OIL & GAS PRODUCTION

ENTERPRISE (OGPE)

FINAL DOCUMENTATION
20 BI-DIRECTIONAL PIPE PROVER
PROJECT

PART 1
PART 1

ENGINEERING & DESIGN DOCUMENTS


1.1

Engineering
1.1.3

Utility Consumption List

PROJECT: VSP 20" BI-DIRECTIONAL PIPE PROVER


OVAL DOCUMENT NO:OVL076-GEN-05

REVISION :1

UTILITY POWER CONSUMPTION LIST


A. Three Phase Power Requirement
Item
Description
1
MOV-01
2
Pump Starter Panel

Phase
380v, 3ph
380v, 3ph

Qty
1
1

Unit (kw)
7
450

Total
Safety Margin
Total for 380VAC, 3 Phase, 50Hz (kw)

B. Flow Computer - Panel Single Phase Power Requirement (UPS)


Item
Description
Phase
1
Control Panel 24VDC Power Supply 1
220v, 1ph
2
Control Panel 24VDC Power Supply 2
220v, 1ph
3
Recepticles/Service Socket
220v, 1ph
4
Ventilation Fan & Light
220v, 1ph

Qty
1
1
1
1

Unit (kw)
0.6
0.6
0.5
0.3

Total
Safety Margin
Total for 220VAC, 1 Phase, 50Hz (kw)
C. Supervisory Computer - Panel Single Phase Power Requirement (UPS)
Item
Description
Phase
1
Report Printer
220v, 1ph

Qty
1

Unit (kw)
0.2

Total
Safety Margin
Total for 220VAC, 1 Phase, 60Hz (kw)

1
0
REV

16.07.2012
06.03.2012
DATE

AS-BUILT
ISSUED FOR REVIEW
DOCUMENT ISSUED PURPOSE

TYNG
TYNG
PREPARED BY OVAL

Subtotal (kw)
7
450
457.0
30%
594

Subtotal (kw)
0.6
0.6
0.5
0.3
2.00
30%
2.60

Subtotal (kw)
0.2
0.20
30%
0.26

VL
VL
APPROVAL BY