Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

DAFTAR PUSTAKA

Arif, I., 2002. Perencanaan Tambang. Bandung: Institut Teknologi Bandung.


Azpurua, M., Ramos, K. D., 2010. A Comparizon of Spatial Interpolation
Methods for Estimation of Average Electromagnetic Field Magnitude,
Progress in Electromagnetics Research M., Vol. 14, pp.135-145.
Bankes, P., Bullis, R., Gow, N., Haystead, B., Hills, A., Juras, S., Leagult, M.,
Olson, P., Samis, A., Severin, P., Spring, V., 2003. Estimation of Mineral
Resource and Mineral Reserve. Montreal: Canadian Institite of Mining and
Metallurgy and Petroleum (CIM).
Bohling, G. 2005. Introduction to Geostatistic and Variogram Analysis. C&PE
940. Kansas Geological Survey. Kansas.
Burger, P.A., 1996. Origins and Characteristics of Lateritic Deposits In:
Proceeding Nickel 96. The Australasian Institute of Mining and
Metallurgi. pp 179-183. Melbourne.
Dalvi, A. D., Bacon, W. G., Osborne, M. C., 2004. The Past and The Future of
Nickel Laterites. PDAC 2004 International Convention, Inco Limited,
Ontario.
Davis, G. A., Newman, A. M., 2008. Modern Strategic Mine Planning. CRC Mining
Conference Paper, Colorado School of Mine, Colorado.
Dagdelen, K. 2001. Open Pit Optimization Strategies for Imrpoving Economics
of Mining Projects Through Mine Planning. International Mining Congress
and Exhibition of Turkey (IMCET 2001). ISBN 975-395-417-4.
Gemcom. 2013. Gemcom Surpac Geology and Mine Planning: Geological
Database Version 6.5. Vancouver: Gemcom Software International Inc.
Gemcom. 2013. Gemcom Surpac Geology and Mine Planning: Geostatistics
Version 6.5. Vancouver: Gemcom Software International Inc.

Hustrulid, W., Kuchta, M., 1996. Open Pit Mine Planning and Design, Volume 1Fundamentals. Leiden/ London/ New York/ Philadelphia/ Singapore: . A. A.
Balkema Publishers.
Isaaks, E. H., Srivastava, R. M., 1989. Applied Geostatistics. New York/ Oxford:
Oxford University Press.
Komatsu. 2003. Specification and Application Handbook Komatsu Edition 24,
Japan: Komatsu.
Lee, T,D., 1984, Planning and Mine Feasibility Study-an Owners Perpective,
Proceedings of The 1984 NWMA, Short Course Mine Feasibility-Concept
to Completion, Spokane, WA.
Newman, A. M., Kuchta, M., Martinez, M., 2005. Long and Short-Term
Production Scheduling at LKABs Kiruna Mine. Chapter 1. LKAB. Colorado.
Pasaribu, J. M., Haryani, N. S., 2012. Perbandingan Teknik Interpolasi DEM
SRTM dengan Metode Inverse Distance Weighted (IDW), Natural
Neighbor dan Spline. Jurnal Penginderaan Jauh, Vol. 9 No. 2, pp126-239.
LAPAN.
Rochmanhadi. 1984. Perhitungan Biaya Pelaksanaan Pekerjaan Menggunakan
Alat-Alat Berat. Badan Penerbit Pekerjaan Umum.
Samanta, B., Sarkar, B., 2003. TPM and Assessment of Overall Effectiveness for
Mining Equipment. Coal Mining Technology & Management, Vol. 8, No.2,
pp10-21.
Sasongko,W., 2009. Pemodelan Optimasi Pit Tambang Terbuka Batu bara:
Pendekatan Instrumental Pit Expansion dan Model Cash Flow.
Yogyakarta: Universitas Gadjah Mada.
Suharyadi, Purwanto, 2009. Statistika
Modern. Jakarta: Salemba Empat.

untuk

Ekonomi

dan

Keuangan

Thompson, R.J., 2005, Surface Trip Coal Mining Handbook, South African
Colliery Managers Association.
Thorley, U., 2012. Open Pit Mine Planning: Analysis and System Modeling of
Conventional and Oil Sands Applications. Kingston: Queens University.

You might also like