- thermal insulation, thickness = 5 cm
- glass fiber concrete panels, joining with dilatation
joints with overlapping, with the drain pipe on the
horizontal exterior edge
- stainless fixing and anchoring material and joining
material
Price per m2 of developed area
a.
b.
c.
d.
m2
m2
m2
m2
27,00
4,40
44,00
25,00
235,00
225,00
220,00
220,00
6.345
990
9.680
5.500
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
f.
pc
16,00
97,00
1.552
pc
2,00
152,00
304
pc
3,00
737,00
2.211
m2
2,00
240,00
480
m2
16,00
220,00
3.520
m2
4,80
70,00
336
m2
76,00
220,00
16.720
kg
1.100,00
3,55
3.905
m1
15,50
1.100,00
17.050
m2
255,00
13,50
3.443
Decorative wreaths
C2.4 Profiled decorative wreaths of glass fiber concrete, the
item comprises:
- wreaths of glass fiber concrete with stainless
anchors, mounted on the metal sub-structure
- stainless fixing and anchoring material and joining
material
a.
b.
Balustrade railing
C2.5 Balustrade railing of glass fiber concrete, the item
comprises:
- stainless anchors for the mounting of railing
- balustrade railing, made of base plate - base, round
stays and top shelf
Price per m1
Painting glass fiber concrete
C2.12 Painting all glass fiber concrete elements on the
facade, the item comprises:
- sanation contacts of glass fiber concrete
- primary paint
- 2x final paint
Price per m2
C2.13 Unforeseen works. Estimate of 10% of the value of the
foreseen works for prefabricated concrete elements
7.204
44/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
C3.
Description
Price
measures Quantity
unit
Total
m2
320,00
42,00
13.440
C3.
672
m2
46,00
215,00
9.890
m1
3,40
195,00
663
C4.
1.055
BUILDING ROOF
Flat roof
C4.1 Flat roof layers, includes vertical finishing hydroinsulation elements, the item includes:
- inclination concrete
- 2-times cold bituminous coating
- single-layer bituminous hydro-insulations, thickness =
4mm, welded on the base
- thermal insulation, thickness 50 mm, extruded
polystyrene
- dividing layer
- floor concrete slabs, thickness 5 cm
m2
Price per m2
248,00
71,00
17.608
92,00
75,00
6.900
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
m2
18,50
290,00
5.365
m1
101,00
21,00
2.121
3,00
150,00
450
C4.6 Roof intake pipes, mounted in the flat roof, for the
drainage of meteoric waters
pc
C5.
3.244
FACADE SCAFFOLDS
345,00
4.
7,00
2.415
191.862
ELECTRICAL INSTALLATIONS
GUEST LOUNGE
258,00
51.600
pc
4,00
WC
Wash basin
Bathtub
TOTAL
pc
pc
pc
pc
4,00
4,00
4,00
16,00
Condense outlet 75
46/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
5.2
31.500
2.
3.
4.
5.
1,00
5,00
set
1,00
kg
560,00
m2
60,00
6.
set
1,00
7.
set
1,00
8.
47/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
1.
3.
Description
Price
measures Quantity
Centrifugal outlet radial fan for the outlet of air from the
kitchen, including the self-closing valve, electric control
cabinet, mounting material
V= 120 m3/h
set
Peripheral elements: regulation blinds, fire-fighting
valves, sound silencers, roof caps, etc.
1,00
kg
300,00
5.
m2
2,50
6.
set
1,00
7.
set
1,00
set
1,00
10,00
3.
set
1,00
4.
set
1,00
5.
8.
Total
4,00
set
4.
unit
B.3 - Preparation of cold water for airconditioning devices and pipe installations
1.
2.
1,00
48/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
set
1,00
set
6,00
set
1,00
set
1,00
set
1,00
set
2.
3.
kg
2.
m2
100,00
3.
set
1,00
1.100,00
3.
1,00
4.
set
1,00
5.
set
1,00
5.2
120.570
49/58
OFFER
GUEST LOUNGE
February 2015
Unit
Pos.
Description
Price
measures Quantity
unit
Total
CEMENT ESTRICHS
206,00
28,00
5.768
5.768
90,00
21.150
21.150
Fasad panels
C2.1. Facade cladding with decorative glass fiber concrete
facade panels, the item comprises:
- metal galvanized sub-structure for the mechanical
fixing of facade panels
- thermal insulation, thickness = 5 cm
- glass fiber concrete panels, joining with dilatation
joints with overlapping, with the drain pipe on the
horizontal exterior edge
- painting glass fiber concrete facade panels
- stainless fixing and anchoring material and joining
material
Price per m2 of developed area
280,00
235,00
65.800
65.800
50/58
OFFER
OUTDOOR ARRANGEMENT
February 2015
TOTAL RECAPITULATION
OUTDOOR ARRANGEMENT
The outdoor arrangement surface is
5416 m2
1.
34.870
2.
UNDERGROUND STRUCTURE
54.605
3.
140.000
4.
172.199
5.
284.124
6.
59.400
7.
PLANTING OF TREES
17.400
8.
PLANTING OF BUSHES
9.
4.680
20.600
2.192
124.239
62.800
977.109
OPTION
3.
4.
13.
14.
205.000
221.261
153.600
240.000
819.861
51/58
1.
PRELIMINARY WORKS ON THE BUILDING PLOT 56.800m2 - WITHOUT ROAD 1 AND ROAD 2
Pos.
1.2.
OFFER
OUTDOOR ARRANGEMENT
February 2015
Description
Unit
measures Quantity
Price
unit
Total
m3
1.624,80
4,60
7.474
m3
1.624,80
6,10
9.911
3.
m3
1.124,80
12,70
14.285
4.
Depositing of soil
m3
500,00
2,40
1.200
m2
5.000,00
0,40
2.000
1.
2.
6.
34.870
34.870
2.
UNDERGROUND STRUCTURE
2.1.
a.
m1
87,80
49,30
4.329
pc
4,00
499,20
1.997
pc
4,00
960,00
3.840
Line chanelettes
DN 200, with cast-iron grid
m1
e.
pc
5,00
343,00
1.715
f.
pc
1,00
7.653,10
7.653
2.2.
200,00
21,80
4.360
3,00
870,40
2.611
b.
c.
d.
b.
m1
pc
52/58
Pos.
c.
OFFER
OUTDOOR ARRANGEMENT
February 2015
Description
Unit
measures Quantity
Price
unit
Total
6,00
150,00
900
150,00
70,00
10.500
PC
1,00
2.300,00
2.300
m1
400,00
36,00
14.400
b.
54.605
3.
3.1.
m2
1.400,00
100,00
4.
4.1.
4.2.
140.000
140.000
m2
2.050,00
100,00
205.000
m2
2.064,00
40,00
82.560
m2
1.374,00
28,80
39.571
53/58
Pos.
OFFER
OUTDOOR ARRANGEMENT
February 2015
Description
Unit
measures Quantity
Price
unit
Total
4.3.
JAPANESE GARDEN
- laying of stones following the principle of
Japanese garden
m2
0,00
4.4.
m1
1.000,00
46,10
46.100
4.5.
m1
m1
m1
m1
0,00
0,00
0,00
0,00
102,40
121,60
67,80
80,60
0
0
0
0
4.6.
kos
10,00
32,00
320
4.7.
Sinking stays
kos
1,00
3.648,00
3.648
4.8.
m2
0,00
153,60
4.9.
kos
0,00
3.648,00
0,00
41,00
4.1.
OPTION
Additional payment
PAVED DRIVING - MARCHING SURFACES BY
THE REINFORCED CONCRETE SLAB
- granite cubes 10/30/6 cm, embedded with
cement mortar
172.199
m2
2.064,00
107,20
221.261
5.
5.1.
m1
400,00
384,00
153.600
kos
2,00
12.350,00
24.700
m2
400,00
254,00
101.600
Park benches
pc
4,00
448,00
1.792
Rubbish bins
pc
10,00
243,20
2.432
284.124
54/58
Pos.
OFFER
OUTDOOR ARRANGEMENT
February 2015
Description
Unit
measures Quantity
Price
unit
Total
6.
a.
Planning
m2
2.000,00
3,30
6.600
b.
Preparation of base
m2
2.000,00
3,50
7.000
c.
m3
500,00
34,00
17.000
d.
m3
500,00
57,60
28.800
59.400
7.
PLANTING OF TREES
a.
kos
15,00
160,00
2.400
Tree shoots
kpl
15,00
1.000,00
15.000
b.
17.400
8.
PLANTING OF BUSHES
a.
kos
30,00
22,00
660
kpl
30,00
134,00
4.020
c.
4.680
9.
a.
m2
2.000,00
7,70
15.400
b.
m2
2.000,00
2,60
5.200
20.600
10.
a.
m2
10,00
83,20
832
m2
10,00
136,00
1.360
b.
2.192
55/58
Pos.
11.
OFFER
OUTDOOR ARRANGEMENT
February 2015
Description
Unit
measures Quantity
Price
unit
Total
1.
CONSTRUCTION WORKS
Earth works - excavation and back-filling
m3
70,00
17,70
1.239
97.000
18.000
8.000
124.239
124.239
83.000
4.1.5.11
ELECTRICAL INSTALLATIONS - OUTDOOR ARRANGEMENT
4.1.5.11
ELECTRICAL INSTALLATIONS - OUTDOOR ARRANGEMENT
LAMPS
4.1.5.11.1
45.000
INSTALLATION MATERIAL
4.1.5.11.2
17.800
13.
FOUNTAIN
1.
CONSTRUCTION WORKS
Earth works
m1
Concreting
m1
4.
62.800
m2
5.
56/58
Pos.
Description
Unit
measures Quantity
OFFER
OUTDOOR ARRANGEMENT
February 2015
Price
unit
Total
m2
2.
m2
3.
4.
m2
Pos.
OFFER
OUTDOOR ARRANGEMENT
February 2015
Description
Unit
measures Quantity
Price
unit
Total
pc
1,00
153.600
58/58