Estimate of Aqueduct Canal Discharge 0.9825 Cumecs High Flood Discharge 18 Cumecs SL No. Item of Work Unit Quantity Rate Amount (In Lakh)
Estimate of Aqueduct Canal Discharge 0.9825 Cumecs High Flood Discharge 18 Cumecs SL No. Item of Work Unit Quantity Rate Amount (In Lakh)
SL No.
Item of Work
Earthwork in excavation of foundation treanches in hard soil
(vide classification of soil item-A), disposal of excavated earth
so obtained to a distance upto 50m and average lift of 1.5m
including leveling, ramming and foundation treanches ,
removing the roots and shurbs etc all complete as per
specification and direction of E/I (7.1.17)
m3
20.79
72
0.0149688
m3
7.1
72
0.005112
m3
68.6
6172.7 4.23448592
m3
24.43
7689.4 1.87851309
Tonnes
3.6519
46253 1.68910089
20
113
0.0226
7.8447807
0.07844781
0.07844781
8.0016763
Quantity of Aquaduct
Sl. No.
1(a)
1(b)
1( c)
2(a)
Description of Work
Earthwork for upstream &
downstream abutment
Earthwork for Piers
Total Earth Works
No.
L(m)
B(m)
H(m)
2
1
3
2.5
3.78
3.78
0.5
1
2.5
3.28
0.5
3.28
0.5
2(b)
2( c)
1.28
0.5
2(d)
3.14
0.5
0.5
2(e)
2 (f)
3(a)
1.25
3.28
4.35
3(b)
1.28
4.35
3( c)
3.14
0.5
4.35
1
2
23
23
1.28
0.34
0.34
0.9
Quantity m3 Remarks
11.34
9.45
20.79
8.2
M-15
3.28
M-15
0.64
M-20
1.57
13.69
7.1
M-20
35.67
M-20
5.568
M-20
13.659
54.897
M-20
10.0096
14.076
M25
0.34
24.4256
Sl. No.
2
1
0.34
1.28
1
1
2.15
2.3075
0.9
0.34
0.9
0.975
flumed canal
Area (m2) Volume
(m3)
0.612
0.4352
1.0472
1.935
2.249813
0.31481
0.135
0.2023
0.3373
0.34