Professional Documents
Culture Documents
Presentation de Me
Presentation de Me
Content
1. A valuable cocktail
2. Group Structure
3. Activities
5. Position DEME
6. Equipment
philosophy
Making the difference through high-tech
innovation
Priority issues : Quality, Health and Safety
Santa F 1912
- Argentina
Montevideo 1915
Uruguay
Content
1. A valuable cocktail
2. Group Structure
3. Activities
5. Position DEME
6. Equipment
Content
1. A valuable cocktail
2. Group Structure
3. Activities
5. Position DEME
6. Equipment
Dredging
Maintenance dredging
Rio Orinoco, Venezuela
Baggerwerken
Decloedt N.V.
Dredging
International N.V.
D.I. West Africa
D.I. Asia Pacific
Dredging Group.
Construction Vuosaari
Port, Finland
QDC
Middle East.
D.I. Panama
I.S.D.
India
DEBRA
DEME Brasil
Dredging
Dredging
Dredging
Land Reclamation
Pearl Qatar
Construction 400 ha
artificial peninsula,
Doha - Qatar
Dredging
Land Reclamation
Reclamation 1,700 ha
platform for New
International Airport
Doha - Qatar
Dredging
Land Reclamation
Reclamation 1,700 ha
platform for New
International Airport
Doha - Qatar
Dredging
Construction Deurganck
container dock, Antwerp
Belgium
Construction Le Havre
Port 2000, France
Harbour Construction
Extending Freeport
cruise port, Bahamas
Construction Hazira
LNG Port - India
Rejuvenation of Offshore
Platforms North Sea
Breakwater construction,
Trapani, Italy
Marine &
Offshore
Tideway B.V.
Landfall Construction
Directional Drilling
Environmental Techniques
DEC N.V.
De Vries &
van de Wiel B.V.
Ecoterres S.A.
Environmental
Techniques
Landscaping
Brownfield rehabilitation
Environmental
Techniques
Treatment of contaminated silt
and soils
Decontamination and
Rehabilitation of Waterways
Project Development
Power@Sea
C-Power N.V.
IPEM.
Project Development
Power@Sea
Project Development
Construction of a 300 MW
C-Power N.V.
Offshore Windfarm on the
Thornton Bank - Belgium
Project Development
IPEM.
Content
1. A valuable cocktail
2. Group Structure
3. Activities
5. Position DEME
6. Equipment
7000
Million EURO
6000
5200 5200
5000
4000
3000
2000
1000
1487
1363 992 1004
744 637 739
1177
2231 2107
1715 1594
4200 4100
3719
3400
3223
2591
2246
0
1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2006
Total Free Market Turnover
Total Turnover European Dredging Companies
ANNUAL TURNOVER
DEME GROUP
1200
1150
1077
960
840
750
687
720
600
555
480
384
360
565
760
720
677
650
600
423
374
352
246
240
154
195
120
0
19
90
19
91
19
92
19
93
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
MILLION EURO
1080
33%
2003
0%
12%
2%
26%
BENELUX
REST EUROPE
AMERICA
AFRICA
MIDDLE-EAST
ASIA+OCEANIA
11%
17%
24%
21%
2006
16%
11%
ORDER BOOK
End 2001
1,269 Mio
End 2002
1,091 Mio
End 2003
1,005 Mio
End 2004
1,001 Mio
End 2005
1,300 Mio
End 2006
1,600 Mio
Denmark
Finland
Norway
United Kingdom
Ireland
France
Russia
Benelux
Italy
Germany
Spain
Mexico
Gulf of Mexico
Bahamas
Dom. Republic
Trinidad & Tobago
Morocco
Guinea
Venezuela
Libya
Iran
Kuwait
Qatar
U.A.E.
Bulgaria
Bahrain
China
Taiwan
Pakistan
Nigeria
India
Bangladesh
Ghana Gabon
Brazil
Cameroun
Angola
Malaysia
Maldives
Uruguay
La Runion
Singapore
Australia
South Africa
Papua New Guinea
Argentina
Content
1. A valuable cocktail
2. Group Structure
3. Activities
5. Position DEME
6. Equipment
SUBSEGMENTATION OF
THE CORE BUSINESS
JUMBO TRAILERS
SMALL SHALLOW TRAILERS (1000 to 1500 m3)
MEDIUM TRAILERS (2000 to 10.000 M3)
LARGE STATIONARY CUTTER SUCTION DREDGERS
LARGE SELF-PROPELLED AND SEAGOING
ROCK CUTTER DREDGERS
SMALL AND MEDIUM CUTTER DREDGERS
MECHANICAL DREDGERS (backhoe, bucket, clamshell
OFFSHORE FALL PIPE VESSELS
MAJOR INVESTMENTS
IN RECENT YEARS
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
MAJOR INVESTMENTS
IN THE 21ST CENTURY SO FAR
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
MAJOR INVESTMENTS
IN RECENT YEARS
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
MAJOR INVESTMENTS
IN RECENT YEARS
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
MAJOR INVESTMENTS
IN RECENT YEARS
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
MAJOR INVESTMENTS
IN RECENT YEARS
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
MAJOR INVESTMENTS
IN RECENT YEARS
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
MAJOR INVESTMENTS
IN RECENT YEARS
CHARLEMAGNE
LANGE WAPPER
UILENSPIEGEL
VAGANT
PALLIETER
DARTAGNAN
MARIEKE
REYNAERT
BRABO (under construction)
BREYDEL (under construction)
CSD
DArtagnan
28,000 kW
Vlaanderen XIX
Al Mahaar
Rubens
Vlaanderen XI
11,728 kW
11,224 kW
10,896 kW
9,862 kW
Cap Martin
Wombat
Brabo
Kallo
5,541 kW
5,341 kW
5,047 kW
4,297 kW
Kalis II
Vlaanderen XVI
Seckin
Bilba
Mudsnapper
DC 203 Blani
2,549 kW
1,740 kW
1,180 kW
1,153 kW
580 kW
441 kW
TSHD
Pearl River
Nile River
Lange Wapper
Uilenspiegel
24,146 m3
17,000 m3
13,700 m3
13,700 m3
Brabo
Vlaanderen XVIII
Pacifique
Antigoon
Breydel
11,650 m3
11,300 m3
9,208 m3
8,400 m3
9,000 m3
Marieke
Reynaert
Pallieter
Vlaanderen XX
Charlemagne
5,600 m3
5,600 m3
5,400 m3
5,072 m3
5,000 m3
Atlantico Due
Mellina
Jade River
Orwell
Vlaanderen I
River Bee
Vlaanderen XXI
4,200 m3
3,650 m3
3,200 m3
2,575 m3
2,065 m3
1,800 m3
1,751 m3