In order to achieve the required operating efficiency each the operation volume provides 8 minutes residence

time, this residence time takes account of the main package flow and the additional recycle flow for the gas

sparge. Produced water enters in the inlet section of the vessel where a deflector plate / baffle ensures even
flow distribution across the vessel cross sectional area of the vessel. The produced water then passes down
the length of the vessel through four flotation cells. Each flotation cell is separated from the next by a
perforated baffle, this baffle is designed to maintain uniform flow through the flotation cell.