Professional Documents
Culture Documents
SLMC - 6TH. Floor Remodel: Mounting Height Mounting Height
SLMC - 6TH. Floor Remodel: Mounting Height Mounting Height
HEIGHT
MOUNTING
HEIGHT
1. CONTRACTOR SHALL VISIT JOB SITE AND THOROUGHLY EXAMINE ALL EXISTING CONDITIONS WHICH MAY AFFECT WORK PRIOR TO
SUBMITTING BID. NO ADDITIONAL COSTS WILL BE CONSIDERED FOR CONTRACTORS FAILURE TO DO SO. EXPOSED PARTS OF
SWITCHBOARDS, PANELS, TRANSFORMERS, BOXES, CONDUITS, ETC. WERE NOT OPENED DURING THE DESIGN PHASE OF THE
PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY NOTIFY THE ENGINEER AND/OR OWNER IF INACCURACIES
OR OTHER DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL FIELD CONDITIONS ARE FOUND.
FIXTURE TYPE
CEILING OUTLET
CIRCUIT NUMBER
SWITCH LEG
RECESSED FIXTURE
AS NOTED
MS
CSFD
48" UNO
STARTER
48" UNO
48" UNO
48" UNO
48" UNO
3. DETERMINE ROUTING OF CONCEALED FEEDERS AND HOMERUNS IN COOPERATION WITH OTHER TRADES TO SIMPLIFY
INSTALLATION WHEREVER POSSIBLE BUT SUBJECT TO APPROVAL OF ENGINEER FOR VISUAL AND STRUCTURAL REASONS.
54" UNO
4. ALL CONDUCTORS SHALL BE COPPER, TYPE THWN-2/THHN 90 DEGREE INSULATION. ALL LUGS SHALL BE 75 DEGREE RATED,
MINIMUM.
5. USE OF FLEXIBLE CONDUIT IS NOT ALLOWED EXCEPT FOR LENGTHS UP TO 6 FEET FOR FINAL CONNECTION TO LIGHTING FIXTURES
OR VIBRATING EQUIPMENT. ALL CONDUITS SHALL INCLUDE A GROUND WIRE SIZED PER CODE. CONCEALED CONDUIT SHOULD BE
INSTALLED WHEREVER POSSIBLE. IF EXPOSED CONDUITS AND BOXES ARE INSTALLED, THEY SHALL BE PAINTED TO MATCH THE
SURFACES WHERE INSTALLED WHEN VISIBLE TO THE PUBLIC.
VAV
2. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS THAT A COMPLETE AND WORKABLE ELECTRICAL INSTALLATION BE
PROVIDED FOR ALL THE EQUIPMENT DESCRIBED OR SHOWN AS BEING IN THIS CONTRACT. FURNISH ALL LABOR AND TOOLS
NECESSARY AND FURNISH AND INSTALL ALL APPARATUS, MATERIALS, EQUIPMENT AND COMPONENTS IN A MANNER COMPLYING
WITH ALL APPLICABLE CODES, INCLUDING ITEMS REQUIRED BUT NOT NORMALLY SHOWN, SUCH AS COUPLINGS, HANGERS,
BRACKETS, CLAMPS, JUNCTION BOXES, PULLBOXES, SMALL GUTTERS, CONNECTORS AND HARDWARE. ANY DISCREPANCIES
BETWEEN THE DRAWINGS AND THE CODE, OR RECOGNIZED STANDARDS SHALL BE BROUGHT TO THE ATTENTION OF THE
OWNER'S AUTHORIZED REPRESENTATIVE AND INSPECTOR OF RECORD PRIOR TO COMMENCING ANY WORK.
6. GREEN INSULATED COPPER GROUNDING CONDUCTOR SHALL BE INSTALLED AND CONNECTED TO EACH POWER OUTLET,
ENCLOSURE, POWER DEVICE, FIXTURE, ETC. THROUGHOUT THE SITE. THE RACEWAYS SHALL NOT BE RELIED UPON FOR
EQUIPMENT GROUNDING.
Project:
7. LABEL ALL RECEPTACLES, JUNCTION BOXES, PULLBOXES, DISCONNECT SWITCHES AND CONTROL DEVICES WITH THEIR SERVING
PANEL AND CIRCUIT NUMBER(S).
8. PROVIDE FIRE STOPPING AT ALL CONDUIT PENETRATIONS OF CEILINGS AND WALLS AND BACK OF ELECTRICAL BOXES
COMPATIBLE WITH AND TO MAINTAIN THE FIRE RATING OF THE STRUCTURE.
48"
18" UNO
9. COORDINATE THE ELECTRICAL WORK WITH THE WORK OF OTHER TRADES.
52" UNO
18" UNO
48"
48"
48" UNO
48" UNO
90" UNO
TV OUTLET
84" UNO
18" UNO
CT
TOP OF COUNTER
WP
18" UNO
CEILING RECEPTACLE
18" UNO
18" UNO
18" UNO
FLOOR OUTLET
SPECIAL PURPOSE RECEPTACLE
18" UNO
18" UNO
11. WHERE ANCHORAGE DETAILS ARE NOT SHOWN ON DRAWINGS, THE FIELD INSTALLATION SHALL BE SUBJECT TO THE APPROVAL
OF THE STRUCTURAL ENGINEER AND THE INSPECTOR.
Client:
Success Healthcare 1
LLC d/b/a Silver Lake
Medical Center
14. ALL NECESSARY CLEARANCES SHALL BE MAINTAINED AT NEW ELECTRICAL EQUIPMENT PER LATEST NEC (WITH STATE
AMENDMENTS).
72" UNO
18" UNO
13.NEW RECEPTACLES WITHIN 6' OF SINK SHALL BE GFCI TYPE. WEATHERPROOF RECEPTACLES SHALL BE GFCI TYPE.
AV
10.ELECTRICAL CONTRACTOR TO VERIFY MOUNTING HEIGHTS OF OUTLET BOXES NEAR, ON OR WITHIN CABINETWORK, SINKS,
MIRRORS, COUNTERS, ETC. OUTLETS SHOWN ON PLANS ARE APPROXIMATE ONLY AND ANY IN CONFLICT WITH OTHER
OBSTRUCTIONS SHALL BE RELOCATED AT NO EXPENSE TO THE OWNER.
DUPLEX RECEPTACLE
GFI
15. ALL METALLIC OBJECTS THAT ENCLOSE ELECTRICAL CONDUCTORS OR THAT MIGHT BE ENERGIZED BY ELECTRICAL CURRENTS
MUST BE EFFECTIVELY GROUNDED. BOND ALL METAL EQUIPMENT PARTS SUCH AS ENCLOSURES, RACEWAYS, BUILDING METAL
STRUCTURE, WATER PIPING, GAS PIPING AND ANY OTHER EQUIPMENT LIKELY TO BECOME ENERGIZED. SHORT SECTIONS OF
METAL ENCLOSURES OR RACEWAYS USED TO PROVIDE SUPPORT OR PROTECTION OF LOW VOLTAGE (LESS THAN 70V) CABLE
ASSEMBLIES FROM PHYSICAL DAMAGE SHALL NOT BE REQUIRED TO BE GROUNDED. PROVIDE GROUND CONTINUITY AS REQUIRED
BY CURRENT APPLICABLE CODES.
16.PROPERLY MOUNT EQUIPMENT TO FLOOR WITH REQUIRED HARDWARE FOR SEISMICALLY RESTRAINING EQUIPMENT AGAINST
SEISMIC FORCES IN ANY DIRECTION.
17.MATERIALS, PRODUCTS, DEVICES, OR FIXTURES INCLUDED IN THESE CONSTRUCTION DOCUMENTS MUST BE NEW AND MUST MEET
OR EXCEED THE REQUIREMENTS OF CALIFORNIA ELECTRICAL CODE (CEC), AMERICAN NATIONAL STANDARD INSTITUTE (ANSI),
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE), NATIONAL ELECTRICAL MANUFACTURING ASSOCIATION (NEMA),
CALIFORNIA ADMINISTRATIVE CODE: TITLE 24, CITY OF ANAHEIM, ADOPTED ELECTRICAL ORDINANCE.
18.NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE
DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT.
48"
19. ALL ELECTRICAL WORK SHALL COMPLY WITH CURRENTLY ADOPTED NATIONAL ELECTRICAL CODE (WITH STATE AMENDMENTS)
AND LOCAL JURISDICTION CODE.
20.OUTLET BOXES LOCATED ON OPPOSITE SIDES OF RATED WALLS SHALL BE SEPARATED PER DETAIL 2/E-002, REGARDLESS OF
LOCATIONS SHOWN ON DRAWING.
Stamp:
21.THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO RECONSTRUCT THE HOSPITAL BUILDING IN ACCORDANCE WITH THE 2013
CBSC. SHOULD ANY CONDITION DEVELOP NOT COVERED BY THE APPROVED CONSTRUCTION DOCUMENTS, WHEREIN THE
FINISHED WORK WILL NOT COMPLY WITH THE 2013 CBSC, AMENDED CONSTRUCTION DOCUMENTS (ACDS) DETAILING AND
SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY OSHPD BEFORE PROCEEDING WITH THE WORK.
22.SUPPORTS AND ATTACHMENTS OF ALL EQUIPMENT TO BE INSTALLED AS A PART OF THIS PROJECT SHALL BE DETAILED ON
CONSTRUCTION DOCUMENTS, EXCEPT THOSE EXEMPT BY THE 2013 CBC SECTION 1616A.1.18. EQUIPMENT SUPPORTS AND
ATTACHMENTS SHALL BE APPROVED BY THE APPROPRIATE DESIGN PROFESSIONAL OF RECORD (DPR) AND OSHPD AS A PART OF
FIELD REVIEWS /OBSERVATIONS. THE INSPECTOR OF RECORD (IOR) SHALL ASSUME THAT THE ABOVE REQUIREMENTS ARE
ENFORCED
23.PROVIDE QUANTITY OF #12 CONDUCTORS IN 1/2" CONDUIT MINIMUM TO OBTAIN SWITCHING AND POWER FEED CIRCUITING AS
SHOWN. ALL BRANCH CIRCUITS SHALL INCLUDE A GROUND CONDUCTOR.
JUNCTION BOX
C.
THE SEOR SHALL DESIGN ANY SUPPLEMENTARY FRAMING THAT IS NEEDED TO RESIST THE LOADS, MAINTAIN STABILITY AND/OR
IS REQUIRED FOR INSTALLATION OF PRE-APPROVED SYSTEM.
THE SUPPLEMENTARY FRAMING SHALL BE SUBMITTED TO OSHPD AS AN AMENDED CONSTRUCTION DOCUMENTS (ACD).
THE LAYOUT DRAWINGS (WITH THE SHOP DRAWING STAMP) SHALL BE SUBMITTED TO THE OSHPD TO REVIEW:
1) STRUCTURE SUPPORTING THE DISTRIBUTION SYSTEM HAS ADEQUATE CAPACITY;
2) SEISMIC DESIGN FORGES (FP) ARE IN ACCORDANCE WITH THE CBC 2013; AND
3)
a. SIZE OF DISTRIBUTION SYSTEM COMPONENTS,
b. SPACING OF BRACING AND FLEX JOINTS, AND
c. SUBSTRATE FOR ATTACHMENTS
D.
THE LAYOUT DRAWINGS (WITH THE SHOP DRAWING STAMP) SHALL BE KEPT ON THE JOBSITE AND CAN THEN BE USED FOR
INSTALLATION OF THE SUPPORT AND BRACING.
OSHPD FIELD STAFF WILL REVIEW THE INSTALLATION.
E.
A COPY OF THE CHOSEN BRACING SYSTEM(S) INSTALLATION GUIDE/OPM MANUAL SHALL BE ON THE JOBSITE PRIOR TO
STARTING THE INSTALLATION OF HANGER AND/OR BRACES.
F.
Drawing Title:
ELECTRICAL TITLE
SHEET
1
2
398-15-200
11/02/2015
CD
JJB
ALH, JJS
S153113-19-00
DATE
12/1/2015
3/1/2016
DESCRIPTION
OSHPD SUBMITTAL
OSHPD BACKCHECK 1
5/27/2016 OSHPD BACKCHECK 2
Agency Approval:
Drawing No.:
E-001