Construction of Concrete Foot Bridge PROJECT PROPOSAL

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
Republic ofthe Phitppines PROVINCE OF COTABATO Municipality of Mang CERTIFICATE OF FINAL ACCEPTANCE AND TURN-OVER Turn-Over of the Construction of Footbridge By way of the issuance ofthe Certificate of Completion forthe: Project Tile CONSTRUCTION OF FOOTBRIDGE Location Bagontapay Creek, Bagontapay, Milang, Cotabato Source of Fund PCF 2012, CDF & BEDF 2012 _ Project Cost P_ 580,000.00, P 140,000.00 ee = Date Started September 16, 202 ae __ Date Completed: March 15, 2013, As certified by the Mlang Municipal Engineering Otfice. |, Municipal Mayor of the Municipal Government of Miang hereby formaly turnover tothe Barangay Council and is constuens of Barangay Bagontapay, Mlang, Cotabato, the completed facility as above described HON. JOSELITO F.PINOL Municipal Mayor Acceptance By virtue of this Certificate, through the undersigned, hereby accepts the completed structure(s) as above- described and confirms assumption of responsibilty with regard to custody, security, care and maintenance of the structure and its tacit, HON. ALFRGD0 6 AIAGBANUA Barafgay Chatman Y Issued this 4 day of April 2013.

You might also like