Professional Documents
Culture Documents
Oil & Gas Production Enterprise (Ogpe) : Final Documentation 20" Bi-Directional Pipe Prover Project
Oil & Gas Production Enterprise (Ogpe) : Final Documentation 20" Bi-Directional Pipe Prover Project
ENTERPRISE (OGPE)
FINAL DOCUMENTATION
20 BI-DIRECTIONAL PIPE PROVER
PROJECT
PART 1
PART 1
Engineering
1.1.3
REVISION :1
Phase
380v, 3ph
380v, 3ph
Qty
1
1
Unit (kw)
7
450
Total
Safety Margin
Total for 380VAC, 3 Phase, 50Hz (kw)
Qty
1
1
1
1
Unit (kw)
0.6
0.6
0.5
0.3
Total
Safety Margin
Total for 220VAC, 1 Phase, 50Hz (kw)
C. Supervisory Computer - Panel Single Phase Power Requirement (UPS)
Item
Description
Phase
1
Report Printer
220v, 1ph
Qty
1
Unit (kw)
0.2
Total
Safety Margin
Total for 220VAC, 1 Phase, 60Hz (kw)
1
0
REV
16.07.2012
06.03.2012
DATE
AS-BUILT
ISSUED FOR REVIEW
DOCUMENT ISSUED PURPOSE
TYNG
TYNG
PREPARED BY OVAL
Subtotal (kw)
7
450
457.0
30%
594
Subtotal (kw)
0.6
0.6
0.5
0.3
2.00
30%
2.60
Subtotal (kw)
0.2
0.20
30%
0.26
VL
VL
APPROVAL BY